• 제목/요약/키워드: Actual cost

검색결과 1,518건 처리시간 0.021초

노인단독가구의 실제생계비와 주관적 생계비간의 차이분석 (A Study on the Gap between Actual Cost of Living and Subjective Cost of Living of the Elderly Households)

  • 성영애
    • 가정과삶의질연구
    • /
    • 제28권6호
    • /
    • pp.195-205
    • /
    • 2010
  • households using the 2007 Korean Retirement and Income Study. Elderly households were classified into three groups based on the comparisons among the costs of living and then the factors influencing the probability of belonging to each group were investigated using multiple logistic regression models. The major findings are as follows. Firstly, the subjective adequate cost of living was the highest and the subjective minimum cost of living was the lowest. The actual cost of living was in between. Secondly, 42.6% of elderly households belonged to Group1(whose actual cost of living was less than the subjective minimum cost of living), 30.0% was classified into Group2(whose actual cost of living was greater than the subjective minimum cost of living but less than the subjective adequate cost of living) and the actual cost of living of the remaining 27.4% was greater than the subjective adequate cost of living(Group3). Thirdly, income was the strongest factor influencing the probability of belonging to each group, but the influencing factors were different for the logistic models for Group1 and Group3 based on Group2.

조경공사 적산방식의 비교연구 - 실적공사비와 표준품셈의 단가비교 - (Comparative Study of Cost Estimate System in Landscape Architectural Construction - Comparison of Unit Price between Actual Construction Cost and Standard Quantity per Unit -)

  • 정운수;최기수
    • 한국조경학회지
    • /
    • 제40권2호
    • /
    • pp.97-111
    • /
    • 2012
  • 본 연구는 공공건설공사 중 조경공사 적산의 단가 비교로 적정 공사비 산출방안을 모색하고자 하였다. 2011년 상반기 실적단가에서 조경공사로 분류되는 12항목 중 유사기준인 7항목을 대비하며, 준용 공종은 5개 현장에 적용된 실적단가 80항목 중 비교 가능한 35항목을 유사기준인 2011년 3월의 표준품셈 단가로 대비하였다. 조경부문 7항목의 실적공사비율은 항목별로는 104.86%, 총공사비로는 92.09%이다. 실적공사비율이 높은 이유는 암반 적용 여부로 씨앗뿜어붙이기의 높은 비율도 있지만, 근본적인 이유는 잔디와 씨앗뿜어붙이기의 사면처리 비용 때문이므로, 품셈의 불합리성과 토양 종류별 기준별 보정계수 규정을 세분할 필요가 있다. 토목과 건축 준용부문 35항목의 실적공사비율은 항목별로 78.65%, 총공사비로는 71.31%(70.17%)이다. 이는 실적단가가 구조적으로 실제 금액을 반영하지 못하는 점과, 품셈은 인력시공에서 현실성이 결여된 때문으로 판단된다. 국토해양부 발표인 85.1~91.2%의 실적공사비율은 신규 전환품목 단가이므로, 이 결과는 실제적인 실적공사비율로 추정되며, 실적단가가 적정 비율을 보이도록 검증 후 보완하고 표준품셈도 이러한 실적자료 등으로 보완이 필요하다.

소규모 건축공사의 적정 실적공사비 단가보정 모델 개발 (Development of an Unit Cost Modification Model for Proper Actual Cost Data in Small Building Construction Projects)

  • 김강식;현창택;홍태훈;조성민;문현석
    • 한국건축시공학회지
    • /
    • 제10권1호
    • /
    • pp.81-89
    • /
    • 2010
  • 정부는 2004년부터 원가산정체계를 실적공사비 중심으로 전환하였다. 이러한 실적공사비는 계약단가를 기준으로 산정되며, 현재 10억원 이상의 공공 건설공사에 적용되고 있다. 그러나 대형공사 위주의 평균단가로 구성되어 있는 실적공사비를 10억원 미만의 소규모 건축공사에 직접적으로 반영하게 됨으로써 소규모 건축공사의 실행금액이 계약금액 이상으로 증가되는 경우가 빈번히 발생하고 있다. 뿐만 아니라, 이에 따른 영업이익의 감소로 기업운영 및 생산성 등에 악영향을 미치는 등과 같은 여러 문제들이 야기되고 있다. 따라서 10억원 미만의 소규모 건축공사에 실적공사비를 적용하기 위해서는 사업의 규모 등을 반영할 수 있는 단가보정 방안이 있어야 한다. 이에 본 연구에서는 실적공사비를 10억원 미만의 소규모 건축공사에 적용하는데 발생할 수 있는 단가적용의 문제를 해결하기 위하여 실적단가를 보정할 수 있는 실적공사비 단가보정 모델을 개발하였다. 이 모델은 소규모 건축공사의 생산성과 적정한 이윤을 책정하는데 도움을 줄 수 있으며, 소규모 건설업체의 경영이 악화되는 것을 방지할 수 있을 것으로 판단된다. 그리고 발주처는 예산편성 시 현실성 있는 공사비를 확보할 수 있을 것으로 기대된다.

