• Title/Summary/Keyword: Assembly inspection

Search Result 158, Processing Time 0.022 seconds

Bearing Reinforcing Effect of Concrete Block with a Round End according to the Application of Aluminum Stiffener (알루미늄 보강재 적용에 따른 원형 단부 콘크리트 블록의 지압 보강 효과)

  • Seok Hyeon Jeon;Tae-Yun Kwon;Jin-Hee Ahn
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.3
    • /
    • pp.38-46
    • /
    • 2023
  • In this study, a bearing test was performed and analytically evaluated to evaluate the bearing performance according to the application of the aluminum stiffener in round-end concrete. In the bearing strength test, the change in bearing performance due to the aluminum stiffener using the aluminum form for manufacturing concrete with round-end, and the steel anchor bolts for member movement and assembly was confirmed. The FE analysis model was identically configured to the experimental conditions, and the result was compared with the experiment. Also, the crack patterns and stress behavior were confirmed. In addition, the effect of strength change of the aluminum stiffener on the round-end concrete was also evaluated analytically. The bearing strength of the round-end concrete increased by about 20% due to the aluminum stiffener, and it was confirmed that the steel anchor bolt did not affect the bearing strength. The maximum load and crack patterns shown as a result of FE analysis were similar to those of the experiment. As a result of FE analysis according to the strength change of the aluminum stiffener, the maximum load change according to the increase and decrease of the strength of the aluminum stiffener by 10% and 20% was evaluated to have no significant effect at a maximum of about 4% compared to before the strength change.

A Study on the Improvement of Crack Propagation in Wing Root Fairing Support by Pre-load in Military Aircraft Production Process (군용항공기 생산공정에서 발생하는 예하중에 의한 주익 루트 페어링 지지대 균열개선 연구)

  • Shin, Jae Hyuk;Jeong, Su-Heon;Kang, Gu-Heon;Lee, Heon Sub
    • Journal of Aerospace System Engineering
    • /
    • v.12 no.3
    • /
    • pp.38-44
    • /
    • 2018
  • Military aircraft may have fatigue cracks in structurally weak areas due to multiple factors such as the accumulation of flight time while perform various missions and unpredictable air conditions. As a fatigue crack progresses, there is a risk that the structure will be destroyed in extreme cases, which can have a significant impact on flight safety. In this study, a cracking phenomenon was observed during the periodic inspection the inner support of the fairing, which is installed to protect the connection between the wing and the body of the aircraft. Therefore, a study on a series of quality improvement processes for reformation was described. In order to identify the causes of cracks, pre-load generation occurrence during the wing assembly process was investigated and a fracture analysis was performed. Also, the design of the support structure was suggested in terms of preventing recurrence of cracks. The structural integrity was verified using a stress and fatigue life analysis.

Numerical Analysis of the Effect of Hole Size Change in Lower-Support-Structure-Bottom Plate on the Reactor Core-Inlet Flow-Distribution (하부지지구조물 바닥판 구멍크기 변경이 원자로 노심 입구 유량분포에 미치는 영향에 관한 수치해석)

  • Lee, Gong Hee;Bang, Young Seok;Cheong, Ae Ju
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.39 no.11
    • /
    • pp.905-911
    • /
    • 2015
  • In this study, to examine the effect of a hole size change(smaller hole diameter) in the outer region of the lower-support-structure-bottom plate(LSSBP) on the reactor core-inlet flow-distribution, simulations were conducted with the commercial CFD software, ANSYS CFX R.15. The predicted results were compared with those of the original LSSBP. Through these comparisons, it was concluded that a more uniform distribution of the mass flow rate at the core-inlet plane could be obtained by reducing the hole size in the outer region of the LSSBP. Therefore, from the nuclear regulatory perspective, design change of the hole pattern in the outer region of the LSSBP may be desirable in terms of improving both the mechanical integrity of the fuel assembly and the core thermal margin.

A Study on the Development of a Work Operation Process Chart for Smart Distribution Board Fabrication (스마트 분전반 제작을 위한 작업 공정도 개발에 관한 연구)

  • Lee, Byung-Seol;Choi, Chung-Seog
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.3
    • /
    • pp.15-20
    • /
    • 2017
  • This study presented the strength of the materials and parts for smart distribution board fabrication, and developed a work operation process chart for smart distribution board fabrication. This work operation process chart for smart distribution board fabrication complied with SPS-KEMC regulations, and the applicable range and object are less than 1,000 V and 1,000 Hz for the AC distribution board and less than 1,500 V for the DC distribution board. The power supply is 3 phase 4 wires ($3{\Phi}$ 4W), divided into a single phase circuit and a 3 phase circuit. In addition, the circuit was configured so that the leakage current flowing through the distribution line of the load could be monitored in real time by using the sensor module installed at the rear end of the circuit breaker. Therefore, the administrator can easily find the risk factor of the load since engineer can check the leakage current of each distribution line. In addition, if a leakage current greater than standard value flows, it is possible to generate an alarm against a short circuit and cut off the leakage current. The work operation process chart for the smart distribution board fabrication consists of the following steps: raw and subsidiary materials, sheet metal work, tube making, welding, painting, busbar fabrication, assembly and wiring, product inspection, shipment, etc. Moreover, symbols, ${\Delta}$, ${\nabla}$, ${\bigcirc}$, ${\Rightarrow}$, etc. were used according to the type of work and work progress so that workers can easily understand the progress of the work.

