• 제목/요약/키워드: BIM, Design

검색결과 692건 처리시간 0.024초

Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage

  • Choi, Jungsik;Kim, Hansaem;Kim, Inhan
    • Journal of Computational Design and Engineering
    • /
    • 제2권1호
    • /
    • pp.16-25
    • /
    • 2015
  • Since construction projects are large and complex, it is especially important to provide concurrent construction process to BIM models with construction automation. In particular, the schematic Quantity Take-Off (QTO) estimation on the BIM models is a strategy, which can be used to assist decision making in just minutes, because 70-80% of construction costs are determined by designers' decisions in the early design stage. This paper suggests a QTO process and a QTO prototype system within the building frame of Open BIM to improve the low reliability of estimation in the early design stage. The research consists of the following four steps: (1) analyzing Level of Detail (LOD) at the early design stage to apply to the QTO process and system, (2) BIM modeling for Open BIM based QTO, (3) checking the quality of the BIM model based on the checklist for applying to QTO and improving constructability, and (4) developing and verifying a QTO prototype system. The proposed QTO system is useful for improving the reliability of schematic estimation through decreasing risk factors and shortening time required.

Exploring Integrated Design Strategies for the Optimal Use of BIM

  • Park, Hyoung-June;Lee, Ji-Hyun
    • Architectural research
    • /
    • 제12권2호
    • /
    • pp.9-14
    • /
    • 2010
  • This paper introduces an experimental design studio that explores the optimal use of current digital technologies in order to employ Building Information Modeling at the early phase of design process. Based upon the outcomes from the aforementioned studio, the paper discusses the integrated design strategies for BIM in the design process. In this paper, BIM is proposed as a design tool that increases an overal design productivity more effectively and efficiently compared to BIM as a construction tool with encouraging a design communication among different partakers in the design process.

토목공사 기획 및 설계단계의 BIM 적용방안 연구 (BIM Application for Civil Engineering Project in Planning and Design Phases)

  • 강인석;김슬기;김현승;문현석
    • 한국BIM학회 논문집
    • /
    • 제1권1호
    • /
    • pp.26-31
    • /
    • 2011
  • 국내에서 BIM의 실무 활용은 건축공사 중심으로 적용되고 있다. 건축공사의 부위별 객체 특성이 정형적, 수직적, 반복적인 형태를 갖는 반면에 토목공사의 객체 특성은 비정형적, 수평적, 비반복적인 형태를 갖으므로 3D객체 구성이 어렵기 때문이다. 본 연구에서는 토목공사의 기획단계부터 설계단계까지의 업무 및 정보관리의 문제점을 파악한 후 BIM기반에서의 적용 프로세스를 제안하며, 제시한 프로세스를 기반으로 BIM시스템을 구축하여 교량공사를 대상으로 실무 적용성을 검토한다.

A Case Study on BIM-enabled Evaluation of Design Alternatives for an Actual Remodeling Project in Korea - Focusing on the Spatial Program Review in Early Phase of Design -

  • 김현정;이진국
    • 한국실내디자인학회논문집
    • /
    • 제24권5호
    • /
    • pp.117-127
    • /
    • 2015
  • This paper depicts a case study of the BIM (Building Information Modeling)-enabled evaluation of design alternatives for an actual remodeling project in Yeongwol, Korea. The increase of urban population and income followed by the growth of economy has derived massive supply of grand scale housing project in Korea since 1970s. Consequently, building remodeling became one of the feasible resolutions for renovating such old housings in these days. This paper aims to introduce a technical approach to such remodeling projects based on BIM-enabled applications focusing on quantitative analysis of design alternatives. Among the technical issues of such building remodeling projects, this paper focuses on the BIM-enabled area analysis and comparison between design alternatives to support decision-making even in early phase of remodeling design process. BIM and its variety of applications have broadly influenced the domain of AEC-FM (Architecture, Engineering, Construction, and Facility Management) within the lifecycle of buildings. As one of the applications facilitated by BIM, the automated area calculation and scenario-based comparison between alternatives can play an important role in the early phase of remodeling project. We modeled three design alternatives (buildings) and three housing modules (units) based on the actual case in Yeongwol city, Korea using a BIM design authoring tool. Nine combinatorial BIM models were demonstrated for the BIM-enabled review process described in this paper. To determine the most optimal design scenario among nine alternatives, this paper demonstrates a result of the conducted spatial program review. The main subject includes specific spatial program issues on; 1) the number of unit spaces; and 2) area of individual/grouped and private/shared spaces.

