• 제목/요약/키워드: Available capacity

검색결과 1,150건 처리시간 0.03초

교통용량 개정에 따른 고속도로 공사구간의 서비스 수준에 대한 연구 (A Study on Level-of-Service Changes of Expressway in Accordance with the Revision of Traffic Capacity at Work-Zone)

  • 류성우;박권제;한승환;조윤호
    • 한국도로학회논문집
    • /
    • 제16권3호
    • /
    • pp.109-117
    • /
    • 2014
  • PURPOSES : This study analyzes the available working time at work-zone on the Expressway in accordance to the new capacity manual. METHODS : Sensitivity analysis on variables were conducted to calculate the adjusted capacity at work-zone based on previous researches. RESULTS : The main factors which affect available working time at the work-zone were its capacity, number of lanes, terrain and lane width. Other factors have minimal effect on the available working time. Based on the analysis, a calendar of lane closures was suggested. CONCLUSIONS : A series of studies concluded that the capacity at work-zone in the new capacity manual reduced to 76-82% of the existing manual. As such, the available working time decreased. Furthermore, the factors affecting the available working time needs to be considered when making a plan to rehabilitate the distressed pavement.

Improvement of Available Battery Capacity in Electric Vehicles

  • Liu, Yow-Chyi
    • Journal of Power Electronics
    • /
    • 제13권3호
    • /
    • pp.497-506
    • /
    • 2013
  • This paper proposes a new method to improve the available battery capacity in electric vehicles by connecting lead-acid batteries with lithium-ion battery in parallel to supply power. In addition, this method combines the discharge characteristics of batteries to improve their efficiency and lower their cost for electric vehicles. A lithium-ion battery set is used to connect with N sets of lead-acid batteries in parallel. The lead-acid battery supplies the initial power. When the lead-acid battery is discharged by the load current until its output voltage drops to the cut-off voltage, the power management unit controls the lead-acid battery and changes it to discharge continuously with a small current. This discharge can be achieved by connecting the lead-acid battery to a lithium-ion battery in parallel to supply the load power or to discharge its current to another lead-acid or lithium-ion battery. Experimental results demonstrates that the available capacity can be improved by up to 30% of the rated capacity of the lead-acid batteries.

가용에너지를 이용한 대향류 열교환기의 해석 (Analysis of Counterflow Heat Exchangers with the Concept of Available Energy)

  • 김수연;정평석
    • 대한기계학회논문집
    • /
    • 제16권11호
    • /
    • pp.2189-2195
    • /
    • 1992
  • 본 연구에서는 대향류 열교환기에 대하여 출력과 효율 등을 계산하는 예를 보 이고, 동시에 최대의 출력을 얻기 위한 조건들을 수치적으로 구하였다. 또한 열교환 기의 장치비용과 열원의 생성비용을 적절히 취급하여 경제적 최적조건에 대해서도 살 펴보고자 한다. 여기서 저온유체의 가용 에너지 획득량으로서 출력은 열전달로 인한 부분만을 생각하기로 한다.

확률론적 기법을 이용한 시변 가용송전용량 결정 (Probabilistic Approach to Time Varying Available Transfer Capability Calculation)

  • 신동준;김규호;김진오
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권11호
    • /
    • pp.533-539
    • /
    • 2005
  • According to NERC definition, Available Transfer Capability (ATC) is a measure of the transfer capability remaining in the physical transmission network for the future commercial activity. To calculate Available Transfer Capability, accurate and defensible Total Transfer Capability, Capacity Benefit Margin and Transmission Reliability Margin should be calculated in advance. This paper proposes a method to quantify time varying Available Transfer Capability based on probabilistic approach. The uncertainties of power system and market are considered as complex random variables. Total Transfer Capability is determined by optimization technique such as SQP(Sequential Quadratic Programming). Transmission Reliability Margin with the desired probabilistic margin is calculated based on Probabilistic Load Flow analysis, and Capacity Benefit Margin is evaluated using LOLE of the system. Suggested Available Transfer Capability quantification method is verified using IEEE RTS with 72 bus. The proposed method shows efficiency and flexibility for the quantification of Available Transfer Capability.