실적공사비에 의한 지하철 공사비 예측모형에 관한 연구 (A Study on the Prediction-Formulas of Approximate Estimate Based on Actual Work Cost for Subway)

  • 박종혁;전영배;박홍태
    • 한국재난정보학회 논문집
    • /
    • 제9권1호
    • /
    • pp.11-21
    • /
    • 2013
  • 본 연구는 2004년 이후 도입된 실적 공사비 제도에 의하여 착공된 지하철 건설공사를 대상으로 실적공사비, 공사규모 그리고 시간을 고려하여 공사비를 예측하는 식을 제시하였다. 11개의 지하철공사 자료를 이용하여 지하철 공사비 예측을 위한 비용-규모 지수 n(신뢰범위:0.5~0.7)을 구한 결과, 총공사비 0.713, 순공사비 0.77로 도출되었다. 본 연구에서 제시한 공사비 예측 식 모델은 향후 지하철 공사 적용 현장의 사업기획, 예비조사, 타당성조사, 기본설계 단계에서 개산 공사비를 추정하는데 효과적으로 적용할 수 있을 것이다.

The Cost Monitoring of Construction Projects through Earned Value Analysis

  • Waris, Muhammad;Khamidi, Mohd Faris;Idrus, Arazi
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권4호
    • /
    • pp.42-45
    • /
    • 2012
  • In construction industry, the term 'procurement' is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators such as cost monitoring is an ongoing process and its importance cannot be undermined during the project life cycle. It can be monitored by using traditional approach of direct reporting of actual cost against budget. However, the comparison of budget versus actual spending does not indicate the worth of the work which is completed at any given time. This approach does not represent the true cost performance of the project. Because of these limitations, this paper discusses the applications of Earned Value Analysis (EVA) for cost monitoring of construction projects in Malaysia. Besides traditional approach, EVA is a three-dimensional approach that compares three cost indicators i.e. the budgeted value of work scheduled with the earned value of physical work completed and the actual cost of work completed. Therefore, cost monitoring by EVA is an objective measure of actual work performed. This paper uses a case study, an example application of EVA as a cost monitoring tool. This case study reaffirms the benefits of using EVA for project cash flow analysis and forecasting.

실적자료에 의한 농어촌정비사업 사업비 결정에 있어서의 단가모델 구축 (Development of Construction Cost Estimation Model with the Actual Cost Data for Rural Development Project)

  • 배연정;이정재;윤성수
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 1999년도 Proceedings of the 1999 Annual Conference The Korean Society of Agricutural Engineers
    • /
    • pp.359-364
    • /
    • 1999
  • Providing the reasonable construction cost at the initial stage of the rural development project, is a kety factor of the each step of project , such as propriety analysis , cost planning , design, and planning the progress of work. The explainable construction cost can be estimated at the early stage using the actual cost data by statistical analysis. In this study, the influence factors are extracted by factor analysis with the actual cost data of rural development project, object cost model is developed by multiple regression analysis, and verify the developed cost model by Monte-Carlo simulation .

  • PDF

4~10년차 실적자료에 근거한 공동주택 하자보수 보증금의 사용실태 분석연구 (Analytic study of 4~10 years Defect Deposite Use State based on Actual Data after moving in apartment complex)

  • 서덕석;전명수;이은희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.153-154
    • /
    • 2011
  • In Korea, the apartment supplier should satisfy the apartment residents' demand on the defect repair found in apartment housing by the law of Management of Apartment Complexs. But in the cost of defect repair, not only the actual defect repair cost, but also the cost of residents' complains are contained. So in this analytic study, the actual use state of defect deposite during 4~10 years after moving in are analysed base on actual data of 15 apartment complexes. In this study, about 66% of defect repair deposites are used to actual defect repair and only 34% of defect repair cost are spent to satisfy the demand of apartment residents'.

