• Title/Summary/Keyword: Apartment Construction Project

Search Result 272, Processing Time 0.029 seconds

The Change of Outdoor Space in Apartment Complex and Its Causes (아파트 단지 옥외공간 변천 및 요인 연구)

  • Kim, Dae-Hyun;Kim, Dae-Soo;Sin, Ji-Hoon;Kim, Soon-Boon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.6 s.107
    • /
    • pp.52-67
    • /
    • 2005
  • The purposes of this study were to classify the changing periods of apartment outdoor space in Korea and to clearly understand the specific characteristics of each period. The study has been done through on-site observation of apartment complexes, and through the analysis of housing estate planning techniques, rules and regulations affecting outdoor spaces during the rapidly developing era. The results of this study shows that three major periods with distinct characteristics were found, which were as follows: 1) The first well defined period spans from 1960 to 1990. In this period, apartment construction was rapid, and as a result, quality of housing environments were sacrificed. As little attention was given to the landscapes in apartment complex, they were constructed very simple and identical in outdoor space of apartment complex. This period can be referred to as the 'commonly universal period in apartment outdoor space'. 2) The second period spans from 1991 to 1996, during which time a housing construction project for two million residences was completed in order to significantly stimulate the provision of houses to the general public. As a result, regulations were relaxed causing housing environments to deteriorate. Although apartments were constructed very close together, there was some diversification and experimentation in outdoor styles. This period can be referred to as the 'congestion period of apartment outdoor space'. 3) The third period spans from 1997 to the present. During this time the number of unsold apartments has grown considerably throughout the country. Many different apartment complex marketing strategies have been employed to reduced the glut of unsold apartments. This experimental trend has continued and been well-received since the IMF period. The distinguishing characteristics of this period are the introduction of a rich natural landscape, the increase in communications among residents, the human oriented design, and the refined and elegant design for the outdoor street furnitures. As a result, this period can be named the "differentiation period of apartment outdoor space".

A Study on the Standard Joint Material and Reference Plane for the Standard of Construction in the Apartment (공동주택 시공표준화를 위한 조립기준면 및 표준마무리재에 관한 연구)

  • Lim, Seok-Ho;Park, Keun-Soo;Lee, Ga-Kyung
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.04a
    • /
    • pp.230-235
    • /
    • 2009
  • In our country, the application of the design method of face to face dimension in wall-slab apartment has passed 10 years. So MC design method has fixed in the design step to some degree. In Design and Work Execution of House the exclusive area of the apartment was calculated by face to face dimension. And the term of face to face dimension was known broadly to clients, construction company, etc. But design method of face to face dimension is not to simply extend the room size so far as wall depth in design process but to ensure the actual space should be considered with efficient use and assembly of building components. That is to say, Design method of face to face dimension is not to be defined by design step but to be related with construction and maintenance. However in construction process the point of face to face design method was not understood even now. So the purpose of this study was to extract the effect and question of face to face design method in construction process by survey of actual condition of structure and construction quality, and compare this result with existing construction method. The following project of this study is to survey of actual condition of interior components such as gypsum board, windows & doors etc. Therefore this study is to induce architectural long-life through architectural standardization construction and component's exchange, and, by the subject of the study on Apartment to have design guideline and basis for joining part between Gypsumboard and windows.

  • PDF

A Study on the Standard Joint Material and Reference Plane for the Standard of Construction in the Apartment - Joining Part between Gypsumboard and Windows - (공동주택 시공표준화를 위한 조립기준면 및 표준마무리재에 관한 연구 - 석고보드 마감재와 창호재의 접합부위를 중심으로 -)

