• Title/Summary/Keyword: Adjacent excavation

Search Result 215, Processing Time 0.029 seconds

A study on degree of inclination of model pile due to tunnelling (터널굴착에 따른 모형말뚝의 기울기 정도 연구)

  • Lee, Yong-Joo;Hwang, Jae-Wook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.4
    • /
    • pp.305-317
    • /
    • 2011
  • In this study, both the model test and the numerical analysis were carried out to figure out the physical behaviour of the model pile during the tunnelling. As a result, both the vertical and the horizontal displacements were simultaneously occurred in the model pile which is subjected to the working load during the volume loss. Consequently, the phenomenon of inclination took place in the model pile. The degree of inclination of the model pile depends on volume loss due to tunnel excavation, pile tip's offset from the tunnel centre, and bearing ground conditions in which pile tip is located. Therefore, in the planning stage of urban tunnelling not only the ground behaviour with respect to the pile locations, but also the physical behaviour of pile itself should be carefully analysed to avoid damage of adjacent buildings.

A Study on the Vibration Propagation Characteristics of Controlled Blasting Methods and Explosives in Tunnelling (터널 제어발파 공법 및 화약류의 진동전달 특성에 관한 연구)

  • Jung, Hyuksang;Jung, Kyoungsik;Mun, Hongnyeon;Chun, Byungsik;Park, Duhee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.2
    • /
    • pp.5-14
    • /
    • 2011
  • The most common problem encountered in domestic tunnel construction sites are solving public resentments caused by damage to adjacent structures and buildings. The most effective excavation method in rock tunnelling is the drilling and blasting, which is the main cause of vibration resulting in the public resentments. In this study, numerical analysis is conducted to compare the vibration reduction effect of line drilling and pre-splitting methods. Furthermore, the numerical simulations are verified and the results are quantified. Finally, various combinations of explosives used in controlled blasting are used and the vibration reduction effects are evaluated, thereby proving the applicability of the controlled blasting for reduction of vibration in tunnelling.

A Case Study on Blasting at the Tunnel Excavation in an Adjacent Section of a Subway Station (지하철역 인접구간에서의 터널 발파굴착 사례)

  • Lee, Hyo;Kim, Jeoung-Hwan;Hwang, Nam-Sun
    • Explosives and Blasting
    • /
    • v.40 no.2
    • /
    • pp.25-34
    • /
    • 2022
  • Recently, there has been an increasing number of cases of improving constructability by using electronic detonators with precise delay time in tunnel blasting sites. This case is a case of conducting test blasting using with non-electric detonator and electronic detonator at the site of 『Seoul Metropolitan Area Express Railroad Route A Private Investment Project Section 00』 that requires careful management of vibration and noise. Although this site was designed with a non-electric detonator, it was attempted to improve the advance rate and control vibration and noise by mixing the non-electric detonator and the electronic detonator due to the decrease in the advance rate. As a result of the blasting, the target value was achieved with an advance rate of about 85% and a maximum measured value of vibration and noise is 0.215cm/sec and 73.22dB(A) which were measured below regulatory standards. As blasting works in downtown areas, it is necessary to designate measurement and management objects to continuously manage vibration and noise.

Research on reinforcement mechanism of soft coal pillar anchor cable

  • Li, Ang;Ji, Bingnan;Zhou, Haifeng;Wang, Feng;Liu, Yingjie;Mu, Pengfei;Yang, Jian;Xu, Ganggang;Zhao, Chunhu
    • Geomechanics and Engineering
    • /
    • v.29 no.6
    • /
    • pp.697-706
    • /
    • 2022
  • In order to explore the stable anchoring conditions of coal side under the mining disturbance of soft section coal pillar in Wangcun Coal Mine of Chenghe Mining Area, the distribution model of the anchoring support pressure at the coal pillar side was established, using the strain-softening characteristics of the coal to study the distribution law of anchoring coal side support pressure. The analytical solution for the reinforcement anchorage stress in the coal pillar side was derived with the inelastic state mechanical model. The results show that the deformation angle of the roadway side and roof increases with the roof subsidence due to the mining influence at the adjacent working face, the plastic deformation zone extends to the depth of the coal side, and the increase of anchorage stress can effectively control the roof subsidence and further deterioration of plastic zone. The roadway height and the peak support pressure have a certain influence on the anchorage stress, the required anchorage stress of the coal side rises with the roadway height and the peak support pressure. The required anchorage stress of the coal pillar side decreases as the cohesion between the coal seam and the roof and floor and the anchor length increases. Then, applied the research result to Wangcun coal mine in Chenghe mining area, the design of anchor cable reinforcement support was proposed for the section of coal pillars side that has been anchored and deformed, which achieved great results and effectively controlled the convergence and deformation of the side, providing a safety guarantee for the roadway excavation and mining.

