• Title/Summary/Keyword: Area Pricing

Search Result 69, Processing Time 0.025 seconds

A Study on the Cost of Capital of Islamic Enterprise (이슬람기업의 자본조달비용에 관한 연구)

  • Choi, Tae-Yeong
    • International Area Studies Review
    • /
    • v.13 no.2
    • /
    • pp.505-523
    • /
    • 2009
  • We study the cost of capital of Islamic enterprise using the Capital Asset Pricing Model(CAPM). When there exists no risk-free interest rate, the security market line(SML) of Islamic enterprise shows an upward slope starting from the origin. The slope is bigger than that of SML with risk-free interest rate. This is because the cost of capital of Islamic enterprise is higher than that of western firms for the same level of systematic risk. When the effect of zakat is considered, the risk-free interest rate is replaced by minimum required rate of return. The SML of Islamic enterprise reveals an upward slope but it does not pass through the origin. This is because Islamic enterprise cannot invest on risk-free asset. In order to overcome the theoretic limits of CAPM, we propose to use multi-factor approach such as arbitrage pricing model instead of single-factor model for future study.

Yield Management Models for Two Substitutable Products (두 대체품에 대한 수익관리 모형 연구)

  • Kim, Sang-Won
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.41 no.2
    • /
    • pp.1-16
    • /
    • 2016
  • Yield management, which originated from the U.S. service industry, uses pricing techniques and information systems to make demand management decisions. Demand uncertainty is an important factor in the area of demand management. A key strategy to reduce the effects of demand uncertainty is substitution. The most generally known type of substitution is inventory-driven substitution, in which consumers substitute an out-of-stock product by buying a similar or other type of product. Another type of substitution is the price-driven substitution, which occurs as a result of price changes. In this research, we consider two market segments that have unique perishable products. We develop yield management optimization models with stochastic demand based on the newsvendor model where inventory-driven and price-driven substitutions are allowed between products in the two market segments. The most significant contribution of this research is that it develops analytical procedures to determine optimal solutions and considers both types of substitution. We also provide detailed theoretical analysis and numerical examples.

A Study on Pricing Model of High-Rise Residential Buildings From the viewpoint of Landmark Factor

  • Sung-Kon Moon;Sang-Hyo Lee;Kyung-Min Min;Joo-Sung Lee;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.573-578
    • /
    • 2009
  • Previous research on super high rise buildings focused mostly on the use of public space from building plan perspective, survey of residents' satisfaction evaluation, construction technology and structural technology. But little research is done on the economic analysis of landmark factors. The purpose of this study is to find landmark factors that can be quantitatively measured, collect data on super high rise residential buildings in Seoul. Find the intrinsic values of the landmarks, and analyze how these values differ in areas with different densities, i.e. in 3 Gangnam-gus & Yeongdeungpo-gu and in other areas. It is expected that the results of this study can be used to set an appropriate price of super high rise building in consideration of its landmark value in different area

  • PDF

Empirical Analysis of Man-hour Data to Support a Cost-Plus Pricing Approach for Estimating BIM Service Costs

  • Koo, Bonsang;Lee, Ghang;Kim, Chung-woon;Shin, Byungjin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.660-661
    • /
    • 2015
  • Building Information Modeling (BIM) is a nascent technology in Korea, and currently lacks formal guidelines to assist Architectural and Engineering (AE) firms in estimating BIM service fees, while also allowing government agencies to allocate budgets for the rendered BIM services. This research provides a method to estimate costs for BIM services based on the cost-plus pricing framework. The approach requires a generalized estimate of the man hour per floor area data to calculate the direct labor costs. Man-hour data were collected from forty five projects that have implemented BIM. Interpolation of the man-hours was performed to develop a general reference table for 'Type 2' (i.e., public schools and office buildings, etc.) projects. By providing an objective approach for estimating the costs of BIM services, it allows clients and AE firms to agree upon a fair cost for BIM related services, and thus expedite its adoption in Korea.