BIM 속성정보를 활용한 4D, 5D 설계 지원 알고리즘 구현 및 검증에 관한 연구 - 공정시뮬레이션과 물량산출을 중심으로 - (A Study on Implementation of 4D and 5D Support Algorithm Using BIM Attribute Information - Focused on Process Simulation and Quantity Calculation -)

  • 정재원;서지효;박혜진;추승연
    • 대한건축학회연합논문집
    • /
    • 제21권4호
    • /
    • pp.15-26
    • /
    • 2019
  • In recent years, researchers are increasingly trying to use BIM-based 3D models for BIM nD design such as 4D (3D + Time) and 5D (4D + Cost). However, there are still many problems in efficiently using process management based on the BIM information created at each design stage. Therefore, this study proposes a method to automate 4D and 5D design support in each design stage by using BIM-based Dynamo algorithm. To do this, I implemented an algorithm that can automatically input the process information needed for 4D and 5D by using Revit's Add-in program, Dynamo. In order to support the 4D design, the algorithm was created to enable automatic process simulation by synchronizing process simulation information (Excel file) through the Navisworks program, BIM software. The algorithm was created to automatically enable process simulation. And to support the 5D design, the algorithm was developed to enable automatic extraction of the information needed for mass production from the BIM model by utilizing the dynamo algorithm. Therefore, in order to verify the 4D and 5D design support algorithms, we verified the applicability through consultation with related workers and experts. As a result, it has been demonstrated that it is possible to manage information about process information and to quickly extract information from design and design changes. In addition, BIM data can be used to manage and input the necessary process information in 4D and 5D, which is advantageous for shortening construction time and cost. This study will make it easy to improve design quality and manage design information, and will be the foundation for future building automation research.

BIM 표준프레임워크 기반의 건축 표준상세도면 구축방안 (Study for Architectural Standard Details Based On BIM Information Framework)

  • 권순호;이운재;조찬원
    • 한국CDE학회논문집
    • /
    • 제18권2호
    • /
    • pp.93-103
    • /
    • 2013
  • In the situation where there should be a gap between the design environments of 2D drawing and 3D BIM modeling, it is unavoidable aspect to face confusion caused by parallel usage of both technologies unless the project delivery systems are entirely upgraded to 3D. Therefore, it is critical to make efforts to minimize this confusion. Meanwhile, detailed drawings have very important roles in the construction process because they do not only concretely express construction methods for a given design plan but also provide basis for quantity takeoff and construction cost estimation etc. This paper suggests a plan to standardize detailed information based on BIM standard framework in order to make BIM realize the information. In the short term, this plan provides improved environment where both BIM and CAD technologies can be applied and, in the long term, it provides bases for BIM to replace CAD technology.

개방형BIM기반의 건축공사 개산견적을 위한 물량산출 적용지침 활용방안 기초 연구 (A Basic Study on an Application of Quantity Take-Off Requirements for Open BIM-based Schematic Estimation of Architectural Work)

  • 김인한;엄성곤;최중식
    • 한국CDE학회논문집
    • /
    • 제20권2호
    • /
    • pp.182-192
    • /
    • 2015
  • In recent years, numerous studies have attempted to extract quantity data by using Building Information Modeling (BIM). In terms of open-BIM based quantity take-off at the early design stage, only few studies were conducted in the field of cost engineering. A lack of compatibility of open BIM for information exchange is postulated as the cause. The Industry Foundation Classes (IFC) extension model has been developed to accommodate the interoperability with quantity take-off software. Improvement of open BIM for quantity take-off needs exchange requirements and model guidelines. For this purpose, the quantity data of IFC models were analyzed using BIM analysis tools. This paper also provides a proposal of requirements on open BIM based quantity take-off at the early design stage. Further this study have been develop the interface system for open BIM based quantity take-off requirements with the results on this study.