  • PDF

시계열분석을 통한 실적공사비의 노무비 분석 및 예측에 관한 연구 (Time Series Analysis and Forecast for Labor Cost of Actual Cost Data)

  • 이현석;이은영;김예상
    • 한국건설관리학회논문집
    • /
    • 제14권4호
    • /
    • pp.24-34
    • /
    • 2013
  • 2004년부터 정부는 무분별한 저가입찰을 방지하고, 기술 경쟁에 의한 적정 시장 가격 반영 및 효율적인 계약관련 업무를 추진하는 것을 목적으로 실적공사비 제도를 도입 시행하고 있다. 하지만 실적공사비 제도의 도입이 낙찰단가 하락에 의한 정부의 예산 절감에만 기여할 뿐, 실질적인 시장가격을 반영하고 있지 못하고 있다는 우려의 목소리 또한 꾸준히 제기되고 있는 실정이다. 낙찰단가 하락에 의한 일반건설업체의 비용 부담은 전문건설업체로 전가되며 최종적으로 건설노동자의 피해로 이어질 가능성이 크기에, 실적공사비에 적정 가격을 반영하고 현실화하는 것은 성공적인 실적공사비 제도의 정착에 매우 중요한 요소이다. 따라서 본 연구는 노무비를 중심으로 노무중심공정을 도출하고 이들의 실적공사비단가와 해당 기능공의 시중노임단가를 비교하여 실적공사비의 현실화수준을 파악하고, 시계열분석을 통해 변화를 분석하고 예측하였다. 시장가격이 반영되지 않은 낙찰 단가의 실질적 하락은 노무 환경의 변화를 가속화하고, 임금체불, 업체부도 등 건설근로자의 직접적인 피해로 이어질 수 있기에 향후 본 연구가 현행 실적공사비 제도의 문제점을 해결하고, 개선방안을 수립하기 위한 기초 자료로 활용될 수 있을 것으로 기대된다.

수로터널공사의 효율성 분석을 통한 굴진속도 및 직접공사비 분석 - 구경 5.0m 중심으로 (Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site - Diameter 5.0m Target)

  • 박홍태;이양규
    • 한국재난정보학회 논문집
    • /
    • 제8권4호
    • /
    • pp.328-335
    • /
    • 2012
  • 건설공사의 표준품셈에 의한 자원기반 적산방식은 정부고시 노임단가와 기자재의 공시가 격에 표준적이고 보편적인 공법 및 공종에 대한 단위작업당 재료량, 노무량, 장비사용시간 등을 수치로 표시한 품을 곱하여 견적하였다. 그러나 자원기반 적산방식은 실제 거래가격을 적절히 반영하지 못하는 한계점이 발생하였다. 따라서 본 연구는 이러한 한계점을 극복하기 위하여 새로운 시도로 수로터널 현장을 대상으로 Cutter 점검/교환, TBM 정비, TBM 점검/급유, 후속설비, 광차, 운영교대, 갱내보강/낙반보강, 안전/회의의 작업 공종 별로 TBM 굴진 생산성을 분석하고, 이를 근거로 순굴진속도를 분석하여 실적 공사비를 분석하였다. 본 연구에서 제시하는 실적공사비 산정 접근법은 TBM 수로터널 현장에서 실적 공사비를 예측하는데 유용한 도구로 활용할 수 있을 것으로 확신한다.

실적공사비 분석을 통한 공공주택 공사비 추정에 관한 연구 (A Study on the Presumption of Construction Cost of Public Apartment by Analyzing Actual Construction Cost)

  • 윤우성;이현철;이한민;고성석
    • 한국건설관리학회논문집
    • /
    • 제10권2호
    • /
    • pp.132-144
    • /
    • 2009
  • 본 연구에서는 기 준공된 국내 공공주택의 실적공사비 분석을 토대로 공공주택 공사비 추정을 위한 기초자료를 제시하고자 하였다. 이에 대한주택공사(이하 주공)에서 발주하여 2004년부터 2007년까지 준공된 각 지역별 23개의 공공주택을 연구 대상으로 선정하여, 실제 투입 및 정산된 실적공사비를 분석하였다. 분석항목으로는 주요 직접비 항목인 공통가설, 건축, 토목, 기계설비 4개의 공종을 대상공종으로 하였으며, 물가상승률을 고려한 경상가 기준의 투입 공사비를 준공연도, 지역, 연면적, 분양방식별로 분류하고, 이에 따른 $3.3m^2$당 실적공사비를 각 공종별로 비교 분석하여 평균 실적공사비를 토대로 한 공사비의 유추와 산정식을 분석 제시하였다.