• Title/Summary/Keyword: Airport Infrastructure

Search Result 61, Processing Time 0.032 seconds

Experimental Field Test of GNSS Jamming Signal Monitoring Based on Cloud Data Processing Technique at National Infra-Facilities (클라우드 데이터 처리 방식을 통한 국가 주요시설에서의 GNSS 재밍 모니터링 실측 실험)

  • Jin, Gwon gyu;Won, Jong hoon
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.19 no.4
    • /
    • pp.116-125
    • /
    • 2020
  • Incalculable damage will be incurred if the national infrastructure that provides services using GNSS signals is affected by jamming signals. To prevent this, a nationwide GNSS jamming monitoring network is necessary to detect the occurrence of a jamming signal, determine the type, and properly localize the jammer position. In this paper, 2-D images for live GNSS signals were generated to verify the environment of the jamming signals through the presence and type of GNSS jamming signals at K-City, which are the test beds for self-driving vehicles, and Incheon International Airport. The analysis was also conducted to detect the occurrence of the jamming signals, determine the type, and measure the jamming signal strength. As a result, a CWI type of jamming signal was detected in L2 band at K-City and in L5 band at Incheon International Airport.

Future Northeast Asia Transport and Communications System

  • Rimmer, Peter J.
    • Journal of Korea Port Economic Association
    • /
    • v.17 no.2
    • /
    • pp.1-28
    • /
    • 2001
  • Korea has been at the forefront of efforts to enhance international cooperation in transport and communications within Northeast Asia. This effort is driven not only by the benefits that could accrue to the Korean Peninsula but also to all nations in the region. Mutual cooperation within Northeast Asia would reduce transport and communications costs and provide the basis for a regional transport and logistics network. Before progress can be made towards an integrated transport and communications system in Northeast Asia, however, there is a need to evaluate its prospects, outline a visionary plan, and detail a preferred strategy. The strategy to develop the Korean Peninsula as the gateway for Northeast Asia should harmonize with the region's common transport (and communications) policy The strategy adopted by South Korea is focused primarily on the development of an improved logistics infrastructure that would be extended to North Korea upon reunification. The seaport and airport developments In Korea will have to be supported by improved access to planned high-speed railways, expressways and freight distribution centers that, in turn, are to be integrated with new telecommunications and computer technologies. The benefits from these improvements will be lost unless existing government monopolies controlling seaport, airport, rail, road and expressway developments are commercialized to ensure that the price of transport reflects its actual cost. Technical harmonization between different modes should be promoted to facilitate efficient intermodal transport between the Korean Peninsula and the rest of Northeast Asia.

  • PDF

A Study of the Construction of Comprehensive Flight Testing Infrastructure to Increase Aviation Safety (항공안전 증진을 위한 비행종합시험 인프라 구축 방안 연구)

  • Kim, Seung-Han;Kim, Gyou-Beom;Yim, Jae-Hyun
    • Journal of Convergence for Information Technology
    • /
    • v.10 no.9
    • /
    • pp.147-153
    • /
    • 2020
  • As demand for drone test flight is rapidly increasing, it is difficult for Goheung Aviation Center alone to meet the test flight demand. Newly developed drones or modified existing aircraft carry potential flight risks due to unpredictable flight performance or poor pilot skill when performing test flights outside the test site. Therefore, it is necessary to ensure sufficient test flight space for the safety verification of manned and unmanned aircraft. Therefore, this study analyzed the status of domestic flight test site and chapter 5 of ICAO DOC 9184-AN / 902 Part 1 (Airport Planning Manual). And to build a comprehensive flight test infrastructure, the methodology for preliminary evaluation of candidate sites for flight test sites and a method for evaluating infrastructure test sites was presented.

