• Title/Summary/Keyword: Automated Building Construction System

Search Result 93, Processing Time 0.028 seconds

The Study on the Suggestion of Development Guideline for Automated Building Construction System (건물 자동화 시공 시스템 개발 방향에 관한 연구)

  • Lee, Ung-Kyun;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.3
    • /
    • pp.67-73
    • /
    • 2007
  • Increasing wages and decreasing skilled labors are problems awaiting solution. The development of automatic technologies contributes to accelerating the one of construction automation. Thus, this study is to suggest the way to develop the automated building construction system base on one performed in Japan in order to solve urgent problems of construction industry in Korea. Therefore interviews and questionnaires were performed based on experts who work for the automated building construction system field and analyzed through analytic hierarchy process. In doing so, it was the most important factor to develop a branch of automatic, mechanical or machine technologies for the automated building construction system. Especially the study indicated the importance of the technologies to substitute skilled labors such as a robot. This research could contribute to developing the automated building construction which is very unique and suitable for construction industry in Korea.

Comparative Performance Analysis of Robot-based Automated Construction System Using a Real Scale Test Project

  • Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.3
    • /
    • pp.339-349
    • /
    • 2015
  • A large-scale research project to develop a robot-based automated building construction system for steel structures was successfully conducted in South Korea. This paper discusses the results of the real-scale test and the key lessons gained from the testing process. The system was assessed in terms of system productivity, construction cost, quality control, and safety improvements. While the productivity of the automated system showed an improvement of about 9.5%, the construction cost was about six times higher than that of the conventional method. The field test also indicated that the automated system requires more on-site quality control measures. However, because the system can eliminate the causes of various safety accidents, safety levels might be expected to be improved significantly. It is expected that this paper will provide knowledge and insight for developing new systems, and the results of the real-scale test might be useful for other researchers and similar research projects in the future.

The Development of Automated Building Equipment Design System Using 3D CAD Building Information (3차원 CAD정보를 활용한 건축설비 자동화시스템 구축에 관한 기초연구)

  • Song, Kyoo-Dong;Song, Seung-Yeong;Jeung, Woo-Shin
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.357-360
    • /
    • 2007
  • In the area of domestic construction industry, recently, standardization of construction. globalization of constructional and a building information arc required to advance increase productivity, shorten the term of works and reduce the cost of construction. The objective of this is to offer basic data of process new thesis and development for automated building equipment design system based on 3D CAD building information. This study contribute the development of automated Building equipment design system based on 3D which helps to conduct the equipment design handily and quickly.

  • PDF

Performance assessment model for robot-based automated construction systems

  • Lee, Ung-Kyun;Yoo, Wi Sung;An, Sung-Hoon;Doh, Nakju;Cho, Hunhee;Jun, Changhyun;Kim, Taehoon;Lee, Young Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.416-423
    • /
    • 2013
  • An adjusted assessment model based on benefit-cost analysis (BCA) is proposed for evaluating the economic efficiency of automated construction technologies. In contrast to conventional BCA, the model does not compare monetary values, but the differences in benefits and costs between traditional and automated construction methods. To verify the usefulness of the model, it was applied to a real-scale building construction project that used a fully automated building construction system, and the face validity of the model was confirmed. The results indicate that the model can support decision makers in identifying valuable benefit factors and in assessing the cost effectiveness of the system.

Development of Automated Welding System for Construction: Focused on Robotic Arm Operation for Varying Weave Patterns

  • Doyun Lee;Guang-Yu Nie;Aman Ahmed;Kevin Han
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.115-124
    • /
    • 2022
  • Welding is a significant part of the construction industry. Since most high-rise building construction structures rely on a robust metal frame welded together, welding defect can damage welded structures and is critical to safety and quality. Despite its importance and heavy usage in construction, the labor shortage of welders has been a continuous challenge to the construction industry. To deal with the labor shortage, the ultimate goal of this study is to design and develop an automated robotic welding system composed of a welding machine, unmanned ground vehicle (UGV), robotic arm, and visual sensors. This paper proposes and focuses on automated weaving using the robotic arm. For automated welding operation, a microcontroller is used to control the switch and is added to a welding torch by physically modifying the hardware. Varying weave patterns are mathematically programmed. The automated weaving is tested using a brush pen and a ballpoint pen to clearly see the patterns and detect any changes in vertical forces by the arm during weaving. The results show that the weave patterns have sufficiently high consistency and precision to be used in the actual welding. Lastly, actual welding was performed, and the results are presented.