Behavior of wall and nearby tunnel due to deformation of strut of braced wall using laboratory model test (실내모형시험을 통한 흙막이벽체 버팀대 변형에 따른 흙막이벽체 및 인접터널의 거동)

  • Ahn, Sung Joo;Lee, Sang Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.3
    • /
    • pp.593-608
    • /
    • 2018
  • If a problem occurs in the strut during the construction of the braced wall, they may cause excessive deformation of the braced wall. Therefore, in this study, the behavior of the braced wall and existing tunnel adjacent to excavation were investigated assuming that the support function of strut is lost during construction process. For this purpose, a series of model test was performed. As a result of the study, the earth pressure in the ground behind wall was rearranged due to the deformation of the braced wall, and the ground displacements caused the deformation of adjacent tunnels. When the struts located on the nearest side wall from the tunnel were removed, the deformation of the braced wall and the tunnel deformation were the largest. The magnitude of transferred earth pressure depended on the location of tunnel. The increase of the cover depth of tunnel from 0.65D to 2.65D caused the increase of the earth pressure by 25.6%. As the distance between braced wall and tunnel was increased from 0.5D to 1.0D, the transferred earth pressure increased by 16% on average. Horizontal displacements of braced wall by the removal of the strut tended to concentrate around the removed struts, and the horizontal displacement increased as the strut removal position is lowered. The tunnel displacement was maximum, when the cover depth of tunnel was 1.15D and the horizontal distance between braced wall and the side of tunnel was 0.5D. The minimal displacement occurred, when the cover depth of tunnel was 2.65D and the horizontal distance between braced wall and the side of tunnel was 1.0D. The difference between the maximum displacement and the minimum displacement was about 2 times, and the displacement was considered to be the largest when it was in the range of 1.15D to 1.65D and the horizontal distance of 0.5D.

Experimental study on the relaxation zone depending on the width and distance of the weak zone existing ahead of tunnel face (터널 굴진면 전방에 위치한 연약대 폭과 이격거리에 따른 이완영역에 대한 실험적 연구)

  • Ham, Hyeon Su;Lee, Sang Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.5
    • /
    • pp.855-867
    • /
    • 2018
  • When a weak zone exists ahead of tunnel face, the stress in the adjacent area would increase due to the longitudinal arching effect and the stability of the tunnel is affected. Therefore, it is critical to prepare a countermeasure through the investigation of the frontal weakness zone of the excavated face. Although there are several researches to predict the existence of weak zone ahead of tunnel face, such as geophysical exploration, numerical analysis and tunnel support, lack of studies on the relaxation zone depending on the width or distance from the vulnerable area. In this study, the impact of the weak zone on the formation of the relaxation zone was investigated. For this purpose, a series of laboratory test were carried out varying the width of the weak zone and the separation distance between tunnel face and weak zone. In the model test, sand with a water content of 3.8% was used to form a model ground. The model weak zone was constructed with dry sand curtains. The tunnel face was adjusted to allow a sequential excavation of upper and lower half part. load cells were installed on the bottom of the foundation and the tunnel face and measuring instruments for displacement were installed on the surface of the model ground to measure the vertical stress and surface displacements due to tunnel excavation respectively. The test results show that the width of weak zone did not affect the ground settlement while the ground subsidence drastically increased within 0.25D. The vertical stress and horizontal stress increased from 0.5D or less. In addition, the longitudinal arching effect is likely within the 1.0D zone ahead of the tunnel face, which may reduce the vertical stress in the ground following tunneling direction.

