• Title/Summary/Keyword: Association Method

Search Result 20,256, Processing Time 0.042 seconds

New Technical Method in Incheon Bridge (인천대교와 신기술들)

  • Yoon, Man-Keun
    • Journal of the Korean Professional Engineers Association
    • /
    • v.39 no.6 s.189
    • /
    • pp.42-48
    • /
    • 2006
  • This is briefly to introduce about design and construction method newly adopted in Incheon bridge construction site. The Incheon Bridge Project are divided into 3 parts, that is Cable Stayed Bridge. Viaduct Bridge and Approach Bridge. In this paper, we will describe overview and construction sequence of each kind part.

  • PDF