• 제목/요약/키워드: Assessment development

검색결과 6,801건 처리시간 0.035초

Review of the marine environmental impact assessment reports regarding offshore wind farm

  • Oh, Hyun-Taik;Chung, Younjin;Jeon, Gaeun;Shim, Jeongmin
    • Fisheries and Aquatic Sciences
    • /
    • 제24권11호
    • /
    • pp.341-350
    • /
    • 2021
  • The energy production of offshore wind farms plays an important role in expanding renewable energy. However, the development of offshore wind farms faces many challenges due to its incompatibility with marine environments and its social acceptability among the local community. In this study, we reviewed the marine environmental impact assessment status of offshore wind farm development projects for 2012-2019 in South Korea. A total of nine projects were selected for this study, all of which experienced considerable conflict with local fisheries resources. To appropriately respond to the underlying challenges faced by offshore wind farm development and in order to better support decision-making for future impact assessment, our findings identified: i) a need for adequate preliminary investigation and technical examination of fisheries resources; ii) a need to assess and estimate the impact of underwater noise, vibration, and electromagnetic waves on fisheries resources during wind farm construction and operation; and iii) a need for a bottom-up approach that allows for communication with local stakeholders and policy-makers to guarantee the local acceptability of the development.

성찰저널을 활용한 프로그램 학습성과 평가체계 개발 (A Study on the Development of Program Outcomes Assessment System using Reflection Journal)

  • 이영태;임철일
    • 공학교육연구
    • /
    • 제16권3호
    • /
    • pp.42-50
    • /
    • 2013
  • The main purpose of this study was to develop a program outcomes assessment tool using reflection journal. Reflection journal has recently come to gain more attention from school as an alternative assessment tool. Although numerous studies reconfirmed the educational importance and value of reflection journal as an assessment tool, research on the assessment tool of the engineering accreditation, based on education view is scarce. After literature reviews about the case studies on the program outcomes assessment, this study, to analyse the current assessment tools, and then, examined the educational implications of reflection journal as a program outcomes assessment tool. This study suggested the assessment tool using reflection journal for PO6 (teamwork) and PO11 (engineering ethics), one of the most important assessment items in engineering accreditation. In this study, we used the performance criteria, assessment criteria, rubric, and closed the loop to measure the teamwork and engineering ethics. The result of this study is significant in terms of guiding the future evaluation system development for program outcomes.

전력산업의 환경영향평가 분석을 통한 제도개선 (Analysis of EIA for Electric power plant construction)

  • 차동원;김용화;정기욱;김창현
    • 환경영향평가
    • /
    • 제7권2호
    • /
    • pp.145-152
    • /
    • 1998
  • The first Environmental Impact Assessment(EIA) in Korea was carried out for Electric Power resource development. This study includes of the method and procedure of pre-Environmental investigation and EIA for Electric Power resource development. Through the analysis of these we make some conclusions for the improvemental and effective method of impact prediction, the environmentally sound and sustainable development of the earth(ESSD) and the collection of public opinions.

  • PDF

통신탑재체 개발 위험관리 Case Study (Case Study of Risk Management on Communication Payload System Development)

  • 정철오;은종원
    • 항공우주시스템공학회지
    • /
    • 제5권2호
    • /
    • pp.8-11
    • /
    • 2011
  • The scope of this paper is to show a risk management plan including how to perform risk assessment and to make a mitigation plan aspects of the communication payload system development. According to system engineering management guide of DoD of USA and risk management plan of satellite communication system, risk assessment and mitigation plan of communication payload system were performed. In this paper, it is indicated the process of risk management and risk assessment procedures as well as mathematical model for risk assessment of DoD guide. It is shown how risk assessment and mitigation plan have implemented in communication payload system development through case study.

바다골재채취에 따른 환경영향 스코핑과 제도개선 (Scoping for Environmental Impact and System Improvement of Marine Sand Mining in Korea)

  • 이대인;엄기혁;전경암;김귀영
    • 환경영향평가
    • /
    • 제19권3호
    • /
    • pp.335-345
    • /
    • 2010
  • This paper assessed environmental impacts of marine sand mining on coastal areas and Exclusive Economic Zones (EEZs) of Korea, and diagnosed problems of the related assessment statements for suggesting key assessment items (scoping) and system improvement. To mitigate conflicts and environmental impacts caused by large-scale, concentrated sand mining, we suggest it is critical to promote sustainable and eco-friendly utilization of marine resources while listening opinions from various stakeholders and analyzing alternative plans. Especially, it should be mandatory as a scoping item to provide verifiable data on the amount of sand, potential and accumulative impacts by mining, and key assessment items (e.g. erosion and sedimentation by submarine topography, benthic change, spreading of suspended solids, water pollution, grain-size change, and impact on fisheries resources). We also suggest that postassessment and monitoring should be improved to enable tracking of environmental impacts caused by sand mining through seasonal monitoring together with intermittent short-term surveys. In addition, effective measures to mitigate the impacts is also essential. As repeated sand mining at large-scale can damage marine ecosystems by long-term accumulated impacts, we suggest that assessment systems and regulatory policies should be developed and established, especially for ensuring reliability of assessment and review on selected major sandmining projects.

