• Title/Summary/Keyword: Actual Cost Addition Method

Search Result 98, Processing Time 0.027 seconds

Cost Model for Annual Cost Spread Estimation of Space Launch Vehicle Development (발사체 개발의 연차별 비용 추정을 위한 비용모델 개발)

  • Kim, Hong-Rae;Yoo, Dong-Seo;Choi, Jong-Kwon;Chang, Young-Keun
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.39 no.6
    • /
    • pp.576-584
    • /
    • 2011
  • In order to develop a launch vehicle successfully, it is important to estimate development costs accurately but it is also important to plan the annual budget. In this paper, the statistical method was utilized for cost spreading. For cost spread modeling, the suitability of the model by analyzing several statistical models was evaluated and consequently, the beta-distribution model has been selected. In this study, the validity of the annual estimation cost model was verified through the comparison of the actual development cost distribution and the estimating cost distribution of Space Shuttle Main Engine. In addition, this paper estimated the annual budget required for the development of the KSLV-II using currently allocated cost for successful development. It is anticipated that the present cost spread model can be applied to not only launch vehicle development but also other large complex system development.

Adjustment of the Appropriate Cost Support Rate for Measuring the Working Environment (작업환경측정 적정 비용지원율 수준으로의 조정 방안)

  • Park, Ji-Yeon
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.31 no.4
    • /
    • pp.353-366
    • /
    • 2021
  • Objectives: An appropriate level of cost support is being proposed to maximize the participation rate. In addition, as the amount of support is highly concentrated at the level of the limit under the current level of supports, the level of cost support is low when the actual level of cost of measuring the working environment exceeds the limit. This paper describes the adjustment of an appropriate cost support rate. Methods: First, this paper analyzes the current cost support status using data from the KOSHA. Second, an alternative for adjusting the cost support rate is presented in consideration of the incentive aspect. Third, we present simulation results for the average cost support rate, the impact of each alternative on finance, and more. Fourth, the most desirable adjustment method is presented after comparing and analyzing the results of various alternatives. Results: In this paper, we present a new scale model. This model is a mixture of flat-rate, fixed rate, and subside cap. It is expected that the new model will not only facilitate participation in businesses with low measurement costs, but also have the effect of controlling measurement costs for institutions that incur greater costs. It is also expected that setting a cap will have the effect of considering government finances and inducing excessively costly institutions to reduce costs. Thus, the new model is likely to be superior to others. If the fourth plan is applied to new businesses and the fifth plan is applied to sustainable businesses, the average cost support rates will be 87.68 percent and 65.18 percent, respectively, and the needed finances will be 2.5 billion won, 18.8 billion won, and 21.3 billion won in total. Conclusions: It seems most desirable to introduce a new model that combines flat-rate, fixed-rate, and subsidy cap systems and achieve an appropriate cost support rate through this model.

A Study on the Optimization of Power Supply Equipment for Plate Mill Plant in Steelworks (제철소 후판공장 전원공급설비의 용량 최적화에 관한 연구)

  • Ko, Hyun-Ok;Park, Ji-Ho;Kim, Dong-Wan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.9
    • /
    • pp.1300-1305
    • /
    • 2014
  • In this paper, we suggest an optimization method which can save about 5[%] of the cost though the optimizing of configuration and capacity for the facility. To achieve this goal, we compared the design data of the power, motor and drive system with the actual operation data of the plate mill plant in K-Steelworks. Therefore we measured the actual loading data by facilities considering the operating conditions of the plate mill plant in K-Steelworks, after that analyzed these data. In addition, we review the optimal capacity for transformer, switchgear and drive, and also reconfigured the electrical room and power single line diagram through the validation of motor data by equipment and the confirmation of process data considering the load characteristics. Consequently, the optimization method of capacity for the facilities shall have effectiveness in building new plate mill plant to further reduce costs at future.