정확한 고정대역폭 추정을 통한 새로운 가용대역폭 측정 기법 (A New Available Bandwidth Measurement Technique with Accurate Capacity Estimation)

  • 조성호;최한;김종권
    • 한국정보과학회논문지:정보통신
    • /
    • 제32권4호
    • /
    • pp.495-507
    • /
    • 2005
  • 인터넷에서 단대단 (end-to-end) 가용대역폭 측정은 분산된 응용 서비스, 단대단 QoS 보장 등에 유용하게 이용할 수 있다. 일반적으로 단대단 가용대역폭 측정에는 단일-홉 갭 모델에 기반한 패킷 트레인 (packet train) 전송을 통한 측정이 많이 사용되고 있다. 하지만 패킷 트레인의 출력 간격은 네트워크 망 구성과 경쟁 트래픽에 의해서 영향을 받으므로, 이 때 발생한 오차에 의해서 가용대역폭 측정에도 오차가 발생하게 된다. 본 논문에서는 기존의 방법들이 가지고 있는 연이은 (bach-to-back) 패킷 트레인을 전송하여 링크의 고정대역폭을 측정에 의한 부정확성을 해결하기 위해서 패킷 트레인의 초기 갭에 영향을 받지 않는 가용대역폭 측정 알고리즘을 제안한다 또한 빠른 측정을 위해서 패킷 트레인 전송 시 적절한 초기 간격을 예측하는 방법을 제안한다. 제안하는 방법의 성능을 검증하기 위해서 다양한 망구조에서 실험을 통해서 기존의 기법들과 비교하였다.

용량시장의 발전가능용량 전략적 입찰 분석 (Moral Hazard for the Available Capacity in Electricity Capacity Markets)

  • 김진호;박종배
    • 전기학회논문지
    • /
    • 제59권12호
    • /
    • pp.2150-2156
    • /
    • 2010
  • In this paper, we investigate how an electricity capacity market design may encourage generators to exaggerate their available capacity. In order for an analytical approach, a two player game model is introduced. We focus on two pure strategy Nash equilibria: an equilibrium at which generators offer their true capacities, and an equilibrium at which generators offer exaggerated capacities. The latter case is caused by asymmetries of information between players and so called 'moral hazard' in terms of the economics literature. This paper shows that, considering practical electricity markets, the moral hazard case is highly probable. Moreover, it is shown that, with the considered capacity market design in the real world, the better the electricity energy market performs, the higher the risk of moral hazard becomes.

KTX 개통후 서울~천안구간의 열차운행패턴 분석 (KTX Impact on Train Operation Pattern ; An Empirical Analysis)

  • 이진선;김경태
    • 한국철도학회논문집
    • /
    • 제8권6호
    • /
    • pp.507-512
    • /
    • 2005
  • Railroad transportation system has experienced major changes due to KTX introduction. Kyungbu corridor especially Seoul to Cheonan has line capacity problem and its solution has been a primary concern to researchers and policy decision makers. This study explored pattern of train operation between Seoul and Cheonan after the introduction of KTX in 2004. Both the number of trains and available seat capacity per day have increased but maximum number of trains per specific hour has not been changed much. Demand for train shows that if concentrated in a specific time, so number of trains during the peak hour should be increased. But, it is difficult ? 새 line capacity, so increasing seat capacity per train might be an option. An increase in an avaliable sear should be considered the characteristics of each train lines.

