• Title/Summary/Keyword: BIM(Building information Modeling)

Search Result 800, Processing Time 0.027 seconds

A Study on the Application of BIM for Reinforcement Concrete Structural Work (철근 콘크리트 공사에서의 BIM 적용 연구)

  • Ahn, Jae-Hong;Lim, Nam-Gi
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.158-166
    • /
    • 2018
  • The application of the BIM for architectural and structural work accompanied many trials-and-errors on project based on BIM by this time Ten years have passed since BIM issued, but it is not activated. This study suggests ways to activate BIM for architectural and structural work. The reason for choosing the structure construction is as follows. Construction cost is a high proportion of structural construction cost. On the other hand, the number of related materials is small, and the first in the 3D modeling process is structure modeling. And build BIM-based Structural Database by quantity take-off. This study shows the applicability of BIM through practical cases. This study is expected to provide suggestion for the successful implementation of BIM-based projects.

A Study on Setting Up Work Conditions for Improving Productiviyt of BIM-based Cost Estimation (BIM 견적 작업 생산성 향상을 위한 업무 환경 조성에 관한 연구)

  • Kim, Seong-Ah;Park, Gweon;Song, Byeong-Seob;Choi, Chel-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.56-65
    • /
    • 2016
  • Many cases have mentioned the effect by applying BIM on the media such as at conferences, workshops, reports, ect. These cases reported that costs could be saved directly by prevention the need to re-do and reconstruct caused by using BIM. BIM users mentioned that using BIM has potential value in saving costs. The benefits of the BIM include intangible value that cannot be estimated in costs, such as reducing work time and improving productivity. However, the financial value of using BIM, such as Return on Investment, has not yet been exposed, and BIM users have a negative view of the financial value of BIM in Korea. Therefore, this study has researched the effects of applying BIM on construction estimate services in view of business productivity, not finance. This study compared the traditional and BIM based estimation, and verified the effect of estimating BIM through work sampling. This study investigated a precondition for getting the effects of BIM based estimation. The results show a need for BIM education, 3D Modeling standards, and database on quantity in order to improve product ivity and reduce work time on BIM based estimation

The Current Status of BIM in the Field of Landscape Architecture and the Issues on the Adoption of LIM (BIM에 관한 조경분야의 동향 및 LIM 활성화 방안)

  • Kim, Bok-Young;Son, Yong-Hoon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.42 no.3
    • /
    • pp.50-63
    • /
    • 2014
  • Since the new millennium, BIM has been widely adopted to improve productivity in the field of architecture, engineering, and construction with the government policies of each country. After its first introduction into the field of landscape architecture in USA, BIM has been debated on its merits and limitations mainly by the European countries' academic and, at the same time, practical worlds. However, little attention has been paid to BIM, in particular, in the field of landscape architecture in Korea leaving many issues to solve to fully utilize BIM. The purpose of this study is to present the main issues and strategic agenda for the successful introduction of BIM in landscape architecture in Korea. This study shows that the new derived word of LIM(Landscape Information Modeling) instead of BIM appeared in the field of landscape architecture. Then, this paper discusses the main issues on standardization and interoperability in the adoption of LIM to create, integrate, and reuse landscape information. Finally, four strategic agenda are presented to successfully introduce LIM into the domestic field of landscape architecture by reviewing the societies of the landscape discipline in UK and Norway that play a leading role by organizing BIM working groups.

Comparative Analysis of BIM Acceptance Factors between Korea and China (한국과 중국의 BIM 수용영향요인 비교분석)

  • Song, Jingxu;Lee, Seulki;Yu, Joungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.3-14
    • /
    • 2021
  • In the Chinese construction industry, the utilization of Building Information Modeling (BIM) aims to increase the total output of the construction industry by solving the problem of inefficient interoperability in the construction industry. In 2011, the Chinese Ministry of Housing and Urban-Rural Development despite the technical advantages of BIM and the government policy, the BIM adoption rate in China is lower than 45%. Meanwhile, as the South Korean construction industry is a step ahead of its Chinese counterpart in introducing and utilizing BIM, it is expected that BIM is more actively utilized and accepted in South Korea than in China. According to a comparative study based on the hype-cycle theory, South Korea is at a more advanced stage of introducing BIM, than in China. This study aimed to suggest how to increase BIM utilization rates in China. To this end, this study comparatively analyzed factors affecting BIM acceptance between China and South Korea. For the comparative analysis of the BIM acceptance factors between China and South Korea, literature reviews on the technology acceptance model (TAM) and BIM acceptance model were carried out, and based on that, the BIM acceptance factors were classified. Other BIM acceptance factors were also added and considered, as they reflected Chinese national characteristics and construction industry. As for the derived BIM acceptance factors, construction project participants, especially actual BIM users in China and South Korea, were targeted for the survey. A t-test using SPSS 22.00 was carried out to identify significant differences in data. Finally, based on the t-test results, this study suggested ways of improving the BIM utilization rate in China. Based on the findings, this study is expected to contribute to activating BIM adoption in the Chinese construction industry and also to set a theoretical foundation for future studies on BIM utilization in the industry.

