The port entry system of the inner harbor in Pyeongtaek${\cdot}$Dangjin was planned as lock-gate in 'Master plan project on port planning in Asan industry base(1990)‘, but was changed to tidal harbor in 'Project maintaining Master plan for comprehensive development of Pyeongtaek${\cdot}$Dangjin port(2001)'. Accordingly, southern sea bank constructed under the lower part of Seohae-bridge will be removed so that inbound/outbound vessels for the inner harbor can navigate at all times. However, in the view of the safety on passing through the lower of Seohae-bridge, navigating conditions for the inner harbor will be restricted in the single-way of 50,000 DWT vessel and the two-way of vessel less than 30,000 DWT Therefore, this study carried out the estimation of traffic congestion arising from these vessels with above restrictions q[ter supposing annual inbound/outbound vessel's numbers for loading and unloading cargo surveyed on the inner harbor.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
v.29
no.1
/
pp.191-195
/
2005
The port entry system of the inner harbor in Pyeongtaek (Asan) was planned as lock-gate in 'Master plan project on port planning in Asan industry base(1990)', but was changed to tidal harbor in 'Project maintaining Master Plan for comprehensive development of Pyeongtaek (Asan) port(2001)'. Accordingly, southern sea bank constructed under the lower part of Seohae-bridge will be removed so that inbound/outbound vessels for the inner harbor can navigate at all times. However, in the view of the safety on passing through the lower of Seohae-bridge, navigating conditions for the inner harbor will be restricted in the single-way of 50,000 DWT vessel and the two-day of vessel less than 30,000 DWT. Therefore, this study carried out the estimation of traffic congestion arising from these vessels with above restrictions after supposing annual inbound/outboubd vessel's numbers for loading and unloading cargo surveyed on the inner harbor.
The variations of D.O and pH due to the inflow of seawater by sluice gates operation were observed in the Lake Shihwa, Korea. The distributions of D.O and pH were investigated at 11 stations during Feburary 1997 to July 1998. The concentration of D.O before gate operation was 10 mg/l or more all over the watershed, yet 5 mg/l or less in the water layers of 11 m or below from March to June 1997. Anoxic layer appeared in June 1997 and expanded during rainy season. The anoxic layer in the lake depleted the oxygen in seawater as seawater was inflowed. It may be interpreted that the phenomenon comes from the contact of seawater to lower fresh water. The contact of seawater in pH 7.8 to 8.2 to lower water less than pH 7.4 enhanced to oxidize. After January 1998, D.O of the lake increased over 10 mg/l and the stratification was weakened. As a result, it may be concluded that the best way to improve the water qualities is to increase the amount of seawater inflow and outflow so as not to be generated pycnocline in summer.
Transactions of the Korean Society of Mechanical Engineers B
/
v.36
no.2
/
pp.217-224
/
2012
In general, transportation sources include both on-road vehicles and off-road equipment. Off-road vehicles have usually used diesel engines, which have the disadvantage of high NOx emission. Common rail direct injection (CRDI) and after-treatment systems have been applied to meet the exhaust gas emission regulations for diesel vehicles. In the present, agricultural machinery has satisfied the Tier 3 emission regulations by using waste gate turbocharger (WGT) and internal exhaust gas recirculation (EGR). In this paper, the combustion and emission characteristics of an EGR system applied to a 56kW off-road vehicle in non-road transient cycle (NRTC) mode have been investigated. The EGR map was made from foundation experiments determining the EGR duty for all engine operating conditions, and then this map was applied to the NRTC mode. Consequently, the NOx emission was reduced by the EGR system, and the Tier 4 interim emission regulations were satisfied by using both the EGR system and an after-treatment system.
