• Title/Summary/Keyword: Asphalt overlay

Search Result 77, Processing Time 0.027 seconds

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

A Study on the Determination of Density and Moisture Content of Asphalt Concrete Pavement and Subgrade Using Nuclear Density Meter (방사선측정치를 이용한 아스콘 포장 및 노상의 현장밀도와 함수비 측정에 관한 연구)

  • 진성기;도덕현
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.36 no.4
    • /
    • pp.103-116
    • /
    • 1994
  • The objective of this study was to determine the criteria for density and moisture content measurements made with a nuclear density meter on common materials in the construction field. The study also sought to test a full-type nuclear density meter in controlling the density of overlay layers( 2.5~5.0cm). In order to determine the accuracy and reliablility of nuclear guage measurements made on construction materials, laboratory and field tests were conducted. Wooden blocks( 65 x 45 ${\times}$ 50 cm) and a special steel compactor( 4.7kg) were constructed in order to carry out tests which were conducted on three different materials; coarse gramed soil, fine grained soil, and AC material. Throughout all laboratory and field tests, the nuclear density and moisture content were determined using Humboldt 5OOLP nuclear gauge. The tests on subgrade material entailed obtaining density measurements by means of both the sand replacement method and the nuclear density meter. The results of the sand replacement method were then compared to the readings recorded bu the meter. As in the subgrade material tests, density measurements made during AC pavement tests were also determined using the unclear meter in addition to a second means; through the core method. The meter readings and core densties were compared as was done in the tests on subgrade materials. The correlation between the results of the sand replacement test( also, the core method) and meter readings on subgrade material was then determined. Sirnilarly, the observed results were then analyzed through linear regression. The tests to determine thin-lift density by means of a full-type nuclear density meter also conducted on the overlay layers( about 4. 8cm thickness) above AC pavements at road construction sities in Korea.

  • PDF

Analysis Study on Fatigue Stress on the Orthotropic Steel Deck Applied Polymer Concrete Pavement (폴리머 콘크리트 포장을 적용한 강바닥판의 피로응력에 관한 해석적 연구)

  • Han, Bum-Jin;Yoon, Sang-Il;Choi, Byung-Jin;Choi, Jin-Woong;Park, Sun-Kyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.5
    • /
    • pp.68-77
    • /
    • 2014
  • In this study, polysulfide epoxy polymer concrete was chosen as an ultra thin bridge deck overlay, and the effect of polymer concrete pavement on the fatigue stress range of the orthotropic steel deck was analyzed through the comparative analysis with epoxy asphalt pavement and SFRC pavement. Abaqus was used to estimate the fatigue stress range, and signed von-mises stress was used to estimate fatigue stress range according to pavement materials and thickness, considering there were multi axis stresses which have longitudinal and lateral direction on the welded parts of the steel deck.

Mechanistic-Empirical Guideline for Routine Overweight Truck Traffic Routes (과하중 트럭 운행 도로에 대한 역학적-경험적 지침)

  • Oh, Jeongho
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.1
    • /
    • pp.1-10
    • /
    • 2013
  • The main objective of this research is to develop the Mechanistic-Empirical (M-E) guidelines for evaluating the capacity of existing highways to sustain route overweight truck traffic over a specified performance period due to a growing concern on the impact of increasing overweight truck loads on highways. In this study, a two-stage framework was developed for this purpose. Level I procedure involves the use of pavement evaluation charts to identify the best possible route from among the alternatives considered and to determine what additional tests and analyses are needed as a screening tool. Level II involves the application of the Overweight Truck Route Analysis (OTRA) program to evaluate the structural adequacy of an existing route to carry routine overweight truck traffic over the specified performance period along with estimating asphalt concrete overlay thickness, if necessary.