  • Lim, Seok-Ho;Park, Keun-Soo;Lee, Ga-Kyung
    • Journal of the Korean housing association
    • /
    • v.20 no.4
    • /
    • pp.31-38
    • /
    • 2009
  • In our country, the application of the design method of face to face dimension in wall-slab apartment has passed 10 years. So MC(Modular Coordination) design method has fixed in the design step to some degree. In Design and Work Execution of House the exclusive area of the apartment was calculated by face to face dimension. And the term of face to face dimension was known broadly to clients, construction company, etc. But design method of face to face dimension is not to simply extend the room size so far as wall depth in design process but to ensure the actual space should be considered with efficient use and assembly of building components. That is to say, Design method of face to face dimension is not to be defined by design step but to be related with construction and maintenance. However in construction process the point of face to face design method was not understood even now. So the purpose of this study was to extract the effect and question of face to face design method in construction process by survey of actual condition of structure and construction quality, and compare this result with existing construction method. The following project of this study is to survey of actual condition of interior components such as gypsum board, windows & doors etc. Therefore this study is to induce architectural long-life through architectural standardization construction and component's exchange, and, by the subject of the study on Apartment to have design guideline and basis for joining part between Gypsumboard and windows.

A Study of the Development of Apartment's Structural Cost Saving Checklist through the Case Research (사례분석을 통한 공동주택 골조공사의 원가절감 체크리스트 개발에 관한 연구)

  • Lee, Kyeong-Seob;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.65-77
    • /
    • 2010
  • Our nation's housing construction is given much weight over 32% in 2007 and especially apartment is taking over 67%. If we put into construction environment consideration, we are having a trouble with price cap policy and the realestate recession due to the global economic crisis. So in order to get competitive power and supply of cheap apartment, the necessity of cost saving is increasing. This research collected the past constructed apartment project's cost saving examples which were influencing on the construction cost, quality and time. We analyzed collected cost saving datum and assorted these in compliance with classification system. By analysis of correlation among datum with exclusion and integration, we make a propose cost saving Checklist that will be a base data to give a chance to use in working level and other research.

A Study on the Profitability According to the Different Sales Timing in Apartment Housing Development Projects (공동주택 개발 사업의 분양시기 변동에 따른 수익성 비교.분석에 관한 연구)

  • Yoon, Seung-Hyeon;Kang, Hyun-Wook;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.62-71
    • /
    • 2009
  • The purpose of this study is to analyze of profitability accordance to the different sales timing in apartment housing development projects. The adapted research method about public apartment hosing development projects by a private construction company is concentrated on the middle and large scale housing. The methodology for analysis of profitability through the change of timing for sales is analysed. According to this methodology, the difference of profitability by different timing of first sales is compared and analyzed. The results of this study are as followed 1)The major factors to affect the profitability for apartment housing development project consist of the timing of sales, the method of payment and the rate of sales. 2) The case study was carried out and then the profitability is analyzed the profitability for the three of cases is got worse when the sale after construction especially on the time of construction progress rate 80% is carried out.

Parameter Impact Applied Case-based Reasoning Cost Estimation

  • Joseph Ahn;Hyun-Soo Lee;Moonseo Park;Sae-Hyun Ji;Sooyoung Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.475-478
    • /
    • 2013
  • To carry out a one-off construction project successfully, effective and accurate early cost estimation is crucial, especially during the conceptual stage where very limited minimum information of construction project is given. As the level of accuracy of the early cost estimation has huge impacts on precise budgeting and cost management of a project, in other words, reducing the risk of a project, cost must be managed with special awareness. In an effort to improve the estimate accuracy of cost during the conceptual stage, this research introduces a Parameter Impact (PI) which can quantify weights of parameters and rank them; and PI development derived from the principle of impulse in physics is explicated. For a case study, 76 public apartment building cases in Korea are analyzed. To examine the validity of the proposed PI, a validation in terms of CBR applicability test and estimate accuracy comparisons using 10-nearest neighbor cases are carried out. The validation results support that the suggested PI can be applied in quantifying the weights of the parameters and CBR method for early cost estimation.

