• Title/Summary/Keyword: Assembly constraints

Search Result 108, Processing Time 0.025 seconds

ANALYSIS OF THE OPTIMIZED H TYPE GRID SPRING BY A CHARACTERIZATION TEST AND THE FINITE ELEMENT METHOD UNDER THE IN-GRID BOUNDARY CONDITION

  • Yoon Kyung-Ho;Lee Kang-Hee;Kang Heung-Seok;Song Kee-Nam
    • Nuclear Engineering and Technology
    • /
    • v.38 no.4
    • /
    • pp.375-382
    • /
    • 2006
  • Characterization tests (load vs. displacement curve) are conducted for the springs of Zirconium alloy spacer grids for an advanced LWR fuel assembly. Twofold testing is employed: strap-based and assembly-based tests. The assembly-based test satisfies the in situ boundary conditions of the spring within the grid assembly. The aim of the characterization test via the aforementioned two methods is to establish an appropriate assembly-based test method that fulfills the actual boundary conditions. A characterization test under the spacer grid assembly boundary condition is also conducted to investigate the actual behavior of the spring in the core. The stiffness of the characteristic curve is smaller than that of the strap-wised boundary condition. This phenomenon may cause the strap slit condition. A spacer grid consists of horizontal and vertical straps. The strap slit positions are differentiated from each other. They affords examination of the variation of the external load distribution in the grid spring. Localized legions of high stress and their values are analyzed, as they may be affected by the spring shape. Through a comparison of the results of the test and FE analysis, it is concluded that the present assembly-based analysis model and procedure are reasonably well conducted and can be used for spring characterization in the core. Guidelines for improving the mechanical integrity of the spring are also discussed.

Design of Integrated Process-Based Model for Large Assembly Blocks Considering Resource Constraints in Shipbuilding (자원제약을 고려한 조선 대조립 공정의 통합 프로세스 기반 모델 설계)

  • Jeong, Eunsun;Jeong, Dongsu;Seo, Yoonho
    • Journal of the Korea Society for Simulation
    • /
    • v.28 no.2
    • /
    • pp.107-117
    • /
    • 2019
  • Because shipbuilding is single-product production with limited resources, production management technology is essential to manage the resources effectively and maximize the productivity of ship-process. Therefore, many shipbuilding companies are conducting research on ship production plan and process considering various constraints in the field by applying modeling and simulation. However, it is difficult to provide accurate production plan on sudden schedule and process changes, and to understand the interconnectivity between the processes that produce blocks in existing research. In addition, there are many differences between the production planning and field planning because detailed processes and quantity of blocks can not be considered. In this research, we propose the integrated process-based modeling method considering process-operation sequences, BOM(Bill of materials) and resource constraints of all the scheduled blocks in the indoor system. Through the integrated process-based model, it is easy for the user to grasp the assembly relationship, workspace and preliminary relationship of assembly process between the blocks in indoor system. Also, it is possible to obtain the overall production plan that maximizes resource efficiency without the separate simulation and resource modeling procedures because resource balancing that considers the amount of resource quantity shared in the indoor system is carried out.

Difference analysis of the collapse behaviors of the single-story beam-column assembly and multi-story planar frame

  • Zheng Tan;Wei-Hui Zhong;Bao Meng;Xing-You Yao;Yu-Hui Zheng;Yao Gao;Shi-Chao Duan
    • Steel and Composite Structures
    • /
    • v.50 no.3
    • /
    • pp.265-280
    • /
    • 2024
  • The collapse behavior observed in single-story beam-column assembly (SSBCA) do not accurately represent the actual overall stress characteristic of multi-story frame structure (MSFS) under column loss scenario owing to ignoring the interaction action among different stories, leading to a disconnection between the anti-collapse behaviors of "components" and "overall structures", that is, the anti-collapse performance of frame structures with two different structural scales has not yet formed a combined force. This paper conducts a numerical and theoretical study to explore the difference of the collapse behaviors of the SSBCA and MSFS, and further to reveal the internal force relationships and boundary constraints at beam ends of models SSBCA and MSFS. Based on the previous experimental tests, the corresponding refined numerical simulation models were established and verified, and comparative analysis on the resistant-collapse performance was carried out, based on the validated modeling methods with considering the actual boundary constraints, and the results illustrates that the collapse behaviors of the SSBCA and MSFS is not a simple multiple relationship. Through numerical simulation and theoretical analysis, the development laws of internal force in each story beam under different boundary constraints was clarified, and the coupling relationship between the bending moment at the most unfavorable section and axial force in the composite beam of different stories of multi story frames with weld cover-plated flange connections was obtained. In addition, considering the effect of the yield performance of adjacent columns on the anti-collapse bearing capacities of the SSBCA and MSFS during the large deformation stages, the calculation formula for the equivalent axial stiffness at the beam ends of each story were provided.