The Development of Automated Building Equipment Design Process System Using 3D CAD (3차원 CAD정보를 활용한 건축설비설계 프로세스 시스템 개발방향)

  • Lee, Dong-Hyun;Jung, Woo-Shin;Kim, Young-Don;Song, Kyoo-Dong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.269-274
    • /
    • 2008
  • It is attempted that the standardization of the construction, globalization of the engineering construction and an information oriented construction spread by setting a goal of the advanced construction industry and productivity increase of human resources within the country. Hence, it has been brought in the information oriented construction of BIM based technology for the field of construction and equipment of Korea. The current study that examines the possibility of application of 3D ; that is BIM based programs of building equipment, and make better the problems of 3D building equipment system through the Pilot Test, indicates the way of growth development about the construction of building equipment process system.

  • PDF

Benefit/Cost Analysis of Robot-based Automated Construction System (로봇 크레인 기반 시공자동화공법의 편익/비용 분석)

  • Kim, Tae-Hoon;Lee, Ung-Kyun;Yoo, Wi-Sung;An, Sung-Hoon;Doh, Nak-ju;Cho, Hun-hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.133-134
    • /
    • 2011
  • While researches related with construction automation have dramatically increased, a Robot-based Automatic Construction system (RCA system) has developed for high-rise buildings in Korea. At the aspect that wide adoption of the RCA system is dependent on economic efficiency comparing with a conventional method, feasibility study on the RCA system should be implemented. However, due to practical limitations, the RCA system has tested to a seven story building. Based on the test results, this study implements a cost/benefits analysis to a simulated forty story building in order to derive more reliable data on the RCA system's practicability.

  • PDF

Development of Pre-Specification for BIM-based Automated Building Code Checking (BIM 기반 건축법규 자동검토를 위한 사전정의서 개발)

  • Kim, Inhan;Jang, Jaemoon;Choi, Jungsik
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.1
    • /
    • pp.31-41
    • /
    • 2016
  • Building Information Modeling (BIM) has been adopted in variety domain of construction industry. In this circumstances, interest of BIM model quality has been increased. In many countries, automated building code checking system by Industry Foundation Classes (IFC) has been developed and studied to use web based building permission systems. IFC is international standard of BIM format. However, the data structure of IFC does not include all of objects and properties about national building codes. In this paper, we developed the information specification between IFC data structure and national building code to increase interoperability. First, we drew the criteria from literature review to analyze the building code. And then, we analyzed building code and sorted objects and properties for automated building code checking. After that we made mapping table between the sorted data and IFC specification. Using the mapping table, we developed pre-specification about building codes information that does not exist in IFC specification. And the defined information can be used to develop the BIM modeling guide and national building permission system. The pre-specification support increasing the interoperability between user and automated building code checking system. Increasing thee interoperability makes improvement accuracy and reliability about result of automated building code checking.

Development of High-level Method for Representing Explicit Verb Phrases of Building Code Sentences for the Automated Building Permit System of Korea (서술부의 함수체계화를 통한 인허가관련 건축법규의 자동검토 응용방안)

  • Park, Seokyung;Lee, Jin-Kook;Kim, Inhan
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.3
    • /
    • pp.313-324
    • /
    • 2016
  • As building information modeling (BIM) is expanding its influence in various fields of architecture, engineering, construction and facility management (AEC-FM) industry, BIM-based automated code compliance checking has become possible prospects. For the automated code compliance checking, requirements in building code need to be processed into explicit representation that enables automated reasoning. This paper aims to develop high-level methods that translate verb phrases into explicit representation. The high-level methods represent conditions, properties, and related actions of the building objects and clarify the core content of the constraints. The authors analyze building permit requirements in Korea Building Code and establish a standardized process of deriving the high-level methods. As a result, 60 kinds of the high-level methods were derived. In addition, method classification, analysis, and application are introduced. This study will contribute to the representation of explicit building code sentences and establishment of the automated building permit system of Korea.

Automated Life-Cycle Management System Based on SCM for Super High-rise Buildings Construction (SCM기반 Automated Life-Cycle Management System 구축방안 - 초고층 빌딩 커튼월을 중심으로 -)

  • Yoon Jeong-Hwan;Kim Yea-Sang;Chin Sang-Yoon;Kim Chang-Duk;Choi Yoon-Ki;Chun Jae-Youl;Lim Hyung-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.430-433
    • /
    • 2003
  • Cost, schedule, quality are the essential parts of success of every construction project. It is especially true in high-rise building construction. Among the construction components in high-rise building construction, curtain walls are very important elements for the project success because they take large portion of cost and schedule. However, curtain wall construction process are very complicated, where many entities including designers, suppliers, contractors and even maintenance contractors are involved. Therefore, control and management of their relationships and production process are critical. It is suggested that this can be solved by the concept of Supply Chain Management which is supported by the automated information technology with Radio Frequency Identification. Such concept is defined as 'Automated Life-Cycle Management System Based On SCM' and this study suggests rode map to establish the system.

  • PDF