  • PDF

SUGGESTING IMPROVEMENT METHODS OF FORM WORK FOR COST REDUCTION IN THE MID-RISE APARTMENT HOUSING

  • Jeongseok Lee;Seunghee Kang;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1608-1614
    • /
    • 2009
  • In recent days, the study of urban regeneration has been conducting with purposeful and sincere intent starting out with the residential environment improvement works. Within the range of urban regeneration, the low-cost housing technology means development of totally-integrated housing technology that may be applied to the regeneration project, especially for the rundown areas where infrastructure facilities in the urban zone have been degraded and obsoleted. In line with this, among many and varied methods in order for realization of the low-cost housing as a part of urban regeneration project, this study should like to propose an improvement methods of the key technologies in relation to the construction works by type of work with which construction costs (directing cost) would be reduced. And, in order to elicit the method for element technology that has been developed and improved in the most optimal manner centering on the selected construction work by the type of work, the researcher conducted comparative review of summary of element technologies related to the construction works concerned, characteristics, and construction method thereof. In particular, the researcher investigated the expenses (construction cost and labor cost), constructions (contractibility and productivity), safety, quality of works, and the technical status in environmental aspects, and the researcher also conducted analyses and evaluations thereof.

  • PDF

Problem Analysis and Improvements Plans for PF ABCP of Apartment Housing Development Projects (공동주택 PF ABCP의 문제점 분석 및 개선방안에 관한 연구)

  • Kim, Soo-Yeol;Hwang, Uk-Sun;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.133-142
    • /
    • 2011
  • The purpose of this study is to analyze the problems of the parties involved in the issuance of apartment housing development projects. The adapted research method selected four apartment housing development as PF ABCP projects. This study carried out the case about participant institution of PF ABCP funding project including developer, constructor, financial institution so as to draw problems by participant institution. On the basis of the selected case, this thesis proposes methods for involved parties to negotiate and work out problems of the PF ABCP. The results of this study are as follows 1) Launching long-term project financing should be developed, including operating funds and strengthen the ABS and ABCP issuance of credit assessment procedures, combined with the simplicity of the instruments. 2) The Low-risk contract for the construction of simple managerial focus should be the construction, financial institutions essentially dependent on project financing feasibility verification purpose loans to prevent the division a true story, the development should be of interest to be preserved. The proposed included, among other, partial guarantee based on the construction plan financial institutions' share-based investment, and the supplement of legal issues.

A study of Application to the Marketing positioning and Construction Management in Apartment remodeling (공동주택 리모델링에 관한 포지셔닝 및 건설사업관리 적용 방안)

  • Lee, Jeong-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.124-132
    • /
    • 2005
  • The efficient preservation and improvement of stock buildings including houses have become a significant national issue coming into the 21st century. The increase rate of new house demands have lessened and the efficient management and usage of old buildings have become more important. However, lacking research on the effects obtained through remodelling and the perception that it is less profitable than reconstruction have interfered with the vitalization of the market. Also, the excessive profit rate contractors insist have caused conflict between the residents and contractor and weakened market stability. This research examines the related codes, the strengths and weaknesses of marketing positioning in apartment remodelling a rational method for analyzing each project and the working process. A survey was performed to investigate preferences and priorities between the business methods in order to obtain advices that can smoothly progress each project and improve overall building quality. Through this study, the flow of remodeling market is elevated reaching the level in advanced nation.

Analysis of Structural Work Scheduling of Green Frame - Focusing on Apartment buildings - (Green Frame의 골조공사 공기 분석 연구 - 공동주택을 중심으로 -)

  • Lee, Sung-Ho;Kim, Shin-Eun;Kim, Gwang-Hee;Joo, Jin-Kyu;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.301-309
    • /
    • 2011
  • Apartment housings that adopt a bearing wall structure design, which account for a majority of the housing units available in Korea, are not free from structural constraints that limit the extension of their service life. The resulting need for reconstruction from the ground up requires a massive consumption of resources and energy, and triggers environmental pollution resulting from construction wastes. As a solution to such issues, the government enforces incentive schemes to promote a remodeling-friendly rahmen structure design. Green Frame, which is a novel concept of composite precast concrete structure to support rahmen structure apartment housing buildings, can address the constraints of bearing wall structure and conventional rahmen structure designs that limit the potential for remodeling projects, while reducing the term of construction. Therefore, this study aims to analyze the characteristics of Green Frame and its absolute term of construction, and compare the terms of frame work construction in apartment housing projects adopting different structural design approaches to illuminate their differences. In the end, Green Frame is found to be capable of reducing the term of construction in apartment housing projects. As the term of construction is a very critical element of a construction project, Green Frame will ultimately prove to be one of the key enablers to ensure the success of apartment housing construction projects.