The Effective Use of Basic Aviation Training Device (BATD) andthe Analysis of Flight Training Effectiveness (기본비행훈련장치(BATD)의 효율적 활용과 비행교육 효과 분석)

  • Jang, Dong Kwan;Kwon, Moonjin
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.30 no.3
    • /
    • pp.117-122
    • /
    • 2022
  • A method to increase the effectiveness of flight training at a low cost by applying the correct flight training method to students without flight experience is a very important factor. BATD equipped with an extended display device enables the proper cross-check of external references and internal instruments by integrated flight instruction methods, enabling effective flight training in the initial stages. In addition, BATD employs the Cessna 172 model with Glass Cockpit to help make it easy to apply to actual flights. As a result of analyzing the effect of flight training through a survey of students who completed the BATD practice lecture, it was very helpful to understand the theories related to flight that they had already learned, and they responded that they could easily adapt to all flight subjects in additional FTD practice lectures. Therefore, a well-planned BATD practice lecture will be easy to adapt to real flight training, which will have significant effects in reducing time and cost.

A study on the estimation of river water intake using the operating time of the pumping station (양수장의 가동시간을 이용한 하천수 취수량 산정방안 연구)

  • Baek, Jongseok;Kim, Chiyoung;Cha, Jun-Ho;Song, Jaehyun
    • Journal of Korea Water Resources Association
    • /
    • v.53 no.2
    • /
    • pp.89-96
    • /
    • 2020
  • Water management agencies under the Ministry of Environment produce and accumulate qualified basic data for major rivers. However, the integrated management of the river water has been weak since the artificial water circulation process, such as the intaking and drainage of agricultural water, has not been examined in the basin, which includes many agricultural land. In this study, a study was conducted on how the power usage method (operating time method) based on the running time can be applied and improved among indirect flow rate measurement methods used to investigate flow rates collected by the riverside for agricultural water purposes, and thus the resultant data of high reliability can be obtained at low cost. The operation time method is suitable for small-scale water pumping stations where it is difficult to secure real-time power supply data. The reliability of the data was verified through the correlation analysis with the actual flow rate, and it was found that the flow rate calculated by the operation time method reflecting the level of the stream to which the inlet of the pumping station is connected can be reasonably matched with the actual flow rate. In addition, it was confirmed that the investment cost at the time of initial installation of the facility was highly efficient by generating qualified flow data at low cost through comparison with direct flow rate measurement methods. If flow data is secured by applying the operation time method to large and small water farms located along the riverside, it is expected that more quantitative and integrated stream water management will be possible.

Safety and Economic Analysis by Applying HI-BEAM Technology (HI-BEAM 공법 적용 시 안전성 및 경제성 분석 연구)

  • Kim, sul min;Son, Kiyoung
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.2 no.1
    • /
    • pp.21-27
    • /
    • 2019
  • Hybrid & Integrated Beam (HI-BEAM), one of the composite systems, appears to have the advantage of high rigidity of reinforced concrete structures and long span of steel structures. In addition, because HI-BEAM makes the ends of beams from reinforced concrete, it is able to construct ideal composite construction method for effectively joining with reinforced concrete columns and can produce high-quality concrete structures without completing them in the field. Existing studies on the HI-BEAM method are mostly studies on structural aspects or epidemiological characteristics, or studies on the productivity and cost analysis of different structures through case studies, and analysis of actual construction methods is based on actual construction sites. In this study, the economic feasibility of the HI-BEAM method is verified by comparing the productivity and construction costs of the RC-BEAM method (RC-BEAM) method and the HI-BEAM method.

A Study on Business-Based Screen Design Techniques for Designing Efficient Applications

  • Kim, Tae-Woo;Park, Sun-Yi;Yeo, Jeong-Mo
    • Journal of Information Processing Systems
    • /
    • v.14 no.6
    • /
    • pp.1420-1430
    • /
    • 2018
  • To build a successful information system, design and development should be carried out from the enterprise perspective. A complicated business is represented in various ways as technology advances, and many development methodologies have been studied from the viewpoint of technology and development. Each domain is independently designed and developed from the enterprise perspective, but there would be inclusive parts due to the integrated process wherein the definition, design, and development of business are carried out, and the design is done based on the designer's experience. This study would like to address the technique of designing screens based on the business process of the applications derived from the business. It designs the screens that appear when actual applications are completed, including how the data transfer process in the derived business process is represented and operated on the relevant screens. It designs the screen which is displayed when the actual application is completed and how the data transfer process in the derived business process is represented and operated on the relevant screen. In addition, it designs the DFD representing the overall flow of data for each business to represent the movement procedure between screens in general. Through the design method proposed in this study, the client's requirement could be confirmed to reduce the cost for redevelopment, the problem of communication between designers and developers with various experiences could be reduced, and an efficient design procedure could be provided to persons who lack design experience.