Interview - Standardization of Design Drawings·Modular Building⋯ "The era of BIM? Already has come." (인터뷰 - 설계도면 표준화·모듈러 건축⋯ "BIM의 시대? 이미 왔다")

  • Lee, Yu-Ri
    • Korean Architects
    • /
    • s.615
    • /
    • pp.28-31
    • /
    • 2020
  • 도입까지 시간이 걸릴 것이라고 예측됐던 건설정보모델링(BIM : Building Information Modeling, 이하 BIM)이 어느새 성큼 다양한 분야에 진입했다. 영국, 싱가포르, 미국 등 해외에서는 이미 공공사업 시 BIM을 적극적으로 활용하고 있다. 우리나라 또한 2018년 국토교통부에서 '스마트 건설기술 로드맵'을 마련한 후 공공사업에 BIM을 단계적으로 도입해왔다. 대부분의 발주기관들은 오는 2025년까지 공공사업에 BIM을 전면 도입한다는 계획이다. 성균관대학교 공과대학 건설환경공학부 및 미래도시융합공학과 교수이자 국제건설자동화학회의 종신 상임이사인 권순욱 교수는 '스마트 건설 관리' 연구자이자 국내외에서 활동 중인 CM, BIM의 권위자다. 관련 분야의 책 8권과 100편 이상의 논문을 집필하고 30여 개의 특허·소프트웨어 등록을 보유하고 있다. 텍사스 오스틴 대학교 토목공학 박사 출신으로, 삼성물산, 한국건설기술연구원 등 일반 기업과 국가기관에서 실무와 이론을 두루 경험하며 경력을 쌓았다. 건설연구개발사업, 첨단 융복합 건설기술 등 다수의 국가 건설 R&D에 참여해 초고층 자재, 안전 모니터링, BIM 프로세스 표준개발 등의 시스템을 개발하기도 했다. 해외 연구자들과의 교류에도 적극적이다. 세계 석학들과 '노령 공학' 관련 영문교과서를 공동 집필(스마트주택 챕터 담당)했고, 2016년과 2019년엔 국제건설자동화학회와 국제프로젝트관리학회의 연사 자격으로 강단에 섰다. "영국, 싱가포르 등에선 공공사업을 100% BIM으로 발주하기 시작했습니다. 우리나라 정부도 비슷한 길을 가고 있습니다. 일정 규모의 발주 물량이 안정적으로 나오는 공공기관에서 그렇게 한다는 것은 국가가 전체 패러다임을 바꾸겠다는 의지 아닐까요?" 6월 10일 그의 연구실에서 권순욱 교수를 만나 BIM의 현황과 전망에 대해 들어봤다.

  • PDF

BIM-BASED PLANNING OF TEMPORARY FACILITIES FOR CONCRETE CONSTRUCTION

  • Kyungki Kim;Jochen Teizer
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.1-6
    • /
    • 2013
  • Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.

  • PDF

A Study on Reuse 3D MCAD Data for BIM based Library Creation - Focusing on the Mechanical BIM Library - (BIM 라이브러리 제작을 위한 3차원 MCAD 데이터의 재사용에 관한 연구 - 기계 설비 분야 BIM 라이브러리 중심으로 -)

  • Choi, Dong-Kwon;Kim, Jay-Jung
    • Korean Journal of Computational Design and Engineering
    • /
    • v.19 no.3
    • /
    • pp.263-271
    • /
    • 2014
  • Recent AEC industry, is introducing BIM based design process which mainly focuses on collaboration and integration. Since BIM has characteristic of utilizing several design libraries in various fields across the AEC industry, obtaining BIM libraries are essential for introducing and applying the BIM successfully. Thus, creating BIM libraries and guidelines for various fields are needed. BIM libraries can be categorized into disciplines such as architectural, structural, mechanical and electrical industries. Especially, companies in mechanical industry possesses design data for creating BIM library. Due to the fact, we standardized the property information for BIM libraries. And for BIM library production, we have developed a program which uses neutral format to convert 3D MCAD data designed by $NX^{TM}$ into $Revit^{TM}$ Family. Finally, we developed a program that merges property information to Revit Family file.