  • PDF

A Multi-level Longitudinal Analysis of the Land Price Determinants (지가형성요인의 다수준 종단 분석)

  • Lee, Chang Ro;Park, Key Ho
    • Journal of the Korean Geographical Society
    • /
    • v.48 no.2
    • /
    • pp.272-287
    • /
    • 2013
  • This paper describes the importance of selecting explanatory variables(e.g. land price determinants) in hedonic pricing models employed in predicting real estate price, and explores dynamics of the land price determinants over time. The City of Junju was chosen as the study area, and repeated measured price data of standard lots over 17 years were analyzed. We applied a three-level modeling approach to this data in consideration of its nested data structure and longitudinal characteristics. Main land price determinants we focused on are primarily based on items included in the standard comparison table of land price, which is an official hedonic pricing model used by Government to estimate land price for tax levy. Our result shows that the land price fluctuation over 17 years was not uniform over the whole study area with each neighborhood revealing different price trend, and as such warrants longitudinal model components. In addition, some of determinants previously recognized as important were proved insignificant. It was also found that significant determinants at a particular time point lost its power gradually over time and vice versa. It is expected that more accurate prediction of price would be possible when taken account for this dynamics of price determinants over time in applying hedonic pricing model method.

  • PDF

Estimating WTP for the reduction of disamenity in the Seoul Metropolitan Area Landfill site using the Hedonic Pricing Model (헤도닉가격모형을 이용한 수도권매립지 유발 비효용(disamenity) 감소에 대한 지불의사액 추정)

  • Kang, Heechan
    • Environmental and Resource Economics Review
    • /
    • v.29 no.3
    • /
    • pp.335-362
    • /
    • 2020
  • Using the Hedonic pricing model using Box-Cox transformation, this paper estimated the marginal effect (implicit price) of odors from landfill in the metropolitan area on housing prices and the willingness to pay for changes in certain odor conditions. This paper utilized the proximity from the landfill in the metropolitan area as a environmental variable, and analyzed the effect of various housing characteristic variables on the sale price of apartments within a radius of 5 km from the landfill. In particular, because odors factor have various heterogeneity, we applied hedonic price models instead of stated-preference methods with various types of functional forms through Box-Cox transformation, considering the heterogeneity of each region. Estimates show that the marginal value (implicit price) for the distance from the odor source was 0.227 to 0.533 depending on the function type of the estimated model. In addition, when other house factors are the same, the marginal willingness to pay for a distance of 1km from the odor source was calculated to be 16.79 to 51.76 thousand dollar depending on the type of function. Finally for the general Box-Cox model, the annual WTP was estimated to be 3,229dollar.

An Extended Benefit-Cost Analysis of Land Consolidation and On-farm Development Project -With Respect to Jigok Land Consolidation and On-farm Development Project in Seosan, Chungnam Province, Korea- (경지정리사업의 확장편익-비용분석 - 충남서산시 지곡지구를 중심으로 -)

  • Lim, Jae-Hwan;Lee, Min-Soo
    • Korean Journal of Agricultural Science
    • /
    • v.29 no.1
    • /
    • pp.66-83
    • /
    • 2002
  • The economic feasibility analysis including benefit-cost ratio and internal rate of return of a land consolidation and on-farm development project was mainly depended upon the direct benefits and costs arising during project life. Therefore the projects were neglected in allocating the government's financial funds and loans on account of the low economic rate of return of the project. Accordingly the extended benefit-cost analysis method should be introduced and adapted to cover not only the benefit s such as non-market values of environmental and food security fun ct ions of the project but also market values of the project outputs. The main purposes of this study are (1) to prepare a guide line for economic feasibility analysis based on the IBRD and ADB guidelines, (2) to estimate the benefits from productivity increase, labor saving, savings of O&M cost of farm mechanization and project facilities, savings of farmer's burden for their public health, increasing environmental and public functional value of paddy fields, improving food security condition and formation of peaceful and uncontroversial rural society by implementing the land consolidation and on-farm development, (3) to introduce the newly adapted analytical method as the extended benefit cost analysis which could make possible to be included the values of non-market goods such as the food security and the environmental public function of paddy fields. To carry out this study, the existing publications on the guidelines for economic agricultural projects were reviewed and consultation was made with a For the post evaluation study of the land consolidation and on-farm development project, field survey in Jigok and other comparative area were made to get available information. According to the project completion report, Jigok land consolidation and on-farm development project has 55ha of benefit area out of 69ha of gross area. The project was started in November 11th, 2000 and completed october 30th, 2001. The total project costs were amounted to 2,548 million won and the annual project benefits were estimated at 335million won evaluated by domestic market prices. The ERR(Economic Rate of Return) and SRR(Social Rate of Return) of the project based on the shadow pricing system were estimated at 4.4% and 16% respectively. On the other hand, the ERR and SRR based on the domestic market value system were amounted to 6.37% and 14.62%. In conclusion, Korean land consolidation and on-farm development projects have not carried out from the view point of economic rate of return under shadow pricing system but from the view point of domestic pricing system. For the future feasibility studies on land consolidation projects have to be carried out including the non-market values as environmental and food security function of the projects.

