1 |
Back, S.H. (2002), A behavior of braced wall and adjacent ground with the preloading and wall stiffness, Master Thesis, Ajou University, pp. 31-33.
|
2 |
Choi, Y.J., Park, B.S., Lee, S.D. (2013), "A study on the behavior of the adjacent tunnel due to the deformation of bracing", Procceedings of the KTA 2013 Fall Symposium, November 01, 2013, pp. 67-70.
|
3 |
Choi, Y.J. (2013), Behavior of a tunnel adjacent to the cut-off wall due to the deformation of bracing, Master Thesis, Ajou University, pp. 31-35.
|
4 |
Clough, G.W., Smith, E.M., Sweeney, B.P. (1989), "Movement control of excavation support systems by iterative design", Proceedings of the ASCE Foundation Engineering: Current Principles and Practices, 2, pp. 869-884.
|
5 |
Duddeck, H., Erdmann, J. (1985), "Structural design models for tunnels in soft soil", Underground Space, Vol. 9, Pergamon Press, pp. 246-259.
|
6 |
Hwang, R. N., Duann, S.W., Cheng, K.H., Chen, C.H. (2011), "Damages to metro tunnels due to adjacent excavations", Proceedings of the International Symposium on Backward Problems in Geotechnical Engineering, TC302, Osaka 2011, pp. 83-88.
|
7 |
Kim, I., Lee, S.D. (2007), "behavior of tunnel under the influence of pre-loading on braced wall during the adjacent ground excavation", Journal of Korean Tunnelling and Underground Space Association, Vol. 9, No. 4 pp. 331-341.
|
8 |
Lee, J.M., Lee, S.D. (2010), "Behavior of building lower part passage tunnel due to adjacent ground excavation", Tunnel and Underground Space, Vol. 20, No. 5 pp. 369-377.
|
9 |
Lee, S.D. (2014), Soil Mechanics, CIR, Seoul, pp. 353-354, 388-396.
|