Field Application Evaluation of Black VES-LMC (흑색 VES-LMC의 현장적용성 평가)

  • Jung, Won-Kyong;Kil, Yong-Su;Kim, Yong-Bin;Yun, Kyong-Ku
    • International Journal of Highway Engineering
    • /
    • v.13 no.1
    • /
    • pp.177-183
    • /
    • 2011
  • VES-LMC(very-early strength latex modified concrete) has been widely used as repair material for bridge deck overlay or rehabilitation, because it could be opened to the traffic after 3 hours of curing. However, the bright color of VES-LMC disturb driver's sigh. A black VES-LMC, matching to asphalt concrete, was developed and applied at a filed for driver's comfort and safety. The black VES-LMC included 2% carbon black in cement weight ratio. A series of performance evaluation for black VES-LMC was done in terms of field applicability, pavement color and temperature change. The field applicability test result showed that there were no change of workability, slump and air void, and the compressive strengthen developed more than 20MPa after 4 hours of placement. The thermal stress of black VES-LMC was smaller than that of OPC and asphalt concrete, which means the stability of black VES-LMC. The performance evaluation result showed that the black VES-LMC could prevent road icing at below zero temperatures and promote thawing at melting temperature.

A Study for Determining the Rehabilitation Method Group using NHPCI on Asphalt Concrete Pavement of National Highway (국도 아스팔트 포장의 NHPCI(National Highway Pavement Condition Index)를 활용한 보수공법그룹 결정에 관한 연구)

  • Son, Hyeon Jang;Kwon, Soo-Ahn;Lee, Jae Jun;Baek, Cheolmin;Lim, Jae Kuy;Sin, Hyun Jin
    • International Journal of Highway Engineering
    • /
    • v.15 no.2
    • /
    • pp.1-9
    • /
    • 2013
  • PURPOSES : The PMS(Pavement Management System) has been utilized in order to efficiently allocate the limited budget for the maintenance of national highway system. In the PMS of national highway, surface pavement condition is evaluated by using the VI (Visual Index). However, the VI is determined only by considering the cracking rate (%) and rut depth (mm), which is not reflecting the IRI (International Roughness Index) that is known as an important factor of pavement performance. In this study, the NHPCI (National Highway Pavement Condition Index) which includes the cracking rate (%), rut depth (mm), and IRI (m/km) is suggested for determining the rehabilitation methods group. METHODS : First, the rehabilitation methods performed between 2008 and 2010 on the national highway is classified and then, NHPCI is determined for each rehabilitation method. Next, the NHPCI for each rehabilitation method is grouped through the interval estimation of the population mean and T-test analysis. RESULTS : According to NHPCI range, the rehabilitation methods are divided into four categories: Not Required, Preventive Maintenance, Overlay Treatment (with or without cutting), and Full-scale Treatment (i.e., reconstruction). CONCLUSIONS : Based on this study, it is recommended that the appropriate NHPCI range should be determined through the combination of the rehabilitation categories and Decision Procedure of Pavement Distress Condition Visual Index.

Relative Permittivity of Damaged Concrete Bridge Deck According to the Weather Conditions : A Case Study (기상조건에 따른 손상 교량 바닥판의 상대유전율 변화 고찰)

  • Rhee, Ji-Young;Choi, Jae-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.4
    • /
    • pp.209-215
    • /
    • 2017
  • Ground Penetrating Radar (GPR) was applied to an evaluation of the concrete condition of bridge decks with asphalt concrete. Deterioration was considered to have occurred when the relative permittivity of a concrete-faced asphalt concrete overlay showed more than 12. The relative permittivity of concrete varied considerably with the levels of porosity and water. In this study, GPR tests were carried out to determine the influence of weather and concrete condition on the relative permittivity for the research subject of an overlaid concrete bridge deck in public service. According to the test results, if bridge decks are in good condition, the relative permittivity of the top concrete of a bridge deck exhibited a normal distribution. After the deck concrete deteriorated, the relative permittivity varied with the amount of penetrated water according to the weather condition and deteriorated status of deck concrete.

