• 제목/요약/키워드: BIM(Building Information Modeling) Project

검색결과 292건 처리시간 0.023초

소규모 건축공사의 BIM 정보 활용을 위한 프로세스 제안 - 철골공사 중심으로 - (Process of Using BIM for Small-Scale Construction Projects - Focusing on the Steel-frame Work -)

  • 김진광;유무영;함남혁;김재준;최창식
    • 한국BIM학회 논문집
    • /
    • 제8권2호
    • /
    • pp.41-50
    • /
    • 2018
  • The current study focused on the utilization of building information modeling (BIM) data in steel-frame structures, which help to reduce project durations because they employ prefabricated structural members that are assembled on-site. In addition, a business process model was proposed using BIM data collected during the preconstruction, structural steel fabrication, and on-site construction phases of an actual steel-frame project. The ultimate expectation is that BIM data support at each phase, as well as the increased understanding among project participants, will result in an increase in project management productivity. The results from the current study are summarized as follows: To implement a BIM capable of application to steel-frame projects and data utilization, existing theories were studied to develop the construction project steps, both generally into the preconstruction (A1), steel fabrication (A2), and on-site construction phases, (A3) and specifically into 19 BIM-applicable phases. Based on the derived BIM-applicable phases, the model elements of the BIM object were identified, and the shortcomings of existing steel-frame projects were ameliorated, resulting in an improved data flow model. Moreover, for the proposed BIM data flow to progress efficiently, the BIM specialist needs to be well-acquainted with the phase-specific three-dimensional (3D) model output, and the infrastructure to construct an error-free 3D model must be provided. Based on the actual construction example, the BIM data utilized steel-frame projects - via production reports, clash checks, two-dimensional (2D) drawings, four-dimensional (4D) simulations, and 3D scanning - to make cooperation and communication among participants easier.

BIM 라이브러리를 활용한 철도 인프라의 모델링 자동화 기술 개발 (Development of Automation Technology for Modeling of Railway Infrastructure using BIM Library)

  • 김윤옥;문소영;윤희택;박영곤;김지영
    • 한국BIM학회 논문집
    • /
    • 제12권3호
    • /
    • pp.18-29
    • /
    • 2022
  • Recently, research on the application of BIM has continuously been active not only in architecture but also in civil engineering in order to improve work efficiency across the project's planning, design, construction and maintenance phases. However, the empirical applications of BIM targeting to civil engineering scope of construction sites still lags compared to architectural sized projects. This is because BIM tools are mainly based upon vertical structures of architecture, thereby most of them have difficulties and limitations to get utilized on horizontal structures of civil engineering. Therefore, this study intends to propose automation technology of design using BIM library and to indicate its field availability through case application on a railway project representing linear infrastructure. In addition, it put forward the utilization plan of the automation technology upto 4D and 5D by continue making use of the BIM model created in the project's design stage up through the maintenance stage. The novel method of the technology proposed in this paper incorporates the automatic creation of the BIM library based on two-dimensional tunnel cross-sections and sweeping of it over three-dimensional alignment to create a BIM model of linear infrastructure. The proposed technology is anticipated to improve the efficiecny of modeling process of railway projects based on linear structures.

BIM 기반의 골조공사에서 참여자별 정보의 흐름 도출에 관한 연구 (A Study for Derivation of Participant's Information Flow At Framework Construction based on BIM)

  • 김용화;이주성;오중근;김재준
    • 한국건설관리학회논문집
    • /
    • 제14권2호
    • /
    • pp.22-34
    • /
    • 2013
  • 최근 건설 프로젝트가 대형화, 복잡화, 전문화되면서 다양한 참여자들 사이에서 발생하는 방대한 양의 정보 활용이 중요해지고 있다. 특히 이러한 정보는 건설프로젝트에서 주도적인 역할을 담당하는 건설현장에서 주로 생산된다. 건설현장 관련 참여자 간 정보 교환의 미흡은 공기지연, 품질하자와 같은 건설생산성 저해 요인을 유발한다. 이러한 문제점을 해결하기 위하여 건축물의 전 생애주기 동안에 필요한 데이터를 생산하고 관리하는 프로세스인 BIM(Building Information Modeling)에 대한 관심이 높아지고 있다. 그러나 국내에서 BIM의 도입은 주로 설계단계에 집중되어 있으며 시공단계에서 BIM의 활용정도는 미비한 실정이다. 따라서 본 연구는 선행연구 고찰을 통하여 골조공사에서 정보 교환의 미비로 인한 실패요인을 구분하고, BIM의 적용이 가능한 업무를 전문가 면담조사를 통하여 도출할 것이다. 그리고 BIM이 도입된 다수의 골조공사 현장의 분석을 통해 업무별 BIM 지원을 위한 참여자간 정보의 흐름을 실무 수준으로 제안하고 이에 따른 기대효과를 제시하는데 본 연구의 목적이 있다.