Analysis of the Economic Ripple Effect of New Financial Input in the National Assembly FM Radio (국회 FM 라디오의 신규 재정 투입에 따른 경제적 파급 효과 분석)

  • Park, Sungmin
    • Journal of Broadcast Engineering
    • /
    • v.26 no.5
    • /
    • pp.575-582
    • /
    • 2021
  • This study would analyze the economic impact of the new financial input to the National Assembly FM Radio. Recently, with the 4th industrial revolution and the change in the new media paradigm, there are changes into multi-media and multi-channels, such as mobile, Internet, and OTT, etc. Reflecting these changing internal and external conditions, National Assembly Television, too, should introduce FM radio broadcasting so that the viewers can use the public services without spatial and temporal constraints. Thus, this study would conduct an analysis, estimating the budget required for investing the new government funding in the National Assembly FM Radio. As for the main analysis results, the coefficient of production inducement was 1.661; that of added value, 1.141; and that of employment inducement, 7.1. In the capital district, the effect on production inducement was 6.928 billion won; that on added value inducement, 4.758 billion won; and that on employment inducement, 28.4 persons. In addition, in the whole country, the effect on production inducement was 13.257 billion won; that on added value inducement, 9.106 billion won; and that on employment inducement, 49.7 persons.

Survey of Evolutionary Algorithms in Advanced Planning and Scheduling

  • Gen, Mitsuo;Zhang, Wenqiang;Lin, Lin
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.35 no.1
    • /
    • pp.15-39
    • /
    • 2009
  • Advanced planning and scheduling (APS) refers to a manufacturing management process by which raw materials and production capacity are optimally allocated to meet demand. APS is especially well-suited to environments where simpler planning methods cannot adequately address complex trade-offs between competing priorities. However, most scheduling problems of APS in the real world face both inevitable constraints such as due date, capability, transportation cost, set up cost and available resources. In this survey paper, we address three crucial issues in APS, including basic scheduling model, job-shop scheduling (JSP), assembly line balancing (ALB) model, and integrated scheduling models for manufacturing and logistics. Several evolutionary algorithms which adapt to the problems are surveyed and proposed; some test instances based on the practical problems demonstrate the effectiveness and efficiency of evolutionary approaches.

A Heuristic Algorithm for Block Storage Planning in Shipbuilding (조선 산업의 블록 적치장 운영계획 휴리스틱 알고리즘)

  • Son, Jung-Ryoul;Suh, Heung-Won;Ha, Byung-Hyun
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.51 no.3
    • /
    • pp.239-245
    • /
    • 2014
  • This paper deal with the block storage planning problem of storing and retrieving assembly blocks in a temporary storage yard with limited capacity, which is one of the critical managerial problems in shipbuilding. The block storage planning problem is required to minimize the number of relocations of blocks while the constraints for storage and retrieval time windows are satisfied. We first show NP-hardness of the block storage planning problem. Next we propose a heuristic algorithm to generate good quality solutions for larger instances in very short computational time. The proposed heuristic algorithm was validated by comparing the results with the mathematical model presented in the previous study.