A Study on Asset Valuation Method for Bridge Asset management (교량 자산관리를 위한 가치평가방법 및 체계수립에 관한 연구)

  • Lee, Min-Jae;Park, Kyung-Hoon;Park, Cheol-Woo;Sun, Jong-Wan;Lee, Dong-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.35-44
    • /
    • 2010
  • For efficient maintenance management of bridges, an establishment of asset management system is necessary which helps prediction of maintenance cost and strategic allocation of budget in consideration of top priority. The main purpose of this study is to suggest asset valuation method, which is practical in conformity with domestic situations, through researches on asset valuation method of bridges. This study has researched asset valuation method of bridge, which is appropriate for domestic situations by finding out advantages and disadvantages through investigating domestic and foreign application examples of asset valuation method for bridge facilities. In this study, asset valuation method by historical cost and replacement cost were suggested and a valuation model for bridges was established. In addition, two suggested valuation methods were applied to actual bridges which is used in Korea. As the result, it was analyzed that bridge asset valuation method in consideration of historical cost is desirable for the accounting purpose. And, it was analyzed that valuation method utilizing depreciated replacement cost(DRC), which could consider various factors, is desirable for the maintenance decision supporting purpose.

A Study on the Effects of Six Sigma Management on the Quality and Marketing Performances (6시그마 경영이 품질 및 마케팅 성과에 미치는 영향에 관한 연구)

  • Chang Hyung-Gul;Lee Yong-Hak
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.5
    • /
    • pp.185-212
    • /
    • 2005
  • The ultimate objectives of the six sigma activities are to raise quality of products to the level where customers can be satisfied and to improve marketing efficiency through cost reduction. Recently, many businesses have been struggling to find out the most successful way to implement the six sigma to produce better results. This study is significant in a way that it provides readers with an actual evidence of efficiency and effectiveness of six sigma activities in marketing performance for the first time. The major data of this study can be divided into two categories ; First, secondary data research method was utilized to find out the effects of six sigma management on the quality and marketing performances, theoretically and empirically. Second, test of established hypotheses relevant to the effects of six sigma management on the quality and marketing performance based on the propositions drawn from existing literatures, and test hypotheses statistically. This study of six sigma looked into benefits in manufacturing industry in terms of improving quality, cutting cost and decreasing defection product-defect rate. In addition, the study has verified that how the quality performances can affect the marketing performances, such as enhancing corporate image, sales increase and customer satisfaction. The author believes that this study will help many businesses acquire best methods to increase sales and profits. And, business manager will be able to understand where to focus as they proceed with the six sigma project and improve corporate competitiveness.

Development of Defect-Repair Method-Cost Mapping Algorithm of Concrete Bridge Using BMS Data (BMS 데이터를 활용한 콘크리트 교량의 결함-공법-비용 매핑 알고리즘 개발)

  • Lee, Changjun;Park, Wonyoung;Cha, Yongwoon;Jang, Young-Hoon;Park, Taeil
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.267-275
    • /
    • 2023
  • As aged infrastructures have been increased, the importance of accurate maintenance costs and proper budget allocation for infrastructure become prominent under limited resources. This study proposed a mapping algorithm between representative defects, repair methods, and the estimated maintenance costs for concrete bridges. In this regard, using BMS (Bridge Management System) data analysis, bridge repair methods were classified and matched with defects according to their locations, types, and sizes. In addition, the maintenance costs were estimated based on the amount of work-load and quantity per unit using CSPR (Cost Standard Production Rate). As a result, the level of accuracy was an average of 85.1 % compared with the actual bill of quantity for Seoul bridge maintenance. The accuracy of maintenance costs is expected to be enhanced by considering the various site conditions such as pier height, extra charge conditions, additional equipment, etc.