As the technologies of semiconductor and multimedia communication have been improved. the high-quality video and the multi-channel audio have been highlighted. MPEG Audio Layer 3 decoder has been implemented as a Processor using a standard. Since the synthesis filter of MPEG-1 Audio Layer 3 decoder requires the most outstanding operation in the entire decoder. the synthesis filter that can reduce the amount of operation is needed for the design of the high-speed processor. Therefore, in this paper, the synthesis filter. the most important part of MPEG Audio, is materialized in FPGA using the method of DAULT (distributed arithemetic look-up table). For the design of high-speed synthesis filter, the DAULT method is used instead of a multiplier and a Pipeline structure is used. The Performance improvement by 30% is obtained by additionally making the result of multiplication of data with cosine function into the table. All hardware design of this Paper are described using VHDL (VHIC Hardware Description Language) Active-HDL 6.1 of ALDEC is used for VHDL simulation and Synplify Pro 7.2V is used for Model-sim and synthesis. The corresponding library is materialized by XC4013E and XC4020EX. XC4052XL of XILINX and XACT M1.4 is used for P&R tool. The materialized processor operates from 20MHz to 70MHz.
Park Sung-Ho;Choi Hyun-Jun;Seo Young-Ho;Kim Dong-Wook
Journal of the Institute of Electronics Engineers of Korea SP
/
v.42
no.2
s.302
/
pp.27-36
/
2005
This thesis proposed an effective encryption method for the DCT-based image/video contents and made it possible to operate in a high speed by implementing it as an optimized hardware. By considering the increase in the amount of the calculation in the image/video compression, reconstruction and encryption, an partial encryption was performed, in which only the important information (DC and DPCM coefficients) were selected as the data to be encrypted. As the result, the encryption cost decreased when all the original image was encrypted. As the encryption algorithm one of the multi-mode AES, DES, or SEED can be used. The proposed encryption method was implemented in software to be experimented with TM-5 for about 1,000 test images. From the result, it was verified that to induce the original image from the encrypted one is not possible. At that situation, the decrease in compression ratio was only $1.6\%$. The hardware encryption system implemented in Verilog-HDL was synthesized to find the gate-level circuit in the SynopsysTM design compiler with the Hynix $0.25{\mu}m$ CMOS Phantom-cell library. Timing simulation was performed by Verilog-XL from CadenceTM, which resulted in the stable operation in the frequency above 100MHz. Accordingly, the proposed encryption method and the implemented hardware are expected to be effectively used as a good solution for the end-to-end security which is considered as one of the important problems.
The Transactions of the Korea Information Processing Society
/
v.6
no.6
/
pp.1656-1666
/
1999
The more complex and large digital circuits become, the more important delay test becomes which guarantees that circuits operate in time. In this paper, the proposed algorithm is developed, which enable the fast indirect implication for efficient test pattern generation in sequential circuits of standard scan environment. Static learning algorithm enables application of a new implication value using contrapositive proposition. The static learning procedure found structurally, analyzes the gate structure in the preprocessing phase and store the information of learning occurrence so that it can be used in the test pattern generation procedure if it satisfies the implication condition. If there exists a signal line which include all paths from some particular primary inputs, it is a partitioning point. If paths passing that point have the same partial path from primary input to the signal or from the signal to primary output, they will need the same primary input values which separated by the partitioning point. In this paper test pattern generation can be more effective by using this partitioning technique. Finally, an efficient delay fault test pattern generator using indirect implication is developed and the effectiveness of these algorithms is demonstrated by experiments.
Journal of Korean Society of Coastal and Ocean Engineers
/
v.23
no.6
/
pp.489-495
/
2011
Fossil fuel energy has become a worldwide environmental issue due to its effect on global warming and depletion in its supply. Therefore, the interest in developing alternative energy source has been rising. Ocean energy, especially, has gained strength as an alternative energy source for its unlimited supply with low secondary risks. Among all the ocean energy, the west coast of Korea holds the field of large-scale energy development because of its distinctive tidal range. Tidal power plant construction at the sea may expedite multi development effects such as bridge roles, tourism resource effects and adjustability of flood inundation at the inner bay. This study introduces the validity of tidal power plant construction at Garilim Bay in west coast of Korea by examining anticipated hydraulic characteristics using EFDC model. Through EFDC numerical simulations, the feasibility of Garolim Bay as a tidal power plant field has been proved. And the most effective tidal power plant construction would be to install hydraulic turbine in the west side of bay entrance where ebb current is stronger, and install water gate in the east side of bay entrance where the flood current is superior.
