• Title/Summary/Keyword: Apartment Construction Project

Search Result 269, Processing Time 0.023 seconds

North Korean Housing Planning Trend through Analysis on North Korean Architectural Media (북한 건축 전문매체 분석을 통한 살림집 계획 동향)

  • Choi, Sang-Hee
    • Land and Housing Review
    • /
    • v.8 no.4
    • /
    • pp.223-232
    • /
    • 2017
  • The purpose of this study is to identify the supply status and planning trend of North Korean housing through analysis on the North Korean architecture specialized media data. The flat composition is changing and the living room is becoming the center of the houses. Also, in the urban areas, the standard apartment type is four apartments in a row and the plan form is getting diversified into circle type, Y type, and irregular type. On the other hand, in the rural areas, two houses in a row and single house are typical and the change in planning scale and space structure are not substantial. Since the 2000s, design changes have been made to emphasize the third dimensional structure of buildings such as the elliptical houses and L-shaped houses. Furthermore, 8~10 households are located on one floor which leads to the tendency of the building enlargement. In terms of house size, a square concept was introduced to replace the initial 2~3 room concept and the basic module of the room planning the 3 room house based on $3m{\times}3m$. However, there seems to be no standard house size, and the house size may differ depending on the social classandregion. In the early 1980s, when there was focus on the apartment complex construction, the high-rise apartment buildings of 30~40 floors was planned. However, during the Pyongyang redevelopment project, apartments of more or less than 10 floors were built and row-houses of more or less than 4 floors were built. In terms of the complex scale, a lot of small complexes of around 300 households are emerging after 2010. The construction projects are mainly limited to specific regions such as Pyongyang and Samjiyeon, and also limited to specific classes such as the workers and soldiers initially and the scientists lately. In addition, living boundary composition and ancillary facilities for sufficient green area ratio securement and the people of North Korea are maintained consistently. In recent years, the specialized floor planning such as solar house and the house for the disabled people, framework houses for redevelopment business, and multi-storied house construction technology are also emerging.

TACT Scheduling & Monitoring of Apartment Finish Works based on the BDM Technique (BDM기법을 적용한 공동주택 마감공사 TACT공정계획 수립 및 운영)

  • Kim, Seon-Gyoo;Yoo, Jae-Woo;Kim, Dong-Sub;Park, Jong-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.3-11
    • /
    • 2014
  • As the recent construction projects have been carried out as a mixed-use complex project that includes architecture, civil, mechanical, electrical, and landscape, as well as become bigger and high-rise with the increased repetitive works, the TACT technique has received more attention as an effective method for achieving a target completion date by securing the continuous works. Although the TACT technique can maintain a steady flow without the interruption of works in order to utilize the resources of the repetitive works, it can not be considered as the systematic scheduling technique because the schedule computations are not possible as well as a critical path can not be recognized. This paper proposes the applicabilities of scheduling and monitoring the TACT schedule by the BDM technique as comparing and analyzing the methodologies for apartment finish works by the Excel, the Primavera(P6) based on the PDM technique, and the Beeliner based on the BDM technique that is a new networking technique, respectively.

Relationship Between Construction Productivity and the Weather Elements in the Reinforced Concrete Structure for the High-rise Apartment Buildings (기후요소와 생산성간의 상관관계 분석에 관한 연구 - 공동주택 철근콘크리트 골조공사를 중심으로 -)

  • Kim Shin-Tae;Kim Yea-Sang;Chin Sang-yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.80-89
    • /
    • 2004
  • Among the various factors influencing construction productivity, weather conditions or elements become very important factors in planning and executing construction project. It is especially true in Korea where the weather changes dramatically through few seasons. In this study, relationship between construction productivity of the reinforced concrete structure we for the high-rise apartment buildings and 5 weather elements including temperature, humidity, day time, rainfall, and wind velocity have been analyzed The results trough regression analysis showed that weather elements explain $58.8\%$ of productivity in total and temperature and day time were more important factors among them.

COST ESTIMATE AT EARLY STAGE USING CASE-BASED REASONING

  • Kihoon Seong;Moonseo Park;Hyun-Soo Lee;Sae-Hyun Ji
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.883-889
    • /
    • 2009
  • The importance of cost estimate in early stage such has been increasing due to market change and severe competition in construction industry. Because the adjustable budget is only 20% after design stage, most of the crucial decisions to influence cost is made in the early stage. However, in the early stage, the project scope is not defined completely so that estimator has inaccurate information to make critical decision. Therefore, this research suggests the cost estimate method using case-based reasoning. Case-based reasoning is appropriate for the early cost estimating, as it has the strength of rapidity and convenience in cost estimation. This research analyzes 84 actual data of public apartment on the scale of 11~15 stories. In order to extract the most similar case, at the first step this research identifies influence factors and calculates attribute similarity. In case-based reasoning, the most challenging task is determining attribute weight. At the third step, this research calculates case similarity which is aggregated attribute similarity multipled by attribute weight. Finally, extracts the most similar case which has the highest score of case similarity.

  • PDF

A Model of Time Dependent Design Value Engineering and Life Cycle Cost Analysis for Apartment Buildings (공동주택의 시간의존적 설계VE 및 LCC분석 모델)

  • Seo, Kwang-Jun;Choi, Mi-Ra;Shin, Nam-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.133-141
    • /
    • 2005
  • In the resent years, the importance of VE (value engineering) and LCC (life cycle cost) analysis for apartment building construction projects has been fully recognized. Accordingly theoretical models, guidelines, and supporting software systems were developed for the value engineering and life cycle cost analysis for construction management including large building systems. However, the level of consensus on VE and LCC analysis results is still low due to the lack of reliable data on maintenance. This paper presents time dependent LCC model based value analysis method for rational investment decision making and design alternative selection for construction of apartment building. The proposed method incorporates a time dependent LCC model and a performance evaluation technique by fuzzy logic theory to properly handle the uncertainties associated with statistics data and to analyze the value of alternatives more rationally. The presented time dependent VE and LCC analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to design value engineering alternative selection, the estimation of the life cycle cost, and the allocation of budget for apartment building construction projects.

