• 제목/요약/키워드: Automatic train control

검색결과 178건 처리시간 0.033초

미지의 외란을 고려한 도시철도차량의 ATO를 위한 연구 (The Study on ATO of Urban Railway Considering Unknown Disturbance)

  • 변윤섭;한성호;김길동;이병송;한영재;백종현;박현준
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 A
    • /
    • pp.421-423
    • /
    • 1999
  • The function of the automatic train operation(ATO) system is to regulate the train ride comfort during start, acceleration and deceleration and execute operation of constant speed travelling and fixed point parking. The mathematical model for the train is presented by considering unknown disturbances which consist of start resistance, travelling resistance, slope resistance, curve resistance and so on. The speed control of ATO system is designed by considering the disturbances. The simulation is executed to verify the speed control performance and compare its performance with that of a PID-type ATO control system under the disturbances. Simulation results show that the control performance of gain scheduled control for ATO system is better than that of the conventional PID controller.

  • PDF

열차방호장치(ATP) 차상설비 시험절차에 대한 고찰 (A review of ATP Onboard System's Test procedure)

  • 장석각;김진환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.1163-1168
    • /
    • 2008
  • Automatic Train Protection(ATP) System is developed by ETCS(European Train Control System) CONSORTIUM for unify Europe railway system. ATP system is composed of Eurobalise and EuroATC. Nowadays, Korea construct ATP system in conventional line and new electrical locomotives also install ATP system. It is important to verify quality which form checklist during Factory Acceptance Test at beyond the seas. In this paper, review the process, test item, norm and checklist for the Balise Transmission Module, Compact Antenna Unit, Vehicle Control Unit and Communication Controller at the Plymouth Bombardier and Vasteras enics factory.

  • PDF

ATP시스템의 안전제동거리에 대한 연구 (A Study on the Safety Braking Distance in ATP System)

  • 김민규;김민석;김종수;윤유범;이종우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.132-139
    • /
    • 2011
  • ATP(Automatic Train Protection) system in railroad signalling system is on-board signalling system which is controlled by train control information such as location and speed of trains. Safety is ensured by transmitting the train control information between on-board and wayside device in the ATP system. When an engineer disregards the speed limit on a tachometer, the train is automatically stopped by the on-board device. Recently, the studies of increasing speed of the train have been developed. Eurobalise in ERTMS/ETCS system is used in case that speed of trains is up to 500[km/h]. A study of safety braking distance is needed by increasing the speed of train in the ATP system. Train data and track data are required to calculate the safety braking distance. The train data includes formations of trains, length of trains, service brake and emergency brake etc. Also, the track data includes slope of track, curve of track, length of track, speed limit etc. In this paper, the speed profile is computed by analyzing the train and track data in the ATP system. It is demonstrated by applying to subway line 2 in Seoulmetro through the on-site test.

  • PDF

차상 ATO/TWC 안테나 설계 및 제작에 관한 연구 (A Study on On-board ATO/TWC Antenna Design and Manufacture)

  • 유성호;박종천;강리택;조영완;차기주
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.903-908
    • /
    • 2005
  • Existing ATC/ATO/TWC system has a ATC(Automatic Train Control) antenna for receiving the speed code, a ATO(Automatic Train Operation) antenna for obtaining the exact distance to go to platform and TWC(Train and Wayside Communication) antenna for communication between on-board and wayside system. This paper proposes the ATO/TWC antenna with tele-powering module, telegram transmitter/receiver module. This antenna communicates with a passive type tag(wayside Precision Stop Marker) for the information of distance from the stop position and a active type tag for the door command and status in the platform.

  • PDF

고정폐색구간에서 복합열차운행에 대한 신호제어기술 고찰 (The study on the signal controls for the mixed train operation on the fixed block)

  • 이영훈;김종기;류상환;이영형
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 추계학술대회 논문집
    • /
    • pp.350-357
    • /
    • 2001
  • 본 논문은 고정폐색구간에서 차량운전 특성과 속도패턴이 다양한 다종의 열차들이 동일선로에서 복합되어 고밀도 운행을 위한 방법으로, 신호현시에 대한 제반정보를 차상으로 전송 받아 기관실 신호표시반에 신호를 현시 하는 차상신호방식(Cab Signalling System)중에서, 선행열차의 위치, 선로조건 등 지상의 상태정보를 후속열차가 수신하여 열차 자신의 제동특성 등 차량정보와 비교 분석하여 제동거리를 계산하는 distance to go 방식으로 열차운전속도를 제어하는 ATP (Automatic Train Protection) 시스템을 제안하였다. 폐색구간별 고정된 신호속도단계가 부여되는 ATC(Automatic Train Control) 시스템에서는 운행패턴이 같은 단일차종의 열차만 운행하는 구간에서는 일정속도에 의한 폐색구간 분할로 구간내 distance to go 신호체계가 이루어지지만, 차종과 속도패턴이 서로 상이한 복합열차들의 운행구간에서는 안전거리 확보를 위하여 저속열차의 제동거리를 기준으로 폐색구간 분할 및 속도결정이 이루어지므로 ATP 방식보다 운행효율이 다소 떨어짐을 알 수 있었다. 이를 차량특성과 속도패턴이 다른 3개의 열차를 모델로 하여 열차별 감속도에 의한 제동특성을 ATC와 ATP 신호제어체계에 접목시켜 시뮬레이션을 하였다.

