• Title/Summary/Keyword: Automated Construction

Search Result 499, Processing Time 0.026 seconds

A Conceptual Design and Feasibility Analyses of an Automated Pothole Patching Machine (도로면 포트홀 유지보수 자동화 장비의 개념디자인 및 경제적 타당성 분석에 관한 연구)

  • Yeom, Dong Jun;Yoo, Hyun Seok;Kim, Young Suk
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.4
    • /
    • pp.65-74
    • /
    • 2018
  • The primary objective of this study is to develop a conceptual design of automated pothole patching machine that improves the conventional work in safety, quality, and productivity. For this, the following research works are conducted sequentially; 1)literature review, 2)selection of element technology for conceptual design, 3)deduction of work process and conceptual design, 4)life cycle cost analysis of the conceptual design. As a result, X-Y table telescopic manipulator, pothole patching end effector, realtime pothole recognizer, 3D pothole volume profiler, automated pothole patching machine controller are selected as core technologies. Furthermore, a conceptual design and working process of an automated pothole patching machine are developed based on the core technologies. According to the life cycle cost analysis result, the cost of the automated method was 38.3% less than that of the conventional method, and the economic efficiency was also superior(ROR 77.1%, Break-even Point 23.8month). It is expected that the application range and impact on the construction industry will be enormous due to the increasing trend of road maintenance market.

Crafting an Automated Algorithm for Estimating the Quantity of Beam Rebar

  • Widjaja, Daniel Darma;Kim, Do-Yeong;Kim, Sunkuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.4
    • /
    • pp.485-496
    • /
    • 2023
  • Precise construction cost estimation is paramount to determining the total construction expense of a project prior to the initiation of the construction phase. Despite this, manual quantification and cost estimation methods, which continue to be widely used, may result in imprecise estimation and subsequent financial loss. Given the fast-paced and efficiency-demanding nature of the construction industry, trustworthy quantity and cost estimation is essential. To mitigate these obstacles, this research is focused on establishing an automated quantity estimation algorithm, particularly designed for the main rebar of beams which are recognized for their complicated reinforcement configurations. The exact quantity derived from the proposed algorithm is compared to the manually approximated quantity, reflecting a variance of 10.27%. As a result, significant errors and impending financial loss can be averted. The implementation of the findings from this research holds the potential to significantly assist construction firms in quickly and accurately estimating rebar quantities while adhering strictly to applicable specifications and regulatory requirements.

A Study of Object Recognition for the Efficient Management of Construction Equipment

  • Hyeok-Jun Ryu;Suk-Won Lee;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.587-591
    • /
    • 2013
  • Measuring the process of construction operations for productivity improvement remains a difficult task for most construction companies due to the manual effort required in most activity measurement methods. There are many ways to measuring the process. But past measurement methods was inefficient. Because they needed a lot of manpower and time. So, this article focus on the vision-based object recognition and tracking methods for automated construction. These methods have the advantage of efficient that human intervention was reduced. Therefore, this article is analyzed the performance of vision-based methods in the construction sites and is expected to contribute to selection of vision-based methods.

  • PDF

Application of mathematical metamodeling for an automated simulation of the Dong nationality drum tower architectural heritage

  • Deng, Yi;Guo, Shi Han;Cai, Ling
    • Computers and Concrete
    • /
    • v.28 no.6
    • /
    • pp.605-619
    • /
    • 2021
  • Building Information Modeling (BIM) models are a powerful tool for preserving and using architectural history. Manually creating information models for such a significant number and variety of architectural monuments as Dong drum towers is challenging. The building logic based on "actual measurement construction" was investigated using the metamodel idea, and a metamodel-based automated modeling approach for the wood framework of Dong drum towers was presented utilizing programmable algorithms. Metamodels of fundamental frame kinds were also constructed. Case studies were used to verify the automated modeling's correctness, completeness, and efficiency using metamodel. The results suggest that, compared to manual modeling, automated modeling using metamodel may enhance the model's integrity and correctness by 5-10% while also reducing time efficiency by 10-20%. Metamodel and construction logic offer a novel way to investigate data-driven autonomous information-based modeling.

A Productivity Analysis of Self-supported Steel Joint using Automated Wire Control Machine (전동윈치를 적용한 자립형 철골 접합부의 생산성 분석)

  • Kim, Chang-Won;Cho, Nam-Seok;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.325-326
    • /
    • 2012
  • Because steel frame has own characteristics as easy to work and structural safety, it is being increased application by the trend of construction industry has been more higher and larger in today. However, steel frame works have potential problem, so fundamental solution is needed for preventing serious accidents. Recently, self-supported steel joint for enhancing safety is developed in Korea, but this system has some limitations as convenience of work, retainment of consistent productivity. For complementing this limitations, we developed the new system named Automated wire control machine. This study is performed productivity of steel frame work by new system. The basis data for analysing productivity is collected from field test.