A Study on Development and Assessing Situation of Hai Phong Logistics

  • Doan, Thi Bich Thuy;Yoon, Dae-Gwun
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2017.11a
    • /
    • pp.140-142
    • /
    • 2017
  • Hai Phong is the important transportation hub of the northern Vietnam with many advantages. Hai Phong can connect with orthers provinces by road, railway, airport, seaport system and inland waterway. So far, Hai Phong is develop so fast However, Hai Phong's logistics services are still low level and less competitive. The human resources are lacking of experiences and also low quality, the logistics enterprises are small, low capital and they can not compete with foreign companies. Further more, the infrastructure are invested but there are still have some problems inside. This paper has assessed and systemized the situation of development of Hai phong.

  • PDF

A Risk Management of Architectural Planning Phase in the Korea Private Infrastructure Project Using Project Financing (프로젝트 파이낸싱을 활용한 국내 SOC 민간투자사업 건축기획 단계에서의 리스크 관리)

  • Lee, Sin-young;Kim, Seon-Gyoo;Lee, Nak-Woon
    • Journal of Industrial Technology
    • /
    • v.27 no.B
    • /
    • pp.177-184
    • /
    • 2007
  • Project Financing(PF) was introduced from the way of banks' conditional financing that take buried oil as security and offer required money to oil explores which have weak loaning ability in the U.S. 1930s. After that PF has developed with financial market and it has been activated in the market of Korea since 'An Institution about Private Financing Invitation Promotion' was established. Started with I-Hwa Ryoung tunnel project, PF has been used in the Metropolitan Area Airport Highway and etc. But because of the risk that occurred by PF's complexity and uncertainty, PF has not been used fully and there are only few practical examples. The purpose of the present study is to investigate how to decrease, identify and extract the risky factors of project that being planned by PF.

  • PDF

A Study on the improvement of the Multilateration data by emplying an IMM filter (IMM 필터를 활용한 Multilateration 정확도 향상에 관한 연구)

  • Cho, Tae-Hwan;Song, In-Seong;Jang, Eun-Mee;Yoon, Wan-Oh;Choi, Sang-Bang
    • Journal of Advanced Navigation Technology
    • /
    • v.16 no.4
    • /
    • pp.578-585
    • /
    • 2012
  • CNS/ATM(Communication Navigation Surveillance/Air Traffic Management) was adopted as a standard navigation system of 21st century. Therefore, ICAO(International Civil Aviation Organization) members are developing the technology and infrastructure of CNS/ATM. ADS-B(Automatic Dependent Surveillance-Broadcast) system and Multilateration system are being implemented in the surveillance field of CNS/ATM. Multilateration system is installed in order to complement radar system and to surveil blind areas. Also, Multilateration system using TDOA(Time Difference Of Arrival) is more accurate than radar. In this paper, we applied an IMM(Interacting Multiple Model) filter which is widely used in radar systems to the Multilateration data in order to improve the reliability of the Multilateration data. Comparisons with the original Multilateration data and the Multilateration data with the IMM filter show that the ADS-B data with the IMM filter provides a better performance: 38.37% near the airport, 20.86% around 10 miles of the airport.

Research about Designation of Restricted Area Dedicated for Remote Piloted Aircraft Flight Test (무인항공기 비행시험 전용 제한구역 설정에 관한 연구)

  • Kee, Yeho
    • Journal of Aerospace System Engineering
    • /
    • v.9 no.2
    • /
    • pp.25-33
    • /
    • 2015
  • Global market of unmanned aircraft(UA) is rapidly expending based on the versatile and efficient utility of the UA. Domestically many industries, universities and research institutes are trying to do research and development of the UA in various angle of aspect. In spite of these effort, all the participants of research and development of the UA has been suffering the difficulty of acquiring the airspace around vicinity of Goheung airfield for the flight test of UA. Although the current procedure of execution of the flight test of UA is set after acquiring the airspace by applying the NOTAM(Notice To Air Man) to the Ministry of Land, Infrastructure and Transport(MLIT) at least 7 days before the flight test and commencing with the publication of the NOTAM by MLIT, if the flight test is carried out as planned, changing or reapplying the NOTAM expends mort time and makes difficulty often. Therefore it is needed that a restricted airspace for the flight test of UA is established and make all the executioner of flight test uses the exclusive airspace without limitation. This research proposes the restricted airspace with short term and long term establish requirement of airspace separately. The short term requirement has been established with the airspace of 10 nm radius and 8,000 ft altitude in which the requirements of flight test can be carried out more than 90% without needs of supplement of the additional airspace. The long term has been established within the airspace of 30 nm radius which is the maximum Radio Line Of Sight(RLOS) and 8,000 ft altitude with exclusion of current air way, airport control area, approaching corridor to the airport, existing restricted area(RA) and Military Operating Area(MOA) for the purpose of minimizing inconvenience of the other airspace user. Once establishing the exclusive airspace for the flight test of UA, research and development of industries, universities and research institutes will be more vigorous and contributes to the national economy.