우리나라 환경영향평가제도의 현주소와 발전방향에 관한 연구 (The Status Quo and Direction of Development of Environmental Impact Assessment System in Korea)

  • 최준규
    • 환경영향평가
    • /
    • 제9권2호
    • /
    • pp.155-161
    • /
    • 2000
  • Environmental impact assessment(EIA), the only preventive system to manage development projects destroying the nature and ecosystem systematically, has been accomplished since the late 1970. EIA connotes intrinsic limits predicting uncertain future with the aid of present data. Furthermore, EIA has been used as not decision-making tools but regulatory means. Therefore, EIA has been criticized severely. In order to present direction of development of EIA, we analyzed problems of management of EIA, and concluded measures as follows are needed. 1. Control of investigation of environmental impact statements 2. Development of evaluating methods and publication 3. Fostering of institute for research and investigation of EIA 4. Construction of harmony of environment and development 5. Upgrade of state of proxy executing EIA.

  • PDF

토지적성평가(평가체계II)의 검수방안에 대한 연구 (The Overview Standard of Land Suitability Assesment (Assesment System II))

  • 정영동;조규장
    • 대한공간정보학회지
    • /
    • 제12권3호
    • /
    • pp.33-41
    • /
    • 2004
  • 국토의 난개발의 방지를 위해서 도입된 토지적성평가제도는 평가체계 I, II로 구분되어 있다. 평가체계II는 민간 및 지자체 차원에서 발생하는 일정 기준의 개발사업에 대한 토지이용규제의 성격을 가지고 있다. 이 때문에 민간차원의 개발사업에서는 토지에 대한 재산권의 제한을 가할 수 있어, 평가결과에 대한 조작의 유혹이 존재할 수 있다. 이에 따라 적정한 검수 방안이 마련되지 못하면, 난개발방지 및 효율적인 국토이용이라고 하는 제도도입을 위한 목적을 달성할 수 없다. 본 연구에서는 토지적성평가 평가체계II에서 사용되고 있는 각 지표 및 평가 결과에 대한 검수 방안을 제시함으로서, 토지적성평가 제도의 효율적인 지원 및 정착 방안을 제시하였다.

  • PDF

철도 시스템 개발에서 시스템공학 프로세스와 안전성 평가를 동시에 고려한 통합 프로세스에 관한 연구 (A Study on Integrated SE Process for the Development of the Railway Systems with Safety Assessment Included)

  • 윤재한;이재천;홍선호
    • 한국철도학회논문집
    • /
    • 제10권4호
    • /
    • pp.438-443
    • /
    • 2007
  • This paper proposes an integrated SE process for the development of railway systems with safety assessment included. Although the safety assessment process must be performed with SE process properly with good coordination, the interfaces between the two processes have not been clear. Thus, in many of safety critical system developments in Korea, it is difficult to assess safety in proper development phase. The process model proposed in this paper is based on both the concept of system life cycle and the repetitive use of SE process. In each of development phases, appropriate safety assessment methods are described. Also the evaluation of the integrated system incorporating safety factors is described. The resultant process model is expressed by the Enhanced Functional Flow Block Diagram (EFFBD) using a CASE tool. The model also allows timeline analysis for identifying activity flow and data flow, resulting in the effective management of process. In conclusion, the integrated process enable both the SE process and safety assessment process to cooperate with each other from early development phase throughout the whole system life cycle.

A review of the features, events, and processes and scenario development for Korean risk assessment of a deep geological repository for high-level radioactive waste

  • Kibeom Son;Karyoung Choi;Jaehyeon Yang;Haeram Jeong;Hyungdae Kim;Kunok Chang;Gyunyoung Heo
    • Nuclear Engineering and Technology
    • /
    • 제55권11호
    • /
    • pp.4083-4095
    • /
    • 2023
  • Currently, various research institutes in Korea are conducting research to develop a safety case for deep geological repository for high-level radioactive waste (HLW). In the past, low and intermediate-level waste (LILW) was approved by a regulatory body by performing a post-closure safety assessment, but HLW has different disposal characteristics and safety objectives are different. Therefore, in the case of HLW, safety assessment should be performed based on these changed conditions, and specific procedures are also under development. In this paper, the regulatory status of prior research institutes, feature, event and process (FEP) and scenario development cases were investigated for well-organized FEP and scenario development methodologies. In addition, through the results of these surveys, the requirements and procedures necessary for the FEP and scenario development stage during the safety assessment of repository for HLW were presented. These review results are expected to be used to identify the overall status of previous studies in conducting post-closure risk assessment for HLW repository, starting with identifying regulatory requirements, the most basic element.