시공 현장의 BIM 정보 요청 사항을 통해 분석한 프로젝트 목표와 BIM 활용 간의 관계 (Analysis of the Relationship Between Project Goal and Model Use Through BIM RFI Analysis at the Construction Site)

  • 이승원;엄익철;함남혁;김재준
    • 한국BIM학회 논문집
    • /
    • 제14권1호
    • /
    • pp.22-29
    • /
    • 2024
  • BIM is a practical and economical technology used in the construction process. Despite the fact that BIM is widely used in the design and another stage before construction, it is not largely applied during the construction stage itself. However, it is important to opt for BIM during construction stage because there may occur a number of risks such as construction delay and increased construction costs. Therefore, the present paper contains the analysis of the model use, which is mainly applied to respond to the BMI RFI that represents an information requirement of construction site workers, by analysing the BMI RFI application at the construction site. In addition, there is an analysis of the way the derived model use affects the project goal aimed at the project success.

설계초기 동선 분석을 위한 BIM기반 정량 평가지표 및 평가체계에 관한 연구 (BIM-enabled Quantitative Indicators for Analyzing Building Circulation in Early Phase of Design)

  • 신재영;이진국
    • 한국실내디자인학회논문집
    • /
    • 제25권4호
    • /
    • pp.147-155
    • /
    • 2016
  • In order to ensure a certain level of the quality of design, standardized evaluation indicators are being used as an objective criterion. Even though the evaluation indicators are quantifiable, limitations such as inefficiency and inconsistency caused by manual task in the evaluation process still have been found. BIM (Building Information Modeling) technology that is commonly adopted in architectural design process provides an environment which enables us to figure out a building model to be interpreted quantitatively with the basis of the building information model. It supports quantitative, consistent, accurate and quick evaluations so as to improve quality of design even in the initial design phase. This paper aims to establish BIM-enabled quantitative indicators and an evaluation framework to analyze building circulation even in early phase of design. The indicators are composed of 4 types (relative distance, accessibility, simplicity, pedestrian friendliness) and 7 sub-types. The evaluation framework is the process to derive Parameterized Path Value (PPV) as weighting on each indicator. For demonstrating the scalability of the suggested evaluation indicators and the framework, the authors implemented an evaluation tool and a case study has been carried out by using an actual building remodel project.

교량 프로젝트의 BIM기반 구조설계를 위한 프로세스 연구 (A study on BIM based structural design process for bridge project)

  • 이헌민;이진경;유재명;신현목
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2011년도 정기 학술대회
    • /
    • pp.103-106
    • /
    • 2011
  • 현재 국내의 건설 산업은 BIM(Building Information Modeling)이라는 새로운 패러다임으로의 변화를 모색하고 있다. 이미 국내 건축업계에서는 적극적으로 BIM개념이 도입되고 있으며 주로 국가 기반시설의 건설업무를 분담하고 있는 토목업계에서는 현재 BIM개념을 도입하기 위한 준비과정에 있는 단계이다. 이 연구에서는 대표적인 토목구조물인 교량을 대상으로 BIM개념 도입의 필요성과 교량을 건설하기위한 여러단계 중에서도 그 출발점이라 할 수 있는 구조설계 단계에 있어서 BIM개념의 도입 방법과 기존의 구조설계 프로세스를 BIM기반의 구조설계 프로세스로 변화하기 위하여 필요한 작업들에 대한 분석을 수행하였으며 결과적으로 교량 프로젝트에 대하여 BIM기반의 구조설계를 위한 최적의 프로세스를 구축하기 위한 연구를 수행하였다.

