• Title/Summary/Keyword: Architect

Search Result 844, Processing Time 0.026 seconds

Rooting-Potential of Sod by Transplanting Time and Turfgrass Species (이식 시기와 초종에 따른 잔디뿌리의 활착력)

  • 주영규;김덕환;이성호;이정호
    • Asian Journal of Turfgrass Science
    • /
    • v.17 no.2_3
    • /
    • pp.67-73
    • /
    • 2003
  • A series of studies was conducted during 2 years to investigate the effect of transplanting time and turfgrass species on turf establishment rate of sod for 2002 World Cup Soccer ground construction. The required period of rooting and turf growth for acceptable soccer playing quality on transplanted sod from nursery was tested to collect data for the project authorities of hosting cities and construction companies who were involved in World Cup stadium project. Transplanting time significantly affects on rooting-potential of sod on cool season grass and zoysiagrass, but those effects differently showed by turfgrass species. The enough nursing period for the ground established by Zousiagrass should be secured with proper transplanting time. And the thermal insulation on the turf canopy with other maintenance during Winter should improve the early rooting on zoysiagrass. The sod contained Kentucky bluegrass (85%+15% perennial ryegrass, seed wt. basis) showed relatively slow at the early growth and rooting-potential of root, but the potential resulted higher than that of perennial ryegrass turf (85%+15% Kentucky) under longer nursing period. Kentucky bluegrass has one of the most strong resistance against environmental stresses, but intensive maintenance practise should be required when the turf transplanted during summer season. Higher mixture rate of perennial ryegrass sod has a rapid root growth compare with other turfgrass species. The rate provided a benefit to an early establishment of turf ground followed by a proper maintenance practise. For the completion of World Cup soccer ground construction for 2002, the most suitable time for sod transplanting in 2001 was March to May or mid Sept. to early Oct. by delayed architect construction schedule.

Estimating the Reliability of Water Distribution Systems Using HSPDA Model and Distance Measure Method (HSPDA모형과 거리척도방법을 이용한 상수관망의 신뢰성분석)

  • Baek, Chun-Woo;Jun, Hwan-Don;Kim, Joong-Hoon
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.9
    • /
    • pp.769-780
    • /
    • 2010
  • Topological and hydraulic assessments to examine whether required demand and pressure are satisfied and using these assessed results as a criteria have been general methodology for reliability assessment of water distribution systems. However, many of existing studies that used nodal pressure calculated by hydraulic assessment for reliability assessment have two major issues to be solved. The one is that demand-driven analysis was used for hydraulic assessment and the other is that serviceability was not considered for reliability assessment. In addition, all of the studies used pressure-demand analysis which is suitable to hydraulic analysis for water distribution systems under abnormal operating condition considered only available nodal demand for reliability assessment. This means that advantages which can be obtained by pressure-driven analysis are not used properly and efficiently. In this study, new methodology for reliability assessment of water distribution systems using HSPDA model and distance measure method is suggested. This methodology considers both nodal pressure and nodal available demand for reliability assessment. Suggested methodology is applied to two water distribution systems to show its applicability and application results are compared with existing study.

Monitoring Vegetation Changes after Constructing the Vegetation-mat Measures for Greening in Embankment - A Case Study of Tancheon, Seongnam - (호안 녹화용 매트 시공 후 식생변화 모니터링 - 성남시 탄천을 중심으로 -)

  • Lee, Soo-Dong;Kang, Hyun-Kyung;Jang, Han-Sol
    • Korean Journal of Environment and Ecology
    • /
    • v.24 no.3
    • /
    • pp.302-317
    • /
    • 2010
  • In this study, not only to present the management plan but also to verify the effectiveness for a area of improving the landscape and the area of creating the base of bio-inhabitation in Tancheon stream concrete embankment where were practised the vegetation-mat measures for greening via monitoring i.e. restoration progress. The results of monitoring, there were a total of 41 taxa, 18 families, 38 species, 3 varieties in 2006, moreover in the 2007, there were a total of 59 taxa, 19 families, 56 species, 3 varieties and in the period 2008, 64 taxa, 29 families, 59 species, 8 varieties. Therefore, these site has increased the plant spaces year by year. The distribution of vegetation characteristics shows that Miscanthus sacchariflorus and Pennisetum alopecuroides expands their influence in the area of applying the construction method. Those area appears a diversity of native species by the stream deposition at the flood. Thus, its condition is very soundly ecological health and eco-friend. At present, native species have been dominant, however, disturbed species and invasive species can be expected to increase dramatically in the future. Therefore, it is necessary to a long-range monitoring and management for maintaining an environmentally sound aquatic ecosystem. On this area refer to mix the river vegetation of primary succession and disturbed vegetation. For that reason, the method of constructing the vegetation-mat measures for greening in embankment does not need to remove the concrete and can install a coir-mat on the top. It leads to improve the landscape, moreover, it was analysed the such dramatic changes in the vegetation species richness by providing continuous the plant growth basis have a impact on in bio-diversity.