  • PDF

Study on Fault Diagnosis Method of Train Communication Network applied to the prototype Korean High Speed Train

  • Cho, Chang-Hee;Park, Min-Kook;Kwon, Soon-Man;Kim, Yong-Ju;Kim, Sung-Shin
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2003년도 ICCAS
    • /
    • pp.2169-2173
    • /
    • 2003
  • The development project of Korean High Speed Train (KHST) was started in 1996. As a national research project, the KHST project aims for a development of the next generation prototype train that has a maximum speed of 350 km/h. The development process of prototype KHST including 7 vehicles was completed last year and currently the prototype train is on its way of test running over the test track with gradually increased speed. The prototype KHST uses the real time network called TCN (Train Communication Network) for exchanging information between various onboard control equipments. After 10 years of development and modification period, TCN was confirmed as international standard (IEC61375-1) for the electrical railway equipment train bus. In the prototype KHST, all major control devices are connected by TCN and exchange their information. Such devices include SCU (Supervisory Control Unit), ATC (Automatic Train Control), TCU (Traction Control Unit), and so forth. For each device that sends and receives data using TCN, a device has to find out whether TCN is in normal or failure state before its data exchange. And also a device must have a proper method of data validation that was received in a normal TCN state. This is a one of the major important factors for devices using network. Some misleading information can lead the entire system to a catastrophic condition. This paper briefly explains how TCN was implemented in the prototype KHST train, and also shows what kind of the fault diagnosis method was adopted for a fail safe operation of TCN system

  • PDF

도시철도 운전형태별 시스템 구비요건 분석 연구 (Analysis of the system requirements by EMU operating types)

  • 홍용기;정종덕;편장식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.536-543
    • /
    • 2008
  • When the electric motor car was first introduced, an engineer, responsible for the work related to operation and a conductor for the announcement and management of entrances and the other services like as monitoring the passengers in the platforms used to take together the train for passengers' safe. As new technologies developed and the urban transit system had the automatic driving facilities, automatic door switch and broadcasting systems, to solve the financial problems, most subway systems introduced the one-man operation system. To curtail the operating expense through automatic control and operation for the economical efficiency, the crewless driving system was introduced abroad around 1970 on the light weight train and Japan started the crewless driving system in 2005, Germany started it in June 2008. We examine system requirements of the system and methods to construct safe systems that would be introduced, suitable for one-man operation system or crewless driving system through the surveys and analysis of driving state and the systems.

  • PDF

ATP 차상장치의 틸팅열차 설치 및 설치시험 분석 (Analysis of Tilting Train Installation and Installation Test for ATP(Automatic Train Protection) On-board Equipment)

  • 백종현
    • 한국산학기술학회논문지
    • /
    • 제11권7호
    • /
    • pp.2534-2540
    • /
    • 2010
  • 본 논문에서는 틸팅열차의 안전성 확보 및 운행효율 향상을 위해 “한국형 틸팅열차 신뢰성 평가 및 운용기술개발” 연구과제의 한 분야로 추진된 ATP 차상장치의 설치 및 시운전시험에 대한 내용 및 결과를 제시하고 있다. 한국철도기술연구원에서는 기존선의 속도 향상과 KTX 비수혜지역의 여객 서비스 향상을 위해 틸팅열차를 개발하였으며 개발된 틸팅열차의 신뢰성 평가를 위해 기존에 사용되고 있는 ATS 장치에 의한 10km 주행 시운전 시험을 진행하였다. 국토해양부에서는 KTX가 운행되지 않는 지역인 중앙선 및 충북선을 비롯한 7개 기존 노선을 200km/h 이상으로 고속화하기로 하였으며, 이에 따라 열차제어시스템은 기존의 ATS 장치에서 ATP 장치로 개량하여야 한다. 따라서 틸팅열차에도 ATP 차상장치를 설치하여 운행 적합성을 확인하여야 하기 때문에 한국철도공사의 경부선 및 호남선 ATP 구축사업에 사용된 것과 동일한 ATP 차상장치를 틸팅열차에 설치하여 시험하였다.

ATO 차량의 제동장치 유지보수 시스템 개발을 통한 정위치 정차율 향상 방안 연구 (Study for improve the tracing stopping ratio of ATO train through Brake maintenance System)

  • 이경복;이희선;김진수;마상견;김동수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.2249-2257
    • /
    • 2010
  • This paper describes the method of how to improve the probability of the tracing stopping ratio which is the most important factor in Automatic Train Operation (ATO). Aspects of improving the performance of automatic driving, the followings are investigated and studied : Brake system maintanence method of vehicle, the need to improve braking system, test method of blending brakes, how to minimize the delay of commands for real-time control. In this study, we applied this method to prove the effectiveness in DAEJEON LINE1.

  • PDF

IEC 62279 요구사항 충족을 위한 열차제어시스템의 소프트웨어 품질보증 활동에 관한 연구 (Software Quality Assurance Activities of Automatic Train Control System to meet Requirements of the IEC 62279 Standard)

  • 심규돈;이종우;박채영;김재남;서영준
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1118-1125
    • /
    • 2010
  • This paper presents the methods to acquire the Safety Certificate from Independent Safety Assessment based on the IEC standard62279 which is commonly applied to railway system for Automatic Train Control(ATC) system in accordance with Urban Maglev project. This also shows approach methods and relative activities for project life-cycle to accomplish and ensure the system requirements of ATC system, RAMS and S/W quality activities. Furthermore, the key tasks conducted with ISA are noted in detail. These kind of activities for software quality of ATC system to obtain Safety Certificate could be a CASE model to improve the quality of domestic railway system and products, and also contribute to the growth of railway business and toward the achievement of overseas' railway signaling markets.

  • PDF