• Title/Summary/Keyword: Alternative Plan

Search Result 871, Processing Time 0.028 seconds

VE Alternative Verification Method Using KANO Model (카노모델을 활용한 VE대안 검증방법)

  • Liu, Jun-Nan;Qiao, Le;Park, Jin-Young;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.923-932
    • /
    • 2019
  • VE is used as a powerful tool to add value to facilities by improving functionality and reducing costs. By identifying the client's requirements in the VE process and reflecting them in the quality model, the developed alternatives meet the client's requirements. However, there is no process to verify how the developed alternatives reflect the needs of the client through functional analysis, idea generation and evaluation. The purpose of this study was to develop, verify, and prove the effectiveness of a methodology for evaluating client satisfaction with alternatives developed during the VE Job Plan. The KANO model, which can identify the satisfaction and dissatisfaction of requirements in product planning, was set as a methodology for alternative verification procedures of VE, and was improved and applied to the purpose of this study. As a result, the alternative evaluation method developed in this study was found to be useful. It is expected that the KANO model will be used to evaluate the satisfaction of VE alternatives in the VE Job Plan analysis.

Hexagonal Material Flow Pattern for Next Generation Semiconductor Fabrication (차세대 반도체 펩을 위한 육각형 물류 구조의 설계)

  • Chung, Jae-Woo;Suh, Jung-Dae
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.36 no.1
    • /
    • pp.42-51
    • /
    • 2010
  • The semiconductor industry is highly capital and technology intensive. Technology advancement on circuit design and process improvement requires chip makers continuously to invest a new fabrication facility that costs more than 3 billion US dollars. Especially major semiconductor companies recently started to discuss 450mm fabrication substituting existing 300mm fabrication of which facilities were initiated to build in 1998. If the plan is consolidated, the yield of 450mm facility would be more than doubled compared to existing 300mm facility. In steps of this important investment, facility layout has been acknowledged as one of the most important factors to be competitive in the market. This research proposes a new concept of semiconductor facility layout using hexagonal floor plan and its compatible material flow pattern. The main objective of this proposal is to improve the productivity of the unified layout that has been popularly used to build existing facilities. In this research, practical characteristics of the semiconductor fabrication are taken into account to develop a new layout alternative based on the analysis of Chung and Tanchoco (2009). The performance of the proposed layout alternative is analyzed using computer simulation and the results show that the new layout alternative outperforms the existing layout alternative, unified layout. However, a few questions on space efficiency to the new alternative were raised in communication with industry practitioners. These questions are left for a future study.

Design of Manufacturing Cell based on Genetic Algorithm (유전 알고리즘에 기초한 제조셀의 설계)

  • 조규갑;이병욱
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.15 no.12
    • /
    • pp.72-80
    • /
    • 1998
  • In this study, a design approach based on genetic algorithm is proposed to solve the manufacturing cell design problem considering alternative process plans and alternative machines. The problem is formulated as a 0-1 integer programming model which considers several manufacturing parameters, such as demand and processing time of part, machine capacity, manufacturing cell size, and the number of machines in a machine cell. A genetic algorithm is used to determine process plan for each part, part family and machine cell simultaneously.

  • PDF

A Study on the Planning Alternatives for the Residential Environment Improvement of the New Rural Village(the YoungMoon Project Site) (농촌문화마을 주거환경개선을 위한 공간계획 방향 연구 - 경기도 양평군 광탄리 용문지구 문화마을계획을 중심으로 -)

  • 임승빈;조순재
    • Journal of Korean Society of Rural Planning
    • /
    • v.4 no.1
    • /
    • pp.22-31
    • /
    • 1998
  • For the improvement of the cultural rural village(new rural village project), it is very important to find the various planning alternatives. The purpose of this study is to suggest the ideas which are able to be applied to the rural site planning. The YoungMoon project site located in Kyunggi province was selected case study, The followings are suggestions developed in the process of preparing an alternative plan for the case study. 1) The preparing of the rural site plan is the organizing process of the planning ideas responsive to the condition of both a project site and the project directions. 2) In developing the schematic plan, it is very useful to introduce the cluster madang (small public open space) including 25 houses as a basic planning unit. 3) In comparison with the project plan, the alternative plan presented by this study has advantages of amenity and public space of the residential environment of the new rural village. It is properly said that we have to more and more discuss the best solution to take in planning the rural site, and this efforts contribute the improvement of the quality of the new village project.