BIM기반 건축물 인허가 신청을 위한 정보 관리방안 (A Method of Information Management for BIM Based Building Permission)

  • 여창재;김가람;김구택;유정호
    • 한국CDE학회논문집
    • /
    • 제21권3호
    • /
    • pp.242-251
    • /
    • 2016
  • Around the world, BIM application has been mandated. In Korea, an announcement was made in 2016 that BIM application will be required for all public constructions ordered by the Public Procurement Service. However, BIM cannot be used for building permits as Seumter, a building permit system, doesn't support BIM, even if it was used for building design. To utilize BIM for permit application, this study introduces a method of management for BIM-used permit application information. It was done by analyzing the data entered for new building permit application in Seumter. For the analysis, the permit application information is classified as internal BIM information and external BIM information and the required information is defined. To easily create and utilize the data types at the design stage, this study introduces a method of creating and utilizing a permit template. Also, this study developed a tool for combining the area information to add up all the related information such as gross floor area and floor area ratio. This study is significant in that it analyzes the required information for new building permit application among all the permit application types in Korea.

패스트트랙 환경에서 FAB신축을 지원하는 BIM기반 AR 시스템 개발 (AR system for FAB construction management using BIM data under fast track condition)

  • 이상원;이광수;최성인;류성찬;박정서
    • 한국BIM학회 논문집
    • /
    • 제12권4호
    • /
    • pp.1-18
    • /
    • 2022
  • New Fabrication Facility (FAB) construction is performed with Building Information Modeling (BIM) based design. The BIM design data keep updated during the FAB construction. To improve fast-track construction management, a Fabrication Facility Augmented Reality (FABAR) was developed. This study introduces a FABAR system development process and shows performance evaluation results of the FABAR prototype system. The FABAR is implemented with three major modules: Augmented Reality (AR) visualization unit (Room-box) to transfer big BIM data to AR data, AR registration and tracking unit to match AR with real scape and to keep AR coordination in real, and AR data management unit to enhance usability. The prototype performance results were as follows: visualization of design BIM data via AR within 24 hours, precise AR registration and tracking registration, and appropriate usability to support FAB construction management at site. The results indicate that the FABAR is applicable for FAB construction management. Especially, the BIM data transformation method using Room-box in this study signifies a new construction management approach using fluctuating BIM design data in the fast track construction condition.

READINESS OF NIGERIAN BUILDING DESIGN FIRMS TO ADOPT BUILDING INFORMATION MODELLING (BIM) TECHNOLOGIES

  • Mu'awiya Abubakar;Yahaya Makarfi Ibrahim;Kabir Bala
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.640-647
    • /
    • 2013
  • Building Information Modelling (BIM) has become the new international benchmark for efficiency in design, construction and maintenance of buildings. It is the platform that brings about collaboration between project stakeholders and improvement of project outcomes. With all its potentials, not much of the impact of BIM technologies has been felt in the Nigerian construction industry. This research aimed at assessing the readiness of the Nigerian building design firms to adopt BIM technologies. The research was exploratory in nature. A field survey was conducted with the use of structured questionnaire, self administered to a sample of building design consultancy firms (architectural, structural, M&E, quantity surveying, and multi-disciplinary design firms) within Abuja and Kaduna. The questionnaire sought the perception of the responding firms on the factors affecting BIM adoption in the Nigerian construction industry, and their level of readiness to adopt BIM technologies in their practices based on the four categories of readiness-management, people, process and technology. 42.26% response rate was achieved and used for analysis. ANOVA and DUNCAN post-hoc tests were used to establish the differences between the responses of the groups of firms, while means and standard deviations were obtained to establish the important factors affecting BIM adoption in Nigeria. The survey revealed that all the groups of Nigerian design firms are appreciably ready for the adoption of BIM technologies in their practice, with slight variations in their respective levels of readiness. 'Lack of awareness of BIM technology among professionals' and clients and 'lack of knowledgeable and experienced partners' were identified as the most important barriers of BIM adoption in Nigeria; while the most significant drivers are 'availability of well trained professionals' and 'cooperation and commitment of professional bodies to the adoption'. Education and training of building design professionals and cooperation of all stakeholders in the design and construction supply chain were recommended as part of measures to ensure successful adoption of BIM in the Nigerian construction industry.

  • PDF