• 제목/요약/키워드: Auxiliary power unit

검색결과 105건 처리시간 0.034초

계통 연계 기능을 갖는 연료전지 철도차량 보조전원장치의 삼중 루프 전류 제어기 설계 (Design of Triple Loop Current Control for Auxiliary Power Unit of Fuel Cell Train having Grid Connected Inverter Function)

  • 권일섭;백승우;김학원;조관열
    • 전력전자학회논문지
    • /
    • 제25권4호
    • /
    • pp.293-302
    • /
    • 2020
  • This study proposes a triple-loop current control method for the auxiliary power unit of fuel cell trains. The auxiliary power unit of fuel cell trains has a grid-connected function when power is supplied to the utility grid. Moreover, the auxiliary power unit of trains has a 1500 V DC link voltage; thus, PWM frequency cannot be increased to a high frequency. Owing to this low PWM frequency condition, creating a triple-loop design is difficult. In this study, a triple-loop controller is developed for a capacitor voltage controller in standalone mode that operates as an auxiliary power supply for trains and for a grid current controller in grid control mode with an inner capacitor voltage controller. The voltage controller employs an inductor current controller inner loop. To overcome low PWM frequency, a design method for the bandwidth of the capacitor voltage controller considering the bandwidth of the inner inductor current controller is described. The effectiveness of the proposed method is proven using PSIM simulation.

ECU 응답특성 분석을 통한 T-50 계열 항공기 보조동력장치 자동 꺼짐 개선에 관한 연구 (A study on the improvement of Auxiliary Power Unit auto-shutdown of T-50 series aircraft based on analysis of ECU response characteristics)

  • 박성제;유인제;최수진;이동기
    • 한국산학기술학회논문지
    • /
    • 제18권3호
    • /
    • pp.640-646
    • /
    • 2017
  • T-50 계열 항공기는 비행 전 지상에서 비상동력계통 작동 점검을 위해 보조동력장치 GEN TEST를 수행하게 된다. 만일 GEN TEST 수행 중 비상동력계통에 전원이 정상적으로 공급되지 않을 경우 ECU의 응답 신호를 통해 보조동력장치가 자동으로 꺼지는 현상이 발생하게 되며, 지상에서 비상동력계통 작동 점검이 정상적으로 이루어지지 않을 경우 더 이상 비행을 할 수 없기 때문에 해당 결함은 항공기 가동률 저하에 큰 원인이 된다. ECU에서 식별된 결함코드는 인버터 결함으로 판별되었으나 인버터 교체 이후에도 동일한 결함이 지속적으로 반복되었다. 본 논문은 인버터가 특정 시간 안에 전압을 생성시키지 못 할 경우 ECU에서는 결함으로 식별되는 것이 확인되었으며, 보조/비상동력계통의, BSG, ESC, 및 ECU의 응답특성을 분석하여 개선된 방법을 제시한다. 또한, 개선된 방법에 대한 검증을 통해 비상동력계통 출력 요구시간 범위 안에 인버터 출력이 정상적으로 생성되는 것을 확인하였으며, 이를 통해 비행전 지상에서 GEN TEST 수행 시 보조동력장치 자동 꺼짐 현상을 효과적으로 예방 할 수 있음을 확인 하였다.

차세대 고속전철용 보조전원장치용 PWM 컨버터에 대한 연구 (A Study on PWM Converter of Auxiliary Power Block for Next Generation High Speed Train)

  • 정한정;차길로;이원철;원충연
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2008년도 춘계학술대회 논문집
    • /
    • pp.245-248
    • /
    • 2008
  • This paper gives a description of the mode'ling and control of a single phase PWM(Pulse Width Modulation) converter for HEMU-400X(High-speed Electric Multiple Unit - 400 km/h experiment). The converter is part of a Auxiliary power unit supplied by the 25[kV], 60[Hz] overhead line. A model of the converter in a synchronously rotating reference frame of coordinates is used to develop a new type of control. The control system has separate controllers for the active and reactive current, permitting the free choice of the power factor. This paper proposes a new control method of PWM converter for Auxiliary power unit.

  • PDF

보조동력장치 엔진 Base의 피로수명 예측 및 충격파손에 관한 연구 (A Study on Prediction of Fatigue Life and Shock Fracture for the Engine Base of Auxiliary Power Unit for Tracked Vehicle)

  • 이상범;정경택;신재호;장환영;서정세
    • 한국정밀공학회지
    • /
    • 제25권4호
    • /
    • pp.86-92
    • /
    • 2008
  • This paper is to investigate the behavior of linear static structure stress, the fatigue and experimental shock fracture far engine base in the Auxiliary Power Unit to resolve its restricted electrical power problem. The shock fracture test was experimentally made under MIL standard criteria. The numerical results by finite element method had a good agreement with those from the shock test. The design data of predicting the fracture at the initial crack and the damage behavior of structure with shock and vibration load in the battle field can be obtained from shock test. In the functional shock test, the crack at the side parts of the engine base was found at peak acceleration of 40g.