  • PDF

A Study of the Active Plan for Alternative Dispute Resolution in Financial Dispute (금융분쟁에 있어서 ADR제도의 효율적인 운영방안)

  • Kim, Yong-Kil
    • Journal of Arbitration Studies
    • /
    • v.24 no.2
    • /
    • pp.53-80
    • /
    • 2014
  • This article focuses on the Active Plan for Alternative Dispute Resolution(ADR) in financial Dispute. The financial consumers of Korea had suffered greatly from the IMF in 1997 and the global financial crisis in 2008, which also increased financial conflicts significantly. In particular, active financial transaction, due to the development of computer and financial techniques causes frequent consumer financial conflicts. It is beneficial to settle them for judicial economy through an alternative conflict arbitration system instead of lawsuit at the court. Many advanced countries settle financial conflicts through various ADR in their numerous financial conflicts. In the settlement of financial conflict, the ADR system, covering mediation and arbitration, is useful and appropriate. Each governmental institution has various conflict settlement organizations, and it is necessary to operate them effectively. In order to settle financial conflicts properly, it is necessary to study law on financial consumer protection, and it is also necessary to understand practical custom and practical knowledge and to systematize them. Further, it is important to manage financial conflict-related data, to accumulate professional experiences, and to prepare a financial conflict settlement system in order to introduce financial education earlier to the whole nation.

  • PDF

A Study on the Improvement of Planning procedure and estimation of Capacity Addition in Long Term Electricity Plan (전력수급기본계획 수립에서 의향서 평가절차의 개천 방안)

  • Kim, C.S.;Rhee, C.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.745-747
    • /
    • 2005
  • After restructuring electricity industry, national long term electricity plans moved to "Basic plan of electricity supply and demand" from "Long term power development plan". The main point is a change of path from plan of power development at national level to plan of electricity supply and demand at company level. A proposal by generation company is surveyed and reflected to the basic plan of electricity supply and demand. The second plan shows over 40% reserves in result of the proposals. It is the time to evaluating the proposal which covers market function in the basic plan of electricity supply and demand at the stage of market change. This research presents the need of evaluation of proposals and the methods of evaluation. Also it presents the alternative planning procedure to reflecting the evaluation methods.

  • PDF

The Study on University Campus Master Plans In Urban Area - Focusing on D & K University Case Study - (도심에 위치하는 대학캠퍼스 마스터플랜에 관한연구 - D/K대학의 사례를 중심으로 -)

  • Kim, Jin-Mo;Cho, Sung-Yong;Choi, Jin-Hee
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.18 no.1
    • /
    • pp.3-10
    • /
    • 2011
  • Recently, an active relation between the University and city has become an issue of increasing importance in the field of campus planning. Campus master plan is known as long range development plan, and is not simply an abstract drawing work but definite scaling work procedure. The purpose of this paper is to examine the planning process and relation between university and the region through master plan of master plan of D University and K University which located in Seoul city. From the research which sees master plan of D universities which are presented in existing an instance and K universities master plan did the service blueprint with base and investigated. And both university currently analyzed the situation which is being placed and grasps a problem point, presented that alternative with what kind of method.

  • PDF

Generation of Alternative Process Plan by Net Model (네트 모델을 이용한 대체 공정 계획 생성)

  • Park, Ji-Hyung;Park, Myon-Woong;Kang, Min-Hyoung
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.14 no.1
    • /
    • pp.168-173
    • /
    • 1997
  • A process planning system that generates alternative process plans offers multiple process plans for a part, thereby provides the flexibility to cope with the changes in shop floor status. In this paper, we intro- duce the concept of process net as a model for the generation of alternative process plans. We also show the usefulness of process net model in generating alternative process plans by implementing the developed sys- tem to construct process net, and devising an algorithm to generate alternative process plans for rotational parts.

  • PDF