농어촌지역 미활용에너지의 부존량과 이용 가능량 분석 (A Study on Analysis of Reserves and Available Capacity of Unutilized Energy in Rural Community)

  • 박미란;류연수;김진욱;이용욱;배성돈;채갑병
    • 한국태양에너지학회 논문집
    • /
    • 제34권6호
    • /
    • pp.19-25
    • /
    • 2014
  • Alternative sources of energy take a higher interest in order to reduce the greenhouse gas under the Climate Change Convention, fossil fuel consumption, and lower social anxiety about nuclear power such as crisis involving the Fukushima plant, problem of obsolete equipment. The energy consumption of agriculture, forestry and fisheries in South Korea is 3,082,000toe by 2011, reliance on electrical energy(35%) and oil(57.2%) is very high with 92.2%. In this study, we examined reserves and available capacity of temperature difference energy for thermal discharge from plant, treated sewage, river water, dam, and agricultural reservoir in rural community. Reserves of unutilized energy are 455,735Tcal/yr in rural community, these accounts for 78% of total reserves 582,385Tcal/y. Thermal discharge from plant has the most reserves of unutilized energy in rural community, it is estimated that it has the reserves of 277,410Tcal/y. Available capacity of unutilized energy in rural community is total 134,147Tcal/y, thermal discharge from plant available for heating is the most 128,035Tcal/y, and it shows in the order of treated sewage 4,318Tcal/y, river water 1,653Tcal/y, and reservoir 141Tcal/y. Elevating temperature area of green house by 2012 is 21,208ha. The amount of energy required for heating the greenhouse a year is dbout 11,365Tcal/y with 8.5% of the total available capacity of unutilized energy.

접합부 회전능력에 기초한 중/저층 철골모멘트골조의 내진설계 (Seismic Design of Mid-to-Low Rise Steel Moment Frames Based on Available Connection Rotation Capacity)

  • 안재권;이철호
    • 한국강구조학회 논문집
    • /
    • 제19권6호
    • /
    • pp.715-723
    • /
    • 2007
  • 본 연구에서는 중/저층의 철골모멘트골조를 대상으로 합리적이고 실용적인 변위기반 내진설계절차를 제시하였다. 현행의 내진설계에서는 구조시스템 종별에 따라 경험적이고 획일적으로 규정된 반응수정계수를 토대로 설계가 수행되므로, 접합부가 보유한 회전능력의 적정성 여부를 검증하기가 어렵다. 본 논문에서는 실험적으로 입증된 철골모멘트골조 접합부의 가용 소성회전능력을 주요설계변수로 직접 사용하는 새로운 설계법을 제시하였다. 이 설계방안의 정립을 위해, 우선 지금까지 불분명한 관계로 남아있던 접합부의 가용 소성회전능력과 반응수정계수 사이의 관계를 합리적이고 정량적으로 정의하는 방안을 제시하였다. 이를 토대로 변위에 기반한 단계별 내진설계절차를 제시하고 비선형동적해석에 의해 방안의 타당성을 입증하였다.

Order Promising Rolling Planning with ATP/CTP Reallocation Mechanism

  • Chen, Juin-Han;Lin, James T.;Wu, Yi-Sheng
    • Industrial Engineering and Management Systems
    • /
    • 제7권1호
    • /
    • pp.57-65
    • /
    • 2008
  • Available-to-promise (ATP) exhibiting availability of manufacturing resources can be used to support customer order promising. Recently, one advanced function called Capable-to-promise (CTP) is provided by several modern APS (advanced planning system) that checks available capacity for placing new production orders or increasing already scheduled production orders. At the customer enquiry stage while considering the order delivery date and quantity to quote, both ATP and CTP are allocated to support order promising. In particular, current trends of mass customization and multi-side production chain derive several new constraints that should be considered when ATP/CTP allocation planning for order promising - such as customer's preference plants or material vendors, material compatibility, etc. Moreover, ATP/CTP allocation planning would be executed over a rolling time horizon. To utilize capacity and material manufacturing resource flexibly and fulfill more customer orders, ATP/CTP rolling planning should possess resource reallocation mechanism under the constraints of order quantities and delivery dates for all previous order promising. Therefore, to enhance order promising with reliability and flexibility to reallocate manufacturing resource, the ATP/CTP reallocation planning mechanism is needed in order to reallocate material and capacity resource for fulfilling all previous promised and new customer orders beneficially with considering new derived material and capacity constraints.