연료전지용 스크롤 팽창기-압축기 성능해석 (Performance Analysis of a Combined Scroll Expander-compressor unit for a Fuel Cell System)

  • 김성준;안종민;김현진
    • 동력기계공학회지
    • /
    • 제13권3호
    • /
    • pp.11-19
    • /
    • 2009
  • This paper introduces a conceptual design of a combined scroll expander-compressor unit for a fuel cell. Since air discharged out of the fuel cell stack has still high pressure energy, some power can be extracted from the air by directing it to pass through an expanding device. Such extracted power can be used to drive an auxiliary compressor. For this purpose, a scroll type expander coupled to a scroll type compressor was designed for a 1kW-class fuel cell. The orbiting scroll members of the expander and the compressor were made to share three of common drive shafts installed in the mid frame plate. Performance analysis for the combined expander-compressor unit showed that the installation of this unit could reduce the auxiliary power consumption in the fuel cell by about 42%.

  • PDF

8200호대 전기기관차 보조전원장치 개발품의 신뢰도 기반 수명주기비용 분석 (Life Cycle Cost Analysis of Auxiliary Power Unit Developments for 8200 Series Electric Locomotive Based on Reliability)

  • 이계승;김완일;창윤우;김재문
    • 전기학회논문지
    • /
    • 제67권11호
    • /
    • pp.1523-1529
    • /
    • 2018
  • Electric vehicles that are currently in operation are being produced domestically. Therefore, there is no great difficulty in receiving or repairing the failed parts or in the overall repair. On the other hand, most of the electric locomotives are manufactured by introducing the parts and technology of foreign vehicle manufacturers. In this paper, conducted a study about life cycle cost analysis of developed auxiliary power unit in 8200 series electric locomotive and suggested cost down method. This confirms the economic benefits of the developed products of the auxiliary power supply compared to the existing products. In addition, a sensitivity analysis of MTBF was conducted to suggest a life cycle cost down method.

독립형 소형 태양광/풍력 복합발전시스템의 출력안정화를 위한 보조 전력보상장치개발에 관한 연구 (The Auxiliary Power Compensation Unit for Stand-Alone Photovoltaic/Wind Hybrid Generation System)

  • 박세준;윤정필;강병복;윤형상;차인수;임중열
    • 한국태양에너지학회 논문집
    • /
    • 제24권3호
    • /
    • pp.47-54
    • /
    • 2004
  • Photovoltaic energy and wind energy are highly dependent on the season, time and extremely intermittent energy sources. Because of these reasons, in view of the reliability the photovoltaic and the wind power generation system have many problems(energy conversion, energy storage, load control etc.) comparing with conventional power plant. In order to solve these existing problems, hybrid generation system composed of photovoltaic(500W) and wind power system(400W) was suggested. But, hybrid generation system cannot always generate stable output due to the varying weather condition. So, the auxiliary power compensation unit that uses elastic energy of spiral spring was added to hybrid generation system for the present study. It was partly confirmed that hybrid generation system was generated a stable outputs by spiral spring was continuously provided to load.

8200대 전기기관차 보조전원장치의 특성에 관한 연구 (A Study for Characteristics of the Auxiliary Inverter in the 8200 Electric Locomotive)

  • 김진용;이상준;최종묵;강승욱
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.237-244
    • /
    • 2005
  • The Auxiliary Inverter supply the power to Loads of Electric Locomotive. The Auxiliary Inverter have three characteristics. First, The Auxiliary Inverter is VVVF(variable voltage variable frequency) inverter. And, the output voltage is AC $0^{\sim}440V$. Second, The Auxiliary Inverter is controled all operations by CCU(Center Control Unit). Last, The Auxiliary Inverter have the SIBMON program. This program easily displays most of all status of auxiliary inverter.

  • PDF

원자력발전소 변압기 연결 선로 결상 검출 시스템 (Open-Phase Condition Detecting System for Transformer Connected Power Line in Nuclear Power Plant)

  • 하체웅;이도환
    • 전기학회논문지
    • /
    • 제64권2호
    • /
    • pp.254-259
    • /
    • 2015
  • On January 30, 2012 an auxiliary component of Byron Unit 2 was tripped on bus under voltage. The cause of the event was the failure of the C-phase insulator track for the Unit 2 station auxiliary transformer(SAT) revenue metering transformer. In addition to this event, other events have occurred at other plants resulting in an open-phase condition.[1] Therefore, Nuclear Regulatory Commission(NRC) has requested that not only nuclear power plant(NPP) operating company but also its Design Certification(DC) applicant have to prepare open-phase detecting system in their operating plants and design document. In this paper, various open-phase conditions are simulated in NPP using Electromagnetic Transient Program(EMTP) and Atpdraw, and open-phase condition detecting system is proposed for Main Transformer(MT), Unit Auxiliary Transformer(UAT) and SAT connected power line in NPP.