Price Evaluations on Tourist of Jeju Tourism Package Product: Focused on Prospect Theory (제주특별자치도 관광패키지상품 가격 평가: 전망이론을 적용하여)

  • Park, Suk-Jin;Kim, Tae-Heon
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.6
    • /
    • pp.469-480
    • /
    • 2013
  • This study suggests 12 products regarding the pending question of tourism package price mechanism which is linked directly and indirectly to Jeju Tourism, and shows the following conclusions through inspection in mental accounting principles and framing effect based on prospect theory. First, when presenting the price list of the tourism package, it is needed to present in price bundling. Second, it is proven that it is desirable that information about discount prices open the individual discount information of the basic package and option package to public. Third, it is discovered that experienced tourists in purchasing tourism products are more sensitive to price information (price discount) than inexperienced tourists, so that framing effect conform to Knowledge-assembly theory. The current questions of this study are that 'no discount' information should be presented in bundling, that the method of framing is important in presenting discount product information. It is required not only to grasp the viewpoint of modern people in purchasing tourism products, but also to present ready-to-serve products which can save time, effort, cost to give stability in mental accounting principles.

A Study on Distribution Standardization through AMOS Analysis (AMOS 분석을 통한 물류효율화에 관한 고찰)

  • Koh, Jae-Ho;Kim, Tae-Hwan;Kim, Sok-Eun;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.3
    • /
    • pp.167-181
    • /
    • 2008
  • There are lack of labour and increase in logistics costs due to rapid change in logistics environments and the demand for logistics. The reality is that over spending on logistics costs are getting worse due to lack of logistics standardization. An example will be excessive logistics costs caused by unsatisfactory use of logistics equipments in wholesale markets. The logistics efficiency is falling due to delays in using logistics equipments and standardization. Therefore, there needs standardization of logistics functions and unit of handling in each stage from packing, unloading, storage, transporting, logistics information and needs logistics standardization on equipments, machineries used for the above. Standard unified with standardization is called specification and if standardization is applied broadly in manufacturing or processing, inspection than each process in terms of production can be managed rationally and labour skills will improve and product quality will be evenly maintained and compatability of each part in terms of assembly will be maintained thus materials and labour could be saved thus results in increasing productivity and lowering production costs. Also, if it is applied in industry at state-level then there will be rationalization in consumption in circulation as in purchase of raw materials, sales of products, purchase of products by consumers and contribute in improving compatibility and fair transactions. This paper is aimed to help in first solving factors affecting the most in improving logistic efficiency among unit load system and logistic hollowization, standardizing logistics base, standardizing logistics information. The study conducted surveys on limited companies but hope that in the future the target companies can be divided further into types, industries and conduct more demonstrative analysis.

A Novel Al-Bridged Trinuclear Iron(II) Bis(imino)pyridyl Complex with Catalytic Ethylene Polymerization Behavior

  • Long, Zerong;Li, Zhongquan;Ma, Ning;Wu, Biao
    • Bulletin of the Korean Chemical Society
    • /
    • v.32 no.8
    • /
    • pp.2537-2543
    • /
    • 2011
  • A self-assembled Al-bridged diiminopyridine-based ligand (3) was synthesized and characterized by FT-IR, ESI-MS and NMR spectroscopy. Electron spectral titrations were performed to confirm the formation of a novel trinuclear bis(imino)pyridyl iron(II) complex (4) upon addition of $FeCl_2$ into Al-bridged ligand 3 in methanol solution. Simultaneously, a typical bis(imino)pyridine-iron(II) complex (2) was synthesized and fully characterized. The X-ray crystal study of the iron(II) complex 2 disclosed a five-coordinate, distorted square-pyramidal structure with the tridentate N^N^N ligand and chlorides. The optimal molecular structure of 4 was obtained by means of molecular mechanics, which showed that each iron atom in the complex 4 is surrounded by two chlorides, a tridentate N^N^N ligand and one oxygen atom, supporting considerations about the possibility of six-coordinate geometry from MMAO or the ethylene access. A comparison of 4 with the reference 2 revealed a remarkable decrease of the catalytic activity and MMAO consumption (activity up to $0.41{\times}10^3\;kg\;{mol_{Fe}}^{-1}h^{-1}bar^{-1}$, Al/Fe = 650 for 4 and $7.02{\times}10^3\;kg\;{mol_{Fe}}^{-1}h^{-1}bar^{-1}$, Al/Fe = 1600 for 2).