A Study on Analysis and Improvement of the Process of Furniture Work for High-rise Residential Building (초고층주거건축의 가구공사 프로세스 분석 및 개선방안에 관한 연구)

  • Kim Hyun-Woo;Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.446-449
    • /
    • 2003
  • Recently, large residental buildings including high-rise apartment and a multi-business and commercial-residential building are appearing in the form of Korean construction work. According to this large-size trend a tenn and cost of construction works was largely increased. Therefore, studies of techniques construction management for successful project are lively being progressed. This study introduced Just-In-Time form and Lean Construction concept in order to establish management system of a house construction work taking up much portion on aspects of work scale and materials transportation in finishing works of high-rise residental building architecture. The process of house construction works will be analyzed with these two principles for productivity improvement and then the improvement plan will be suggested. This analysis and proposal can induce the flow of finishing works smoothly and contribute to success of project through saving of a tenn and cost of construction works.

  • PDF

The Foul Smelling from Sewer Pipe near Large Apartment Complexes and its Countermeasures II: The Cause for Foul Odors of Sewer Pipes in Residential Areas (대규모 아파트 단지주변 하수관로의 악취 발생과 대책 II: 주거지역 하수관로의 악취원인과 대책)

  • Lee, Jang-Hown;Kang, Seon-Hong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.21 no.5
    • /
    • pp.631-639
    • /
    • 2007
  • This study investigated the construction and operation status of sewer pipes and water-purifier tanks near densely populated areas like large apartment complexes, in order to find out cause for offensive orders. The study results revealed that the main cause arose from the water-purifier tank and public sewer pipes near ordinary residential areas. First, in case of independent water-purifier tanks, the air is forced into the rotten part of large tanks nearby which should be operated in an anaerobic state, so that the tank changes into an aerobic state, or dirty water, which is returned during the sludge return process, falls on the top of the rotten tank, preventing scum from forming within the tank. Such problems cause incompletely purified water in the purifier tank to be discharged, which in turn results in filthy water. Second, in case of public sewer pipes, deteriorated or aging pipes, or the mixture of rain water and dirty water by mixing up combined and separated sewers system can cause foul odors in residential areas. Therefore, offensive odors in residential areas can be radically reduced through the appropriate construction and management of facilities including water-purifier tanks. As well, if more separate sewers are installed as part of an improvement project for public sewer pipes, complaints about foul smell can be minimized.

The Case of the Accomplishment on the Architectural Value Engineering Competition;Focused on ' The New Construct Field Value Engineering of Apartment, A-14, Woonjeongjigu, Paju' (건설 VE 경진대회 수행사례;파주운정지구 A-14 블럭 아파트 건설공사를 중심으로)

  • Jeon, Chung-Keun;Min, Won-Jae;Ryu, Ik-Seon;Han, Min-Chul;Han, Cheon-Goo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1029-1032
    • /
    • 2007
  • This study enforced function analysis, achievements of ideas and valuations due to VE workshop about " the new construct field of apartment, A-14, Woonjeongjigu, Paju" as the project of a plan VE competition held by the Korea National Housing Corporation, For the results of the research, it was to enforce 163 works of function analysis, 333 items of creating ideas, and 193 achievements of ideas. Besides, VE was proposed about 46 works of increasing values and cost reduction for 103 works and 10,040,000,000 won.

  • PDF

Development of a Calculating Model for Local Index Based on Historical Data of Public Apartment Buildings (공공아파트 실적데이터 기반의 지역지수 산정 모델 개발)

  • Lim, Dae-Hee;Lee, Seung-Hoon;Seo, Yong-Chil
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.75-80
    • /
    • 2010
  • With the intensifying of price competition and structural diversifications, the uncertainty of the domestic housing market has been increased. This highlights the importance of the planning stage of construction projects, and the increased need for a higher level of accuracy in approximate estimates. Currently, a number of research and development programs to calculate construction cost at the initial planning stage are being conducted. However, there are few cases in which local characteristics are considered in deriving the results. If local calibration can be conducted during estimates, more accurate cost estimates will be enabled. This could also play a major role in ensuring the success of a project. Therefore, the purpose of this research is to develop a calculation methodology and a model for a local index based on the historical data of public apartment buildings, and to derive a local index that supports accurate construction cost estimates.

A Study on a Systematization of Preliminary Construction Control for the Quality and Schedule Management of APT Construction (품질확보 및 공기지연예방을 위한 공사관리 체계화에 관한 연구)

  • Park, Hong Tae;Lee, Yang Kyoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.347-353
    • /
    • 2008
  • Generally speaking, it is important to know the activities itself exactly and to control the activities correctly so as to assure timely progress and the quality of any project. In order to progress smoothly in accordance with construction schedule, it is important to systematize the preliminary arrangements necessary for each process and then manage them. In this study, in order to progress smoothly the quality and schedule management of the construction, we can be made systematically pre-works in accordance with construction schedule by the civil construction items of the apartment house construction. we suggested pre-construction control item by the workers through experiential method of construction engineers in accordance with network schedule.