  • PDF

A Literature Survey on Warranty Policies

  • Suh, Young-Sung;Park, Young-Taek;Son, Eun-Il
    • Journal of Korean Society for Quality Management
    • /
    • v.24 no.2
    • /
    • pp.102-112
    • /
    • 1996
  • Estimation of warranty costs is an important application area of reliability engineering. On the manufacturer's point of view, exact estimation of warranty costs helps decisions on budgeting, product pricing, and A/S capacity planning, etc. We reviewed the state-of-the-art of existing models on warranty policies and suggested some future research directions.

  • PDF

THE EFFECT OF LEED CERTIFIED BUILDING ON THE SURROUNDING NEIGHBORHOOD IN NEW YORK CITY

  • Min Jae Suh;Annie R. Pearce;Young Hoon Kwak
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.28-35
    • /
    • 2013
  • The construction industry has introduced the Leadership in Energy and Environmental Design (LEED) rating system to promote objective evaluations of the sustainability of buildings. Three important values to consider when implementing sustainability are the associated environmental, social, and economic impacts. Recently, researchers have begun to investigate the real estate value of LEED certified buildings in terms of the rental cost, occupancy rate, cost per unit area, and resale value in order to better understand the economic benefits of the LEED rating system. However, the economic benefits also encompass economic effects such as the impact of LEED certified buildings on neighborhood real estate values surrounding the certified buildings. This research examines whether the enhanced real estate value of LEED certified buildings in New York City extends to surrounding commercial buildings, utilizing spatial analysis via a Geographic Information System (GIS) and the hedonic pricing method to derive meaningful economic relationships. The results provide practical insights into the economic effect of LEED certified buildings that will be of interest to city officials and planners, as well as the owners, developers, investors and other stakeholders of surrounding buildings.

  • PDF

A Study on Improving Pricing Criteria for Post-Construction Evaluation (건설공사 사후평가 용역대가기준 개선방안)

  • Kim, Seok;Lee, Du-Heon;Park, Jae-Woo
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.8
    • /
    • pp.661-670
    • /
    • 2016
  • In 2000, post-construction evaluation was introduced for the purposes to evaluate demand, cost, and construction period of public construction projects and to reduce errors of public order agencies. However, pricing guide of post-construction evaluation has not been established, which becomes a cause of quality degradation of post-construction service and conflict occurrence. This study suggests the pricing guide in the form of percentage of construction cost method and cost plus fee method based on data of post-construction evaluation. This study investigates the construction costs and service costs for post-construction evaluation and conducts the comparative analysis of 'percentage of construction cost method' and 'cost plus fee method.' The analysis result shows 'cost plus fee method' is more accuracy than 'percentage of construction cost method.' In particular, cost plus fee method includes various correction coefficients, such as distance, area, and integration, in order to reflect the project characteristics of each infrastructure, and suggests linear construction (roads, railways), nonlinear construction I (housing and industry complex), and nonlinear construction II (airports, seaports, dams, water and sewage).