A Experimental Study on Effluence Characteristic of the Rainfall in the IRMA Green Roof System of KICT (역지붕 녹화옥상시스템[KICT-GRS2004]의 우수유출 특성에 관한 실험적 연구)

  • Jang, Dae-hee;Kim, Hyeon-soo;Lee, Keon-ho;Moon, Soo-young
    • KIEAE Journal
    • /
    • v.5 no.2
    • /
    • pp.11-18
    • /
    • 2005
  • The Purpose of this study is development and analysis of Effluence Characteristic of the Rainfall in the IRMA Green Roof System(developed in KICT) Plus 50 program is an internal research project at KICT(Korean Institute of Construction Technology) which has it as an object ; to lengthen the building's life 50-year or more and reduce energy conception 50% than present. Green roof system is one of the most important theme in the Plus 50 program. Generally, a Green Roof System has a positive effect on the thermal conductivity in winter, the micro cooling effect on building and city by evaporation in summer, the flood-control effect by runoff-reduction or the treated rainwater-quality of green roof system and so on. However, inspection of the physical effect of green roof system does not consider in Korea. Above all, long-term monitoring and a whole observation of green roof system is needed to probate the effect. So a new experimental method could be tried in this research, which is never attempted in Korea. The measurement by a bucket with a great volume, 1L, gives a new dimension of measuring green roof effect to measure the permanent running flood from a wide roof. This offers a reasonable result on a long-term measuring of a running water. Additionally, the thermal behavior of the IRMA(Insulated Roof Membrane Assembly), known in the western europe as a reasonable solution at green roof system by economical benefits and easy construction, would be experimented.

Detection of tension force reduction in a post-tensioning tendon using pulsed-eddy-current measurement

  • Kim, Ji-Min;Lee, Jun;Sohn, Hoon
    • Structural Engineering and Mechanics
    • /
    • v.65 no.2
    • /
    • pp.129-139
    • /
    • 2018
  • Post-tensioning (PT) tendons are commonly used for the assembly of modularized concrete members, and tension is applied to the tendons during construction to facilitate the integrated behavior of the members. However, the tension in a PT tendon decreases over time due to steel corrosion and concrete creep, and consequently, the stress on the anchor head that secures the PT tendon also diminishes. This study proposes an automatic detection system to identify tension reduction in a PT tendon using pulsed-eddy-current (PEC) measurement. An eddy-current sensor is installed on the surface of the steel anchor head. The sensor creates a pulsed excitation to the driving coil and measures the resulting PEC response using the pick-up coil. The basic premise is that the tension reduction of a PT tendon results in stress reduction on the anchor head surface and a change in the PEC intensity measured by the pick-up coil. Thus, PEC measurement is used to detect the reduction of the anchor head stress and consequently the reduction of the PT tendon force below a certain threshold value. The advantages of the proposed PEC-based tension-reduction-detection (PTRD) system are (1) a low-cost (< $ 30), low-power (< 2 Watts) sensor, (2) a short inspection time (< 10 seconds), (3) high reliability and (4) the potential for embedded sensing. A 3.3 m long full-scale monostrand PT tendon was used to evaluate the performance of the proposed PTRD system. The PT tendon was tensioned to 180 kN using a custom universal tensile machine, and the tension was decreased to 0 kN at 20 kN intervals. At each tension, the PEC responses were measured, and tension reduction was successfully detected.

Study of Tolerance Suitability of Door Operation Mechanism on Mobile Air Handing Unit Using 3-DCS Analysis (3-DCS를 이용한 자동차 공기 분배장치의 도아 구동 기구의 공차 적합성 분석에 대한 연구)

  • Kim, Jongsu;Lee, Daewoong
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.24 no.5
    • /
    • pp.527-537
    • /
    • 2016
  • Recent automakers are trying to be more precise with the dimension check and moving parts to guarantee high quality and satisfy customer requirements. The aim of this paper is to investigate the design tolerance suitability of door operating mechanism linked arms, lever, and cam-shaft in a mobile air handling unit. These parts are complicated because doors, arms, lever and cam-shaft are connected nonlinearly in 3D. The current tolerance analysis method poses problems in design analysis because the moving doors are reasonably suitable for the AHU function. The 3-DCS analysis method provided useful results not only in establishing the inspection criteria for the quality control of products but also in enabling economical production. As a result, the vent door had $1.62^{\circ}{\sim}1.72^{\circ}$ and the defrost door had $0.84^{\circ}{\sim}0.9^{\circ}$ for the directly connected arms operating-type. For the lever connected arm operating-type, the foot door had $2.0^{\circ}{\sim}2.24^{\circ}$ tolerance, while the tolerance values satisfied the air flow volume distribution rate criteria in the AHU. Finally, the results have confirmed the design's tolerance suitability by using 3-DCS analysis at the early design stages. Reliability can be achieved by analyzing accumulated tolerance during the sub-parts assembly process and the moving mechanism linked especially by arms, lever, and cam-shaft.