Geophysical Exploration of Songsalli Ancient Tombs and Analysis of King Muryeong's Tomb Structure, Gongju (공주 송산리 고분군(公州 宋山里 古墳群)에서의 물리탐사와 무령왕릉(武寧王陵)의 구조분석)

  • Oh, Hyun-dok
    • Korean Journal of Heritage: History & Science
    • /
    • v.46 no.4
    • /
    • pp.4-23
    • /
    • 2013
  • Songsalli Ancient Tombs of Gongju consists of seven tombs. King Muryeong's tomb, the seventh tomb, is a brick chamber tomb discovered during the drainage works for the fifth and the sixth tombs in 1971. The excavation at the time focused on topographic surveys of the tomb entrance and the inside of the burial chamber as well as collection of the remains. The burial mount survey confirmed the status of some stone slab remaining and lime-mixed soil layers, but the survey did not examine the exterior structure of the whole tomb as the mounds were removed even more deeply. The excavation revealed damages to the bricks and mural damages due to moisture and fungus in the sixth and the seventh tombs. Between 1996 and 1997, Gongju National University conducted a comprehensive detailed survey of Songsalli Ancient Tombs including a geophysical survey, with an aim to identify the root causes of such degradation. Based on the results, repair took place in 1999 and the fifth, sixth and seventh tombs were placed under permanent conservation to conserve the cultural assets. General public is currently denied access. The purpose of this study was to conduct a three-dimensional resistivity and GPR surveys on the ground surface of the fifth, sixth and seventh tombs of Songsalli Ancient Tombs in order to understand the underground status after repair. The study also aimed to understand the thickness of all the tomb walls and exterior structure based on GPR inside King Muryeong's tomb. The exploration on the ground surface found that the three tombs and soil adjacent to the tombs had resistivity as low as 5 to $90{\Omega}m$, which confirmed that the soil water content was still as high as that prior to the repair work. Additionally, GPR found that the wall construction of the burial chamber of King Muryeong's tomb was approximately 70cm in thickness, while the structure was of 2B with two bricks, about 35cm in length, put together longitudinally(2B brick masonry). The pathway to the burial chamber was of the 2B structure just like that of the burial chamber walls, while its thickness was 80cm with an eyebrow-type arch connected to it. Also, the ceiling exterior appears to have an arch structure, identical to the shape inside.

Changes in Construction and Characteristics during the Period of Foundation and Change of the Garden Pond Site in Guhwang-dong, Gyeongju (경주 구황동 원지(九黃洞 園池) 유적 창건 및 변화 시기의 조영과 성격 변화)

  • KIM, Hyungsuk
    • Korean Journal of Heritage: History & Science
    • /
    • v.55 no.3
    • /
    • pp.102-118
    • /
    • 2022
  • Gyeongju, the capital of Silla, is the very essence of the culture and technology of the thousand-year-reign of Silla. However, few studies have been conducted on the landscape sites of the capital of Silla other than Donggung Palace and Wolji Pond, due to the lack of related data. Therefore, this study examined the construction characteristics and nature of the garden pond in Guhwang-dong, whose complete appearance was identified through excavation following Donggung Palace and Wolji Pond. Since the excavation of the garden pond in Guhwang-dong, Gyeongju, there have been disagreements in academia as to whether it is a palace pond or a temple pond of Bunhwangsa Temple. Considering the unique characteristic of the garden pond that it is divided into two periods, it was interpreted that it would have functioned as a ritual facility related to Ryong (oriental dragon) belief in the 6th to 7th centuries, the first period, and as a garden pond with enhanced landscaping functions in the 8th to 9th centuries, the second period. In addition, it is highly probable that it was the site of Cheongyeongung Palace (青淵宮) and Jochujeong Pavilion (造秋亭) mentioned in the literature records. The "ㄹ"- shaped waterway, a characteristic facility of the first period, was found; however, considering its width and depth, it is insufficient to conclude that it was a simple drainage facility. Rather, it is more likely that it functioned as a passageway for the conceptual entry of Ryong during Ryong rituals. Furthermore, some have suggested that it may have been a ceremony-related Yusang-goksu (流觴曲水) facility. These facilities related to Ryong rituals were reorganized in the second period. Specifically, the nature of the garden pond was changed centered on the landscaping function in connection with the addition of a curved revetment, garden stone, and pavilion buildings, and the dismantlement of the "ㄹ"-shaped waterway and hexagonal building. As for nature, it can be regarded as a royal facility in terms of decorative elements including the ritual function of the first period and the gwimyeonwa (ghost face tiles) of the second period. Judging from the fact that the upper part of the embankment adjacent to the west side of the site was removed, it is very apparent that the main building was located on the upper part of the embankment. There would not have been a large-scale building site because it served the functions of ritual and recreation, rather than being the residence of the king.