Pedagogical Issues of Performance Oriented Digital Design - Focused on Kinetic Facade Design - (성능지향적 디지털 설계의 교육방법론 연구 - 키네틱 파사드 설계과정을 중심으로 -)

  • Jang, Do-Jin;Kim, Sung-Ah
    • Journal of KIBIM
    • /
    • v.5 no.1
    • /
    • pp.35-43
    • /
    • 2015
  • Existing pedagogical issues of digital design including BIM have been focused not on potential of Digital Design but on skills of BIM or digital modeling tool. Kinetic facade can move or change material state to react surrounding environment conditions. It is a suitable design object for teaching principle of Performance Oriented Digital Design. Variables of movements affect multi-criteria of performances of kinetic facade, so different design approach from fixed facade design should be explored. Kinetic facade design process is proposed to study pedagogical issues of Performance Oriented Digital Design in this paper. Through Kinetic facade design process, students can understand conditions, variables, and performances of digital design.

IFC Property Set-based Approach for Generating Semantic Information of Steel Box Girder Bridge Components (IFC Property Set을 활용한 강박스교 구성요소의 의미정보 생성)

  • Lee, Sang-Ho;Park, Sang Il;Park, Kun-Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.687-697
    • /
    • 2014
  • This study ranges from planning phase to the detailed design phase of steel box girder bridge and proposes ways to generate semantic information of components through Industry Foundation Classes (IFC), a data model for Building Information Modeling (BIM). The classification of components of steel box girder bridge was performed to define information items required for identifying semantic information based on IFC, and spatial information items based on topology and physical information items based on functions of components were classified to create additional properties that does not support IFC by applying user-defined property set within the IFC framework. Steel box girder bridge information model based on IFC was implemented through BIM software and semantic information input interface, which was developed in this study to examine the effectiveness of the additionally created user-defined property. Furthermore, the quantity take-off of components was performed through information model of steel box girder bridge, and the applicability of the proposed method was tested by comparing the quantity take-off based on design document with the result.

A Study on the Revitalization of BIM in the Field of Architecture Using AHP Method (AHP 기법을 이용한 건축분야 BIM 활성화 방안 연구)

  • Kim, Jin-Ho;Hwang, Chan-Gyu;Kim, Ji-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.473-483
    • /
    • 2022
  • BIM(Building Information Modeling) is a technology that can manage information throughout the entire life cycle of the construction industry and serves as a platform for improving productivity and integrating the entire construction industry. Currently, BIM is actively applied in developed countries, and its use at various overseas construction sites is increasing This is unclear. due to air shortening and budget savings. However, there is still a lack of institutional basis and technical limitations in the domestic construction sector, which have led to the lack of utilization of BIM. Various activation measures and institutional frameworks will need to be established for the early establishment of these productive BIMs in Korea. Therefore, as part of the research for the domestic settlement and revitalization of BIM, this study derived a number of key factors necessary for the development of the construction industry through brainstorming and expert surveys using AHP techniques and analyzed the relative importance of each factor. In addition, prior surveys by a group of experts resulted in 1, 3 items in level, 2, 9 items in level, and 3, 27 items in level, and priorities analysis was performed through pairwise comparisons. As a result of the AHP analysis, it was found that the relative importance weight of policy aspects was highest in level 1, and the policy factors in level 2 and the cost-based and incentive system introduction factors were considered most important in level 3. These findings show that the importance of the policy guidance or institutions underlying the activation of BIM rather than research and development or corporate innovation is relatively high, and that the preparation of policy plans by public institutions should be the first priority. Therefore, it is considered that the development of a policy system or guideline must be prioritized before it can be advanced to the next activation stage. The use of BIM technologies will not only contribute to improving the productivity of the construction industry, but also to the overall development of the industry and the growth of the construction industry. It is expected that the results of this study can provide as useful information when establishing policies for activating BIM in central government, relevant local governments, and related public institutions.