• Title/Summary/Keyword: Approximate Calculation

Search Result 260, Processing Time 0.027 seconds

A Research on the Approximate Formulae for the Speed Loss at Sea (해상에서의 선속 손실량 산정을 위한 약산식 개발 연구)

  • KWON YOUNG-JOONG;KIM DAI YOUNG
    • Journal of Ocean Engineering and Technology
    • /
    • v.19 no.2 s.63
    • /
    • pp.90-93
    • /
    • 2005
  • An improved approximate formula is presented for Series 60 forms, modifying the approximate formula, developed by the Author in 1983. The weather formula is based on interpretations of detailed calculations of speed loss, due to wind(van Berlekom), motions(Maruo), and wave reflection resistance(Kwon). Comparison is made between the result of the approximate formula and the one of detailed calculation. The result of the formula is also compared with some published full-scale data for speed loss.

Compressed Sensing Techniques for Video Transmission of Multi-Copter (멀티콥터 영상 전송을 위한 압축 센싱 기법)

  • Jung, Kuk Hyun;Lee, Sun Yui;Lee, Sang Hwa;Kim, Jin Young
    • Journal of Satellite, Information and Communications
    • /
    • v.9 no.2
    • /
    • pp.63-68
    • /
    • 2014
  • This paper proposed a novel compressed sensing (CS) technique for an efficient video transmission of multi-copter. The proposed scheme is focused on reduction of the amount of data based on CS technology. First, we describe basic principle of Spectrum sensing. And then we compare AMP(Approximate Message Passing) with CoSaMP(Compressive Sampling Matched Pursuit) through mathematical analysis and simulation results. They are evaluated in terms of calculation time and complexity, then the promising algorithm is suggestd for multicopter operation. The result of experiment in this paper shows that AMP algorithm is more efficient than CoSaMP algorithm when it comes to calculation time and image error probability.

Calculation of the Dipole Moments for Trigonal Bipyramidal Complexes (Trigonal Bipyramid 구조를 갖는 착물의 쌍극자모멘트의 계산)

  • Sangwoon Ahn;Ja Hong Kim;Kee Hag Lee;Gap Choul Shin
    • Journal of the Korean Chemical Society
    • /
    • v.26 no.1
    • /
    • pp.18-23
    • /
    • 1982
  • A new method for calculation of the the dipole moments for trigonal bipyramidal complexes has been developed in this work. Illustrative calculations are performed on a few trigonal bipyramidal complexes with the approximate molecular orbital and the valence bond method. The calculated values of the dipole moments by the approximate molecular orbital method are very close to the experimental values. The calculated dipole moments may be used to predict the geometric structure of trigonal bipyramidal complexes.

  • PDF

A B-spline based Branch & Bound Algorithm for Global Optimization (전역 최적화를 위한 B-스플라인 기반의 Branch & Bound알고리즘)

  • Park, Sang-Kun
    • Korean Journal of Computational Design and Engineering
    • /
    • v.15 no.1
    • /
    • pp.24-32
    • /
    • 2010
  • This paper introduces a B-spline based branch & bound algorithm for global optimization. The branch & bound is a well-known algorithm paradigm for global optimization, of which key components are the subdivision scheme and the bound calculation scheme. For this, we consider the B-spline hypervolume to approximate an objective function defined in a design space. This model enables us to subdivide the design space, and to compute the upper & lower bound of each subspace where the bound calculation is based on the LHS sampling points. We also describe a search tree to represent the searching process for optimal solution, and explain iteration steps and some conditions necessary to carry out the algorithm. Finally, the performance of the proposed algorithm is examined on some test problems which would cover most difficulties faced in global optimization area. It shows that the proposed algorithm is complete algorithm not using heuristics, provides an approximate global solution within prescribed tolerances, and has the good possibility for large scale NP-hard optimization.