The Economic Comparision through LCC Analysis on each Graded Alternatives for Green Remodeling of Public Building (공공건축물의 그린리모델링 수준별 LCC (Life Cycle Cost) 분석을 통한 경제성 비교)

  • Kim, Jaemoon;Lee, Junghyuk;Lee, Duhwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.38-49
    • /
    • 2018
  • Since the ratification of the Paris Agreement (COP21), the government is continuously strengthening policies for the reduction of greenhouse gas of the construction industry in accordance with the growing importance of reducing greenhouse gas and obligation of the government. Especially, the government emphasizes the need to improve the energy performance of old public buildings. Since 2014, the government is running a pilot project in which the government supports the construction cost of the green remodeling project of old public buildings and it is intended to develop the best practice of green remodeling and activate the green remodeling in the private sector. In this study, we analyzed the economical efficiency of the old public buildings by each level through green remodeling and conducted building related investigation and equipment measurement to plan the alternatives of the corresponding buildings. The improvement plan is a green remodeling plan that integrates alternatives. Five improvement plans were developed for each level to analyze the economic feasibility of each plan. As for the analysis method, the first energy demand amount calculation and the LCC analysis were performed through ECO2. In the LCC aspect, the improved 3/4 plan (middle level plan) was the most excellent and results were obtained in the order of the highest cost plan followed by the lowest cost plan. As a result, it is expected that it can be utilized as a basic data for future green remodeling performance plan and economic feasibility analysis in the future.

Improvement of Construction Management System in Public Construction Projects - Focused on the Total Project Cost Management Guidelines - (공공 건설사업의 효율적 건설사업관리수행을 위한 제도개선방안 - 총사업비관리지침을 중심으로 -)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.3-11
    • /
    • 2020
  • In large public construction projects with a certain size or larger that need to be carried out over a number of years, the Authority must secure a budget for construction project management activities by the construction manager. There is no problem if the project management budget secured by the issuing Authority and the project management budget executed by the issuing Authority are the same, but if not, various problems will arise. Therefore, in this study, the following measures were proposed to improve the system for efficient operation of construction project management: First, the construction project management terms and tasks specified in the statutes and the guidelines of government agencies should be unified and the standard for calculating consideration should be unified. Second, the total project cost management guideline should be specified so that the missing construction project manager can receive compensation for the technical proposal. Third, if the project cost is changed in the long-term continuous construction project, the construction project management expense should be adjusted accordingly. Fourth, if construction project management service is required from the Authority, the basis for consignment to a specialized institution should be specified in the total project cost management guideline.

A Study on the Architectural Design Utility of Object-based CAD System (객체기반 CAD 시스템의 건축설계적 효용에 관한 연구)

