• Title/Summary/Keyword: Accumulated Cost

Search Result 232, Processing Time 0.022 seconds

Microstructure and Compositional Distribution of Selenized Cu(In,Ga)Se2 Thin Film Utilizing Cu2In3, CuGa and Cu2Se (Cu2In3, CuGa, Cu2Se를 이용한 전구체박막을 셀렌화하여 제조한 Cu(In,Ga)Se2 박막의 미세구조 및 농도분포 변화)

  • Lee, Jong-Chul;Jung, Gwang-Sun;Ahn, Byung-Tae
    • Korean Journal of Materials Research
    • /
    • v.21 no.10
    • /
    • pp.550-555
    • /
    • 2011
  • A high-quality CIGS film with a selenization process needs to be developed for low-cost and large-scale production. In this study, we used $Cu_2In_3$, CuGa and $Cu_2Se$ sputter targets for the deposition of a precursor. The precursor deposited by sputtering was selenized in Se vapor. The precursor layer deposited by the co-sputtering of $Cu_2In_3$, CuGa and $Cu_2Se$ showed a uniform distribution of Cu, In, Ga, and Se throughout the layer with Cu, In, CuIn, CuGa and $Cu_2Se$ phases. After selenization at $550^{\circ}C$ for 30 min, the CIGS film showed a double-layer microstructure with a large-grained top layer and a small-grained bottom layer. In the AES depth profile, In was found to have accumulated near the surface while Cu had accumulated in the middle of the CIGS film. By adding a Cu-In-Ga interlayer between the co-sputtered precursor layer and the Mo film and adding a thin $Cu_2Se$ layer onto the co-sputtered precursor layer, large CIGS grains throughout the film were produced. However, the Cu accumulated in the middle of CIGS film in this case as well. By supplying In, Ga and Se to the CIGS film, a uniform distribution of Cu, In, Ga and Se was achieved in the middle of the CIGS film.

Waste Disposal Models for Manufacturing Firm and Disposal Firm

  • Tsai, Chi-Yang;Nagaraj, Sugarla Edwin
    • Industrial Engineering and Management Systems
    • /
    • v.10 no.2
    • /
    • pp.115-122
    • /
    • 2011
  • This research considers a system containing a manufacturing firm who generates waste material during manufacturing process, and a disposal firm who collects and disposes the waste material. Identification of the optimal number of pick ups and the amount of waste to be disposed at certain period of time in terms of cost minimization is studied. Two types of waste accumulation rates, constant and linearly increasing, are discussed and mathematical models are developed. It can be shown that the results for these two different types of waste accumulation differ in a wide range because of the difference in the way of how waste is accumulated, which disturbs the storage cost. An integrated model is also developed and discussed in which both the manufacturing firm and the disposal firm benefit from the coordination between the two parties. It is shown that the optimal policy adopted by the integrated approach can provide a strong and consistent cost-minimizing effect for both the manufacturing firm and the disposal firm over the existing approach. Finally, all the models are verified by a numerical example and the results are compared.

Investigating the Cause of Hindrance to the Interfacial Bonding of INCONEL 718 Layer Deposited by Kinetic Spray Process (저온 분사 공정을 이용해 적층된 INCONEL 718의 계면접합 저해요인 분석)

  • Kim, Jaeick;Lee, Seungtae;Lee, Changhee
    • Journal of the Korean institute of surface engineering
    • /
    • v.48 no.6
    • /
    • pp.275-282
    • /
    • 2015
  • The cost for maintenance (replacement cost) of Ni-superalloy components in plant industry is very expensive because of high unit price of INCONEL 718. A development of repairing technology using kinetic spray process can be very helpful for reducing the maintenance cost. However, it is very difficult to produce well-deposited INCONEL 718 layer showing high interfacial bond strength via kinetic spraying. Thus, INCONEL 718 was deposited on SCM 440 substrate and the interfacial properties were investigated, in order to elucidate the cause of hindrance to the bonding between INCONEL 718 layer and SCM 440 substrate. As a result, it was revealed that the dominant obstacle to the interfacial bonding was excessive compressive residual stress accumulated in the coating layer, resulting from low plastic-deformation susceptibility of INCONEL 718. Nevertheless, the bonding state was enhanced by the post heat-treatment through relieving the residual stress and generating a diffusion/metallurgical bonding between the INCONEL 718 deposit and SCM 440 substrate.