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

Development of Automation Technology for Structural Members Quantity Calculation through 2D Drawing Recognition (2D 도면 인식을 통한 부재 물량 산출 자동화 기술 개발)

  • Sunwoo, Hyo-Bin;Choi, Go-Hoon;Heo, Seok-Jae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.227-228
    • /
    • 2022
  • In order to achieve the goal of cost management, which is one of the three major management goals of building production, this paper introduces an approximate cost estimating automation technology in the design stage as the importance of predicting construction costs increases. BIM is used for accurate estimating, and the quantity of structural members and finishing materials is calculated by creating a 3D model of the actual building. However, only 2D basic design drawings are provided when making an estimating. Therefore, for accurate quantity calculation, digitization of 2D drawings is required. Therefore, this research calculates the quantity of concrete structural members by calculating the area for the recognition area through 2D drawing recognition technology incorporating computer vision. It is judged that the development technology of this research can be used as an important decision-making tool when predicting the construction cost in the design stage. In addition, it is expected that 3D modeling automation and 3D structural analysis will be possible through the digitization of 2D drawings.

  • PDF

Approximate Calculation of Order Fill Rate under Purchase Dependence (구매종속성을 고려한 주문충족률의 근사적 계산)

  • Park, Changkyu
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.4
    • /
    • pp.137-146
    • /
    • 2017
  • For the competitive business environment under purchase dependence, this paper proposes a new approximate calculation of order fill rate which is a probability of satisfying a customer order immediately using the existing inventory. Purchase dependence is different to demand dependence. Purchase dependence treats the purchase behavior of customers, while demand dependence considers demand correlation between items, between regions, or over time. Purchase dependence can be observed in such areas as marketing, manufacturing systems, and distribution systems. Traditional computational methods have a difficulty of the curse of dimensionality for the large cases, when deriving the stationary joint distribution which is utilized to calculate the order fill rate. In order to escape the curse of dimensionality and protect the solution from diverging for the large cases, we develop a greedy iterative search algorithm based on the Gauss-Seidel method. We show that the greedy iterative search algorithm is a dependable algorithm to derive the stationary joint distribution of on-hand inventories in the retailer system by conducting a comparison analysis of a greedy iterative search algorithm with the simulation. In addition, we present some managerial insights such as : (1) The upper bound of order fill rate can be calculated by the one-item pure system, while the lower bound can be provided by the pure system that consists of all items; (2) As the degree of purchase dependence declines while other conditions remain same, it is observed that the difference between the lower and upper bounds reduces, the order fill rate increases, and the order fill rate gets closer to the upper bound.

A numerical study of the performance of a turbomolecular pump (터보분자펌프의 성능해석에 관한 수치해석적 연구)

  • Hwang, Yeong-Gyu;Heo, Jung-Sik
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.20 no.11
    • /
    • pp.3620-3629
    • /
    • 1996
  • In the free molecular flow range, the pumping performance of a turbomolecular pump has been predicted by calculation of the transmission probability which employs the integral method and the test particle Monte-Carlo method. Also, new approximate method combining the double stage solutions, so called double-approximation, is presented here. The calculated values of transmission probability for the single stage agree quantitatively with the previous known numerical results. For a six-stage pump, the Monte-Carlo method is employed to calculate the overall transmission probability for the entire set of blade rows. When the results of the approximate method combining the single stage solutions are compared with those of the Monte-Carlo method at dimensionless blade velocity ratio C=0.4, the previous known approximate method overestimates as much as 34% than does the Monte-Carlo method. But, the new approximate method gives more accurate results, whose relative error is 10% compared to the Monte-Carlo method, than does the previous approximate method.

Hardware Implementation on the Weight Calculation of Iterative Algorithm for CT Image Reconstruction

  • Cao, Xixin;Ma, Kaisheng;Lian, Renchun;Zhang, Qihui
    • ETRI Journal
    • /
    • v.35 no.5
    • /
    • pp.931-934
    • /
    • 2013
  • The weight calculation in an iterative algorithm is the most computationally costly task in computed tomography image reconstruction. In this letter, a fast algorithm to speed up the weight calculation is proposed. The classic square pixel rotation approximate calculation method for computing the weights in the iterative algorithm is first analyzed and then improved by replacing the square pixel model with a circular pixel model and the square rotation approximation with a segmentation method of a circular area. Software simulation and hardware implementation results show that our proposed scheme can not only improve the definition of the reconstructed image but also accelerate the reconstruction.