A Study on Level-of-Service Changes of Expressway in Accordance with the Revision of Traffic Capacity at Work-Zone

교통용량 개정에 따른 고속도로 공사구간의 서비스 수준에 대한 연구

  • 류성우 (한국도로공사 도로교통연구원 도로연구실) ;
  • 박권제 (한국도로공사 교통본부) ;
  • 한승환 (한국도로공사 도로교통연구원) ;
  • 조윤호 (중앙대학교 공과대학 사회기반시스템공학부)
  • Received : 2014.01.29
  • Accepted : 2014.05.28
  • Published : 2014.06.16

Abstract

PURPOSES : This study analyzes the available working time at work-zone on the Expressway in accordance to the new capacity manual. METHODS : Sensitivity analysis on variables were conducted to calculate the adjusted capacity at work-zone based on previous researches. RESULTS : The main factors which affect available working time at the work-zone were its capacity, number of lanes, terrain and lane width. Other factors have minimal effect on the available working time. Based on the analysis, a calendar of lane closures was suggested. CONCLUSIONS : A series of studies concluded that the capacity at work-zone in the new capacity manual reduced to 76-82% of the existing manual. As such, the available working time decreased. Furthermore, the factors affecting the available working time needs to be considered when making a plan to rehabilitate the distressed pavement.

Keywords

References

  1. Abrams, C. M. and J. J. Wang. Planning and Scheduling Work Zone Traffic Control. Report FHWA-IP-81-6, Federal Highway Administration, U.S. Department of Transportation, 1981.
  2. Dixon, K., and J. Hummer. "Capacity and Delay in Major Freeway Construction Zones", Final Report for Research Project No. 23241-94-8. Center for Transportation Engineering Studies, Department of Civil Engineering, North Carolina State University, Raleigh, March 1996.
  3. Jalil K., Praveen E., and Carlos S., "Analytical Methods for Deriving Work Zone Capacities from Field Data", American Society of Civil Engineers, 2012.
  4. Kim, T., D. J. Lovell, and J. Paracha. A New Methodology to Estimate Capacity for Freeway Work Zones. Paper No. 01-0566, submitted to the Transportation Research Board Annual Meeting, 2001.
  5. Korea Highway Corporation, "Criteria Change of Lane Closure by Modifying Road Capacity Manual (Draft)", internal Document of Traffic Management Division, 2013.
  6. Korea Highway Corporation", Development of Roadmapto Improve Pavement Life on Expressway", 2013.
  7. Maryland State Highway Administration, "Work Zones Lane Closures Anaysis Guidelines", 2006.
  8. Maze, T., and A. Kamyab, "Work Zone Simulation Model", Center for Transportation and Education, Iowa State University, Ames, Iowa, 1999.
  9. Memmott, and Dudek., "Queue and User Cost Evaluation of Work Zones (QUEWZ) in Transportation Research Record", Journal of the Transportation Research Board, No. 979, TRB, National Research Council, Washington, D.C., 1984. pp. 12-19.
  10. Ministry of Land, Transport and Maritime Affairs", Road Capacity Manual", 2013.
  11. Transportation Research Board, "Highway Capacity Manual", Washington D.C., 2000.