  • PDF

Analysis for the Applicability of Automated Quantity Take-off Technique Using BIM Authoring Tools on Road Construction (BIM 저작도구를 활용한 도로공사 수량산출 자동화 활용성 분석)

  • Moon, Jin-Seok;Sun, Ji-Won;Choi, Won-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.10
    • /
    • pp.5184-5191
    • /
    • 2013
  • The automated quantity take off technique using BIM authoring tools has been recently issued, and the studies of this method for the accuracy, efficiency, and the unit computing for the simple volume, area and number have been developed. Meanwhile the main concerns such as the details for the level of modelling, and the costs and time for the calculating BOQ item are still required to study. In this paper, the earth works, drainage works, pavement works, and facility works using BIM authoring tools are designed in 3D, and the applicability of automated quantity take off technique using BIM authoring tools is discussed, respectively. As a result, automated quantity take off are limited in the earth works, drainage works, pavement works, and facility works. But Most items of BOQ can be supported in Re-bar model.

The Development of Automated Building Equipment Design Process System Using 3D CAD (3차원 CAD정보를 활용한 건축설비설계 프로세스 시스템 개발방향)

  • Lee, Dong-Hyun;Jung, Woo-Shin;Kim, Young-Don;Song, Kyoo-Dong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.269-274
    • /
    • 2008
  • It is attempted that the standardization of the construction, globalization of the engineering construction and an information oriented construction spread by setting a goal of the advanced construction industry and productivity increase of human resources within the country. Hence, it has been brought in the information oriented construction of BIM based technology for the field of construction and equipment of Korea. The current study that examines the possibility of application of 3D ; that is BIM based programs of building equipment, and make better the problems of 3D building equipment system through the Pilot Test, indicates the way of growth development about the construction of building equipment process system.

  • PDF

Automated Generation of a Construction Schedule Based on the Work Method Template for 4D Simulation (4D 시뮬레이션을 위한 공법 템플릿 기반의 건설공정 자동 생성)

  • Song, Sung-Yol;Yang, Jeong-Sam;Myung, Tae-Sik
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.216-228
    • /
    • 2012
  • BIM-based 4D simulation makes people easily understand complex construction process using 3D graphics model and helps them review and identify the construction schedule in each phase of the construction process. Moreover, 4D simulation can be used as reference data to determine the validity of the process in the design phase and will be utilized as a measure for checking the construction process. Therefore 4D simulation of construction improves efficiency of project management. However, current commercial applications available for 4D simulation do not provide sufficient functions for connection of 3D models and process information. In this paper, we propose an automated generation method through the definition of the process based on a work method template and developed the template based schedule generation system (TSGS).

AUTOMATED INTEGRATION OF CONSTRUCTION IMAGES IN MODEL BASED SYSTEMS

  • Ioannis K. Brilakis;Lucio Soibelman
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.503-508
    • /
    • 2005
  • In the modern, distributed and dynamic construction environment it is important to exchange information from different sources and in different data formats in order to improve the processes supported by these systems. Previous research has demonstrated that (i) a significant percentage of construction data is stored in semi-structured or unstructured data formats (ii) locating and identifying such data that are needed for the important decision making processes is a very hard and time-consuming task. In this paper, an automated methodology for the classification and retrieval of construction images in AEC/FM model based systems will be presented. Specifically, a combination of techniques from the areas of image processing, computer vision, and content-based image retrieval have been deployed to develop a method that can retrieve related construction site image data from components of a project model.

  • PDF

A BIM-based Automated Framework for Formwork Planning on Construction Sites

  • Xu, Maozeng;Mei, Zhongya;Tan, Yi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.52-61
    • /
    • 2017
  • Considering its significant impact on the cost and schedule of construction projects, formwork as one part of temporary facility categories in construction should be arranged precisely. Current practice in the formwork planning is often conducted manually and repetitively, causing low efficiency and time waste. This study proposes an automated framework to generate more accurate and detailed formwork plans by utilizing information from building information modeling (BIM) considering the adequate geometric and semantic information provided by the BIM model. The dimensions and quantities information of elements in a building can be extracted automatically. Then, a rule is prepared for calculating the required forms erected around elements based on the contact areas. Finally, an algorithm of integrating first fit decreasing (FFD) with coordinated bottom left (CBL) is applied to automatically generate the formwork plan. The BIM-based automated planning framework is demonstrated by an illustrative example. The results show that the proposed framework can generate the formwork plan accurately and automatically, and significantly improve the efficiency in the formwork plan and reuse.

  • PDF