  • Yoo, Chang-Geun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.2 no.1
    • /
    • pp.9-15
    • /
    • 2002
  • As architectural forms tend to be large-scaled, high-storied and complicated, use of computer for processing design information has been generalized. However, CAD use in the process of developing architectural design has been neglected greatly in the educational field of architectural field due to the surging of recognition that it may limit the essential property of architectural design. It may be resulted from the limitation of CAD system, that is, it is because of tardy speed of application development for the related areas with the lack of simplicity and clarity of flexibility to be secured on the drawing and user interface. Recent CAD systems, however, overcome such a limitation, convert into object-based design from entity-based drawing, drafting and modeling for implementing design concept of architects and it connects with internet linked to superspeed information communication network and changes process and stream of architectural design. Therefore, this study deals with utility of object based CAD system with products of Autodesk Co. and consequently obtain the following conclusions. First, it expands architect's design areas by supporting cooperative design system based on model-based architectural design and internet. Second, it reduces consumption of personal and material resources and time in the process of drawing production for improving architectural design works. Third, it can reduce the frequent design changes by improving understanding of architectural space with visualization of immediate 3D information, escaping from traditional methods to deliver design information to building owner through 2D drawing or model and perspective drawing requiring much cost and time. Fourth, it keeps exactness without omission or duplication of design information and generate and renew information of all related drawings on a drawing. Fifth, it is possible to change difficult and boring architectural design work into a pleasure owing to immediate modeling and drawing of design idea. In addition, digital drawing generated by using object-based CAD system can playa role of establishing Urban Information System to be used for protecting from building in disaster and urban disasters in connection with GIS numerical map and be used for reference of all kinds of information required fro post-management of buildings. However, what is more important is that surplus time from introduction of object-based CAD system should be used for consideration to be recognized as a good space and building built as a product of this project for comfort to urban people.

  • PDF

The Discipline of the Dom-ino Frame and the Regulating Line - A Study of Le Corbusier's Villa La Roche-Jeanneret and Villa Stein-de Monzie - (르 꼬르뷔제 건축에서 돔-이노 프레임과 규준선의 기율 - 라 로쉬-잔느레 주택과 가르쉬 주택을 중심으로 -)

  • Pai, Hyung-Min;Hyun, Myung-Seok
    • Journal of architectural history
    • /
    • v.12 no.1 s.33
    • /
    • pp.25-41
    • /
    • 2003
  • This paper is a study of Le Corbusier's trace regulateur of the 1920s, particularly its role in the design of the Villas La Roche-Jeanneret and Stein-de Monzie. It proceeds on the basis of the following three themes: first, the relation between the regulating line and the dom-ino frame; second, its status as a proportional device based not on a module system but one that defines relations; third, its function as an essential practical device in the design process. In the Villa La Roche-Jeanneret, the embedded horizontal planes of the dom-ino frame were constant, but the vortical lines of the columns were altered according to the changes in plan. Initially, a left-hand bay window formed a symmetry with the right-hand bay window, the only constant in the design process. With subsequent changes, mullion sections of the horizontal window and roof elements came to provide the reference points for the regulating line. Eventually, a regulating line different from the one that controlled the bay window and the elongated volume came to control the entrance hall of Villa La Roche, resulting in three different kinds of regulating lines in the final version. In contrast to the Villa La Roche-Jeanneret, a singular and consistent regulation line was anticipated in the earliest design stages of the Villa Stein-de Monzie. The repetition of its A:B grid and the standard $2.5m{\times}1.0m$ sliding window determined the proportions of both its plan and elevation, and thus the regulating line became 'automatic,' losing its viability as a practical tool. Though the regulating titles of the La Roche-Jeanneret look as if they were an afterthought, drawn after the design was complete, they were most active, requiring tenacity and discipline in their application. On the other hand, the seemingly 'redundant' regulating line of the Villa Stein-de Monzie gains its raison d'etre from the dom-ino frame. Its cantilevers and uninterrupted horizontal window could be used in decisive fashion because of the guarantee that the correct proportion would always be maintained. Thus we discover that Le Corbusier's discipline of the 1920s had a certain spectrum of flexibility. His 'parti' ranged from the extremely loose and malleable grid of the Villa La Roche-Jeanneret to the fixed grid of the Villa Stein-de Monzie. In different ways, these projects retain the tension between the dom-ino frame and the regulating line. For Le Corbusier, as much as the grid was an object with fixed attributes, it was also an active medium manipulated by the will of the architect.