  • PDF

복합용도 개발 도시재생 사업에서의 단위 공간 기반 개산견적 모델링 가이드 제안 - ○○시 ○○역 복합환승센터 사례를 중심으로 - (A Proposal of Modeling Guide of the Unit Space-based Preliminary Cost Estimation in Urban Renewal Mix-Used Development - Case Study on ○○ Transfer Station Complex -)

  • 강신엽;안재홍;김주형
    • 한국BIM학회 논문집
    • /
    • 제3권1호
    • /
    • pp.11-20
    • /
    • 2013
  • Mix-used development in urban renewal project is done to effectively utilize the limited downtown. Generally unlike a single project, It features placing a large number of different facilities(residential, commercial, business, cultural, etc.) which is each other organically linked. The purpose of this study is to suggest the method of modeling guide for 3D preliminary cost estimation considering visual and intuitive judgement of space in mix-used development Urban Renewal project. In this research, introducing SME(Standard Module and Element) breakdown structure, FID(Finish Identity) for estimating building space unit-based quantity take off was implemented. It could narrow the discrepancy of opinion between the stakeholders with more accurate cost-estimates, comparing to the traditional methods.

BIM 기반 3차원 모델 라이브러리를 통한 모듈러 교각의 정보모델링 (Information Modeling of Modular Bridge Pier using BIM Based 3D-Model Library)

  • 조제헌;김동욱;이광명;남상혁
    • 한국BIM학회 논문집
    • /
    • 제3권4호
    • /
    • pp.11-18
    • /
    • 2013
  • Modular technology has become a major issue of the construction industries to enhance their productivity. Modular bridge construction generally requires the collaboration between the contractor, designer, fabricator and constructor. Therefore, a readily accessible information model based on BIM technology should be provided for their communication during a construction project life-cycle. In this study, BIM based 3D information modeling was carried out for the modular bridge pier. First, the product breakdown structure (PBS) and level of detail (LOD) of the pier were defined. Based on them, 3D models were created by using parametric modeling method. In addition, database was constructed for the exchange of geometry and property data of 3D models. Finally, application areas of 3D information model were suggested, including the quantity estimation and the 4D simulation.

DEVELOPMENT OF MOBILE APPLICATION BASED RFID AND BIM FOR DEFECT MANAGEMENT ON CONSTRUCTION FIELD

  • Oh-Seong Kwon;Hwi-Gyoung Ko;Hee-Taek Park;Chan-Sik Park
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.7-13
    • /
    • 2013
  • Recently, defect management have been considered as one of the major issues for more large-sized and complicated in domestic construction industry. However, the defect management have not been performed systematically because of special manpower, excessive amount of documents, 2D based inspection work, unclear traditional checklists, complicated work process and difficulty in communicating construction information. Therefore, the construction field manager could not performed the quality inspection and defect management work on time as well as the reliability of recorded quality and defect factors was decreased. The primary objective of this study is develop a Construction Defect Management Application CDMA) using a mobile (smartphone). The application can be sharing a huge information and communication technology based on RFID (Radio-Frequency Identification), BIM (Building Information Modeling) which enables field mangers to efficiently gather the information of defection in construction on-site.

  • PDF

How Much Discrepancy Can Happen from BIM-based Quantity Take?

  • Kim, Seong-Ah;Chin, Sangyoon
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.263-267
    • /
    • 2015
  • Stakeholders of a construction project expect cost savings through fast and accurate cost analysis by performing BIM-based quantity take-off (BQT). However, authors have observed that there can be discrepancies in the results of BQT depending on the level of development (LOD) and modeling methods. In addition, since quantity take-off methods are different depending on the construction work items, the combination of LOD, modeling methods of BIM, features of construction work items can cause serious overestimate or underestimate in BQT results. It is necessary to identify what kind of problems can happen and how those problems can be avoided in various construction work items, since the discrepancy of quantity take-off results has great impact on not only cost analysis but also the determination of contract amount and it can cause claims, poor construction quality, cost overruns, and many others later in the construction project. Therefore, this paper focuses the identification of issues and problems of BQT at each construction work item level based on two categorizations of structural works and interior works.

  • PDF