A study on hydraulic back analysis for an urban tunnel site and stability analysis based on hydro-mechanical coupling analysis (도심지 터널 용출수 발생구간에서의 수리 역해석 및 수리-역학 연계해석을 통한 안정성 해석 연구)

  • Park, Inn-Joon;Song, Myung-Gyu;Shin, Uyu-Soung;Park, Yong-Su
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.4
    • /
    • pp.397-404
    • /
    • 2008
  • Excessive amount of groundwater flowed into tunnel, while constructing Incheon international airport railway. Tunnel passes under subway line no. 2 with only 1.76 m below. To protect the existing structure, TRcM excavation method was applied. As station and construction shaft are already constructed, which are located back and forth of TRcM section, 86.4 ton per day of groundwater inflow is against expectation. To identify mechanism of excessive water inflow, hydraulic back analyses were performed. Then, hydro-mechanical coupled analysis were also performed with the hydrogeologic parameters identified, whose results are investigated for checking the stability of adjacent structures to the tunnel under construction. And a number of mechanical analyses were also performed to check the hydro-mechanical coupling effect. The result from the mechanical analysis shows that subsidence and tunnel ceiling displacement will be 0.85 mm and 1.32 mm. The result of hydro-mechanical couple analysis shows that subsidence and maximum tunnel ceiling displacement will be 1.2 mm and 1.72 mm. Additional displacements caused by groundwater draw down were identified, however, displacement is minute.

  • PDF

Hydrogeological Stability Study on the Underground Oil Storage Caverns by Numerical Modeling (수치모델링을 이용한 지하원유비축시설의 수리지질학적 안정성 연구)

  • 김경수;정지곤
    • The Journal of Engineering Geology
    • /
    • v.12 no.1
    • /
    • pp.35-51
    • /
    • 2002
  • This study aims to establish the methodology for design of an optimum water curtain system of the unlined underground oil storage cavern satisfying the requirements of hydrodynamic performance in a volcanic terrain of the south coastal area. For the optimum water curtain system in the storage facility, the general characteristics of groundwater flow system in the site are quantitatively described, i.e. distribution of hydraulic gradients, groundwater inflow rate into the storage caverns, and hydrogeologic influence area of the cavern. In this study, numerical models such as MODFLOW, FracMan/MAFIC and CONNECTFLOW are used for calculating the hydrogeological stability parameters. The design of a horizontal water curtain system requires considering the distance between water curtain and storage cavern, spacing of the water curtain boreholes, and injection pressure. From the numerical simulations at different scales, the optimum water curtain systems satisfying the containment criteria are obtained. The inflow rates into storage caverns estimated by a continuum model ranged from about 120 m$^3$/day during the operation stage to 130~140m$^3$/day during the construction stage, whereas the inflow rates by a fracture network model are 80~175m$^3$/day. The excavation works in the site will generate the excessive decline of groundwater level in a main fracture zone adjacent to the cavern. Therefore, the vertical water curtain system is necessary for sustaining the safe groundwater level in the fracture zone.