Rubblization of Thick Concrete Pavement (두꺼운 콘크리트포장의 원위치파쇄 기층화공법)

  • Lee Seung-Woo;Han Seung-Hwan;Ko Suck-Bum;Kim Ji-Won
    • International Journal of Highway Engineering
    • /
    • v.8 no.3 s.29
    • /
    • pp.105-114
    • /
    • 2006
  • A popular alternative to extend the life of aged pavement is asphalt overlay. However, it has a very serious and inherent shortcoming in deterring a reflection crack. Although joint-rehabilitation and stress-relief techniques have been applied to deter such reflection cracks in aged pavement, the techniques had a limited success only in slowing down the progress of a reflection crack. Rubblization technique rubblizes the concrete pavement slab in situ and uses the rubblized slab as the base material. Then, pavement overlay is applied to finish off the rehabilitation of aged pavement. This rubblization technique has the advantage of solving the problem of reflection cracking completely. When rubblization technique is applied, the upper layer of aged concrete pavement is rubblized between 40mm-70mm in depth. However, the lower layer is typically rubblized more than 100mm in depth. Nevertheless, it is difficult to turn the entire concrete pavement of more than 30cm in depth into rubblized aggregate of appropriate size. Thus, a simulation experiment was carried out to find the appropriate rubblized depth, which avoids the reflection cracking and still maintains the function of subbase, by varying the depth of rubblized depth in loom increments of 0cm, 10cm, and 20cm. The result indicated the optimum rubblized depth was 10cm (Lee, 2006). Additionally, a small rubblizinge equipment was developed in order to derive the rubblization technique appropriate for thick concrete pavement. This equipment was tested out on an experimental pavement, which was constructed with the same standard and specification for the road in actual use, by varying its rubblizing head shape and energy as well as the effective area of rubblization. This experiment led to a prototype equipment for rubblization of thick concrete pavement. The prototype was put into use on a highway, undergoing a test construction and monitoring afterwards. This entire process was necessary for the validation of the proposed rubblization technique.

  • PDF

Basic Performance Evaluation of a Tack Coat Material for Use with a Spray Paver (동시포설 공법을 위한 택코트 재료의 기초 성능 평가 연구)

  • Jo, Shinheang;Kim, Kyungnam;Cui, Wenhui;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.6
    • /
    • pp.737-744
    • /
    • 2021
  • Spray paving minimizes material lost during the construction or repair of a road surface, and it can be done in conjunction with tack coating. This approach involves applying the asphalt mixture at the same time as spraying the tack coat by attaching a spraying device to the asphalt paver. When applying an asphalt overlay to an aged concrete surface, it is important to ensure the adhesion performance between different material properties. Accordingly, there is a need for a tack coat that can be applied by spray paving and that exhibits good adhesive performance on different materials. In this study, bonding strength tests under various conditions were performed to evaluate the basic performance of a tack coat developed for use with a spray paver. The bonding performance of the tack coat was observed to be affected by curing conditions and material lost during construction. The test results also showed that the tensile and shear bonding strengths of the developed tack coat were 1.21 and 1.99 times higher than those of a conventional one, respectively. As a result, the developed tack coat is considered suitable for application to spray paving.

Fractal evaluation of the level of alligator cracking in pavements

  • Vallejo, Luis E.
    • Geomechanics and Engineering
    • /
    • v.4 no.3
    • /
    • pp.219-227
    • /
    • 2012
  • Pavement management systems require systematic monitoring of pavement surfaces to determine preventive and corrective maintenance. The process involves the accumulation of large amounts of visual data, typically obtained from site visitation. The pavement surface condition is then correlated to a pavement distress index that is based on a scoring system previously established by state or federal agencies. The scoring system determines if the pavement section requires maintenance, overlay or reconstruction. One of the surface distresses forming part of the overall pavement distress index is the Alligator Crack Index (AC Index). The AC Index involves the visual evaluation of the crack severity of a section of a pavement as being low, medium, or high. This evaluation is then integrated into a formula in order to obtain the AC Index. In this study a quantification of the visual evaluation of the severity of alligator cracking is carried out using photographs and the fractal dimension concept from fractal theory. Pavements with low levels of cracking were found to have a fractal dimension equal to 1.051. Pavements with moderate levels of cracking had a fractal dimension equal to 1.1754. Pavements with high degrees of cracking had a fractal dimension that varied between 1.5037 (high) and 1.7111 (very high). Pavements with a level of cracking equal to 1.8976 represented pavements that disintegrated and developed potholes. Thus, the visual evaluation of the state of cracking of a pavement (the AC Index) could be enhanced with the use of the fractal dimension concept from fractal theory.