Magazine of the Korean Society of Agricultural Engineers
/
v.24
no.1
/
pp.44-52
/
1982
Recently, estuary reserovoirs have been actively constructed in Korea and also in Japan there are a large number of estuary reservoirs constructed. But most of the estuary reservoirs are located at the downstream of a river where geographical condition is best for the construction of an enclosing dam. And an effective utilization of water from the estuary reservoir seems to be difficult even if estuary reservoirs are considered to be the water resources the most available for their watershed. Studies on estuary reservoirs so far have been mainly concentrated on the physical and engineering problems of the dam construction itself. The purpose of the present study is to review the estuary reservoir planning in connection with the water resources development and to study a basis of the planning. First, the levels of water use in Korea and Japan were compared with those of other countries in the world. And then, some representative reservoirs were selected to study the roles of a reservoir and water-using conditions in the watershed. Based on the study, a survey was given on the relation between a dam construction upstream and an estuary reservoir construction downstream of a river. Finally, a comprehensive examination was made of the bases of estuary reservoir planning. (1) The estuary reservoir planning is deeply related to the plan for water use develo- pment in the watershed. After the upstream water resources were fully developed up to the most, water reso- urces development by an estuary reservoir should be started. (2) If an estuary lake has a capacity big enough, it can store flood discharge of the watershed without any loss and become a basic facility that will bring about the maxi- mum use of water from the watershed. (3) Estuary reservoirs store water used in the upstream watershed, so recycling of water use is attained by the reservoir. Water in the estuary lake is difficult to be fresh water in its long run. Therefore, estuary reservoir should be located at a place where polluted water is purified and refused. All the planning should be based on the assumption that water in the estuary lake is not fresh but polluted after a long time. (4) The estuary lake can only supply water to the lower basin directly. But the upstream area is benefited from the estuary lake by exchange of irrigation water sources between the lower and the upper area. So a large-scale exchange plan between new and existing water resources is important. By constructing estuary reservoirs and the exchange of water sources between upper and lower areas, the reasonable maximum use of water from the whole watershed is at- tained. (5) The big problem coming from the water resources development by an enclosing estuary is salt water intrusion into the lake. To maintain the estuary lake salt-free, multi-purpose use of the lake should be avoided. It is necessary to take such fundamental measures as abolition of back flow operation of gate, and the closing of the fish port and the fish ladder. The results mentioned above were found in this study and these results of this study could be used for the adequate planning of estuary reservoirs in connection with the maximum water use of the watershed.
Journal of Korean Society for Geospatial Information Science
/
v.24
no.3
/
pp.11-18
/
2016
Since GNSS signals get blocked by buildings in urban canyons or narrow alleys, it is very difficult to secure a enough number of visible satellites for satellite navigation in those poor signal-reception environments. In those situations, one cannot get their coordinates or obtain accurate positions. In this study, a couple of strategies for improving positioning accuracy in urban canyons were developed and their performance was verified. First of all, we combined GPS and GLONASS measurements together and devised algorithms to quality-control observed signals and eliminate outliers. Also, a new multipath reduction scheme was applied to minimize its effect by utilizing SNR values of the observed signals. For performance verification of the developed technique, a narrow alley of 10m width located near the back gate of the Inha University was selected as the test-bed, and then we conducted static and kinematic positioning at four pre-surveyed points. We found that our new algorithms produced an 45% improvement in an open-sky environment compared with the positioning result of a low-cost u-blox receiver. In the alleys, 3-D accuracy improved by an average of 37%. In the case of kinematic positioning, especially, biases showing up in regular receivers got eliminated significantly through our new filtering algorithms.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.