  • PDF

A Study on the Next VWorld System Architecture: New Technology Analysis for the Optimal Architecture Design (차세대 브이월드 시스템 아키텍처 구성에 관한 연구: 최적의 아키텍처 설계를 위한 신기술 분석)

  • Go, Jun Hee;Lim, Yong Hwa;Kim, Min Soo;Jang, In Sung
    • Spatial Information Research
    • /
    • v.23 no.4
    • /
    • pp.13-22
    • /
    • 2015
  • There has been much interest in the VWorld open platform with the addition of a variety of contents or services such as 2D map, 3D terrain, 3D buildings, and thematic map since 2012. However, the VWorld system architecture was not stable for the system overload. For example, the system was stopped due to the rapidly increasing user accesses when the 3D terrain service of the North Korea and the Baekdu mountain was launched at September 2012 and September 2013, respectively. It was because the system architect has just extended the server system and the network bandwidth whenever the rapid increase of user accesses occurs or new service starts. Therefore, this study proposes a new VWorld system architecture that can reliably serve the huge volume of National Spatial Data by applying the new technologies such as CDN, visualization and clustering. Finally, it is expected that the results of this study can be used as a basis for the next VWorld system architecture being capable of a huge volume of spatial data and users.

Curved Screen Display Immersion Simulation System for Landscape Evaluation (경관평가를 위한 곡면스크린 방식의 몰입형 시뮬레이션 시스템)

  • Chang, Jong-Hyun;Kim, Choong-Sik;Lee, In-Sung
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.3
    • /
    • pp.61-68
    • /
    • 2009
  • The objective of this study was to examine the possibility of utilizing the immersion stereoscopic image with a curved-screen-display as a tool for evaluating the landscape. The curved-screen-display ensures the continuity of the image and can be simultaneously evaluated by many people. Fifty-meter-wide Gangnamdaero Boulevard in Seoul was selected for this study, and the simulation was done using computer graphics. With the computer simulation, a questionnaire on landscape preferences was conducted according to different visual environments (immersion, non-immersion) and different projection types(stereoscopic or plane image). In the results of this study, the landscape preference was largely dependent on the immersion environment. Using the immersion-type simulation, the observer can easily evaluate the preference with higher judgment power. The stereoscope or plane projection type does not have any significant result in terms of its judgment power. This result implies that it is very important to strengthen the sense of immersion by expanding the screen into an angled view in which the observer can become immersed while making and projecting the simulation to evaluate the landscape. As a landscape evaluation tool for examining the efficiency and usefulness of immersion simulation, this study has limitations in that it controls many factors in street landscape that adversely affect judgment. Accordingly, a detailed comparison and verification of the stereoscopic image in various environments, including street width and building height ratio, must be conducted.

Chronological Studies on Residents' Appreciation of Outdoor Space in Apartment Complexes and It's Changes - Case Study of Apartment Complexes in the Daejeon Metropolis - (연대별 아파트 단지 옥외공간의 변화와 주민인식비교 - 대전광역시 아파트 단지를 대상으로 -)

  • Kim Dae-Hyun;Park Chang-Sug;Park Chun-Sug;Joo Shin-Ha;Shin Ji-Hoon;Byeon Jae-Sang
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.33 no.3 s.110
    • /
    • pp.31-42
    • /
    • 2005
  • Much has been made of the changes over time to apartment complexes during the era of rapid development in Korea. This study aimed at analyzing the chronological changes since the 1970s in the laws and regulations governing outdoor space and the residents' appreciation of outdoor space in Daejeon's apartment complexes. The results of this study can be summarized as follows: 1. Similar changes can be found throughout Daejeon's apartment complexes. As time has passed, the building-to-land ratio and the floor-to-land ratio have deceased. The high density trend of apartment complexes has continued until very recently. 2. Although residents' satisfaction with outdoor space around apartments has improved, land for athletic and commercial spaces still remains at its lowest level. Therefore, these kinds of spaces need improvement. 3. Comparing the characteristics of outdoor space in apartment complexes from the 1980s to present indicates that current apartment residents are much more satisfied with the outdoor space, but are conscious of the lack of adequate facilities for the elderly and the handicapped people, and of the hiか density of their apartment complexes. Therefore, these essential consciousness should also be further improved. 4. The residents are gradually becoming aware of changes to the outdoor space that have occurred over time in the apartment complexes, such as in the areas allowed to parking, pedestrians, and athletics. 5. These chronological changes relate to the residents' interest in the changes that have occurred to the outdoor space, especially the convenience of parking, the color of the buildings, the form of the buildings, and the shape of the roofs.