Algorithms for Production Planning and Scheduling in an Assembly System Operating on a Make-to-Order Basis (주문생산방식을 따르는 조립시스템에서의 생산계획 및 일정계획을 위한 알고리듬)

  • Park, Moon-Won;Kim, Yeong-Dae
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.24 no.3
    • /
    • pp.345-357
    • /
    • 1998
  • This paper focuses on production planning and scheduling problems in an assembly system operating on a make-to-order basis. Due dates are considered as constraints in the problems, that is, tardiness is not allowed. Since the planning problem is a higher-level decision making than the scheduling problem, the scheduling problem is solved using a production plan obtained by solving the planning problem. We suggest heuristic procedures in which aggregated information is used when the production planning problem is solved while more detailed information is used when the scheduling problem is solved. Since a feasible schedule may not be obtained from a production plan, an iterative approach is employed in the two procedures to obtain a solution that is feasible for both the production planning and scheduling problems. Computational tests on randomly generated test problems are done to show the performance of these algorithms, and results are reported.

  • PDF

A Genetic Algorithm with a New Repair Process for Solving Multi-stage, Multi-machine, Multi-product Scheduling Problems

  • Pongcharoen, Pupong;Khadwilard, Aphirak;Hicks, Christian
    • Industrial Engineering and Management Systems
    • /
    • v.7 no.3
    • /
    • pp.204-213
    • /
    • 2008
  • Companies that produce capital goods need to schedule the production of products that have complex product structures with components that require many operations on different machines. A feasible schedule must satisfy operation and assembly precedence constraints. It is also important to avoid deadlock situations. In this paper a Genetic Algorithm (GA) has been developed that includes a new repair process that rectifies infeasible schedules that are produced during the evolution process. The algorithm was designed to minimise the combination of earliness and tardiness penalties and took into account finite capacity constraints. Three different sized problems were obtained from a collaborating capital goods company. A design of experimental approach was used to systematically identify that the best genetic operators and GA parameters for each size of problem.

Basic Theory on a Multi-Mode CVT (다중모드 무단 변속기의 구조이론에 관한 연구)

  • Lee, Jin-Won;Jang, Uk-Jin;Park, Jin-Ho;Park, Yeong-Il;Lee, Jang-Mu
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.24 no.10 s.181
    • /
    • pp.2477-2486
    • /
    • 2000
  • A planetary gear assembly is a key component to combine and/or split a power from the source. With a planetary gear assembly, a continuously variable unit extends its capacity by means of power bra nching mechanism. Power branching with one planetary gear assembly and one continuously variable unit is categorized into 12 basic types. Each type represents peculiar power transmitting characteristics. Additionally, a multi-mode (range) continuously variable transmission can be designed with accompanying clutches. A multi-mode continuously variable transmission changes the path through which the source power is transmitted. Each path has its own features, such as high efficiency. In this paper, some design principles are examined such as, criteria to guarantee the minimum power efficiency, and constraints to guarantee the smooth mode shift after discussing well-known features of multi-mode M mathematically.

Optimal Design of the Flexure Mount for Optical Mirror Using Topology Optimization Considering Thermal Stress Constraint (열응력 제한조건이 고려된 위상최적화 기법을 이용한 광학 미러 플렉셔 마운트 최적설계)

  • Kyoungho, Lee;Joong Seok, Lee
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.25 no.6
    • /
    • pp.561-571
    • /
    • 2022
  • An optical mirror assembly is an opto-mechanically coupled system as the optical and mechanical behaviors interact. In the assembly, a flexure mount attached to an optical mirror should be flexible in the radial direction, but rigid for the remaining degrees of freedom for supporting the mirror rigidly and suppressing the wavefront error of the optical mirror. This work presents an optimal design of the flexure mount using topology optimization with thermal stress constraint. By simplifying the optical mirror assembly into finite shell elements, topology optimization model was built for efficient design and good machinability. The stress at the boundary between the optical mirror and the mount together with the first natural frequency were applied as constraints for the optimization problem, while the objective function was set to minimize the strain energy. As a result, we obtained the optimal design of the flexure mount yielding the improved wavefront error, proper rigidity, and machinability.