A Study on Construction Management System for Settlement in Korea through the Case of Program Management of IIA Project (IIA Project PM 적용사례를 통한 CM체계 정착방안)

  • Oh Myung-Kap
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.96-101
    • /
    • 2001
  • Incheon International Airport Construction Project the biggest national multi-complex construction project in a single area in Korea, the necessity for introducing the Program Management System has been brought up from the development stage due to its specific characteristics and environment and with the Project Management Services Contract in December 1994 the system has been established and operated. At the time of contracting, there were controversies over the expected effect of the system since there were no related laws and regulations in domestic construction codes. Furthermore the situation was very hard in which some practical problems have been found in the process of applying and operating the system due to the lack of recognition and infrastructure in Korea. Incheon. In spite of these difficulties, thanks to the devotion and efforts of the project participants along with thoughtful concerns from the industries and the academies, the project goal has been successfully accomplished. This paper will analyze the various problems arose in the process of applying the Project Management System to Incheon International Airport and present more practical and desirable ways so that it can help to make the environment for properly settling Construction Management at the earliest.

  • PDF

A Efficient Strategy Option to Develop Public Heliport in the Metropolitan Area (수도권 공용 헬기장 발전 방안에 관한 연구)

  • Lee, Young-Jong
    • Journal of Advanced Navigation Technology
    • /
    • v.19 no.2
    • /
    • pp.98-102
    • /
    • 2015
  • In this paper are This paper is about the efficient use operational management plan for the metropolitan public Jamsil heliport. First, understand the general operations and facilities to Jamsil heliport and raised the issue for them. And, in cases such as urban offshore heliport Jamsil heliport in New York and Texas (USA), for example, which was presented for comparative analysis and Jamsil heliport in London (UK). Operations, research is seen against a facility to install and manage a couple of airfield operations based on the subject by presenting the alternatives, thereby causing the principal operating facilities, infrastructure and security facilities even suggest ways to enhance the standards. Unlike other countries, Jamsil heliport location characteristics were excluded from the study on the safety aspects related to flight operations and for this I'm a military airport facilities coexist in the neighborhood.

A Study on Vertiport Location and Corridor Selections using GIS Analysis in Busan Area (GIS 분석을 활용한 부산권 버티포트 위치 및 회랑 선정에 관한 연구)

  • ChanHee Moon;HaYoung Shi;TaeWan Ku;BeomSoo Kang
    • Journal of Aerospace System Engineering
    • /
    • v.17 no.6
    • /
    • pp.46-53
    • /
    • 2023
  • As urban traffic congestion and environmental pollution are becoming significant issues in major cities, Urban Air Mobility (UAM) is gaining attention as an efficient solution. In this study, we conducted a geographic information system (GIS)-based spatial analysis and clustering algorithm considering the actual data of the terrain and infrastructure in the Busan area, through which we were able to select the location of vertiports and corridors (flight routes) for the UAM operation. Based on the Gimhae International Airport, which is expected to be the center of the UAM infrastructure system in the Busan region, we judged that three vertiport locations in the target area were suitable. Subsequently, we used the A* (A-star) algorithm considering Ground Risk to select a flight path that minimized both risk and distance. Through this, we confirmed a risk reduction effect of 80.168% compared to the minimum distance route.