A Study on the Change Factors by Activities for Estimating Historical Cost on Apartment Housing Projects (공동주택 실적공사비 산정시 공종별 변동요인에 관한 연구)

  • You, Yong-Hwan;Lee, Kyoo-Hyun;Kim, Chong-Woen;Choi, In-Seung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.4
    • /
    • pp.117-126
    • /
    • 2004
  • Construction industry is faced with the problems such as the quickly changeable circumstance and increasing construction companies due to regulation mollification of company registration. In order to overcome these problems, new estimation system based on historical estimation cost is ready to introduce by government step by step. But the time of transition for estimation system causes another problems such as chaos addition to simultaneity of a standard of estimation system and new estimation system, lack of related regulation, accumulation of historical extensive cost data, and adjustment methodology when historical estimation data is applied to next projects. The purpose of this study is to suggest the change factors by activities for estimating historical cost for apartment housing projects. New estimation system is based on historical construction data. For application of this system, the standard adjustment methodology system is necessary. and extensive cost data should be accumulated under an unified construction work classification system. Therefore in this study, according to the construction work classification system, every apartment housing project was classified to 16 work classifications, and 7 major composed items which occupy more than 85% of construction costs are analyzed by detailed activities and by average ratio and maximum ratio each of them. In the result of the study, furniture work, foundation work and masonry work are the works which have big gap of costs between average ration and maximum ratio. In addition to suggestion of change factor by work species, 5 qualified construction specialists are interviewed and change factors in 7 major works are analyzed.

Financial Burden of Cancer Drug Treatment in Lebanon

  • Elias, Fadia;Khuri, Fadlo R;Adib, Salim M;Karam, Rita;Harb, Hilda;Awar, May;Zalloua, Pierre;Ammar, Walid
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.17 no.7
    • /
    • pp.3173-3177
    • /
    • 2016
  • Background: The Ministry of Public Health (MOPH) in Lebanon provides cancer drugs free of charge for uninsured patients who account for more than half the total case-load. Other categories of cancer care are subsidized under more stringent eligibility criteria. MOPH's large database offers an excellent opportunity to analyze the cost of cancer treatment in Lebanon. Materials and Methods: Using utilization and spending data accumulated at MOPH during 2008-2013, the cost to the public budget of cancer drugs was assessed per case and per drug type. Results: The average annual cost of cancer drugs was 6,475$ per patient. Total cancer drug costs were highest for breast cancer, followed by chronic myeloid leukemia (CML), colorectal cancer, lung cancer, and Non-Hodgkin's lymphoma (NHL), which together represented 74% of total MOPH cancer drug expenditure. The annual average cancer drug cost per case was highest for CML ($31,037), followed by NHL ($11,566). Trastuzumab represented 26% and Imatinib 15% of total MOPH cancer drug expenditure over six years. Conclusions: Sustained increase in cancer drug cost threatens the sustainability of MOPH coverage, so crucial for socially vulnerable citizens. To enhance the bargaining position with pharmaceutical firms for drug cost containment in a small market like Lebanon, drug price comparisons with neighboring countries which have already obtained lower prices may succeed in lowering drug costs.

Sustainability of Spending and Adjustable Level of Consumption According to a Step-by-step Use of Retirement Assets : Focused on Overspending Households of Single Retired Elderly (자산의 단계적 사용에 따른 생활유지가능성과 조정가능 소비수준 : 초과지출을 하는 1인 은퇴노인가계를 대상으로)

  • Kim, Min-Jeung
    • Journal of Family Resource Management and Policy Review
    • /
    • v.16 no.4
    • /
    • pp.45-68
    • /
    • 2012
  • This study performed an analysis to determine if an individual can maintain the current consumption, in the case of a single retired elderly person's household using the accumulated assets. Assets are divided into three types, based on the behavioral economics life cycle hypothesis : financial assets, real assets excepting residential assets, and residential assets, and it is assumed that these assets were used on a step-by-step basis. Also, if the assets were sufficient, the maximum withdrawal amount was calculated. The results of the analysis are as follows. First, the monetary assets were sufficient to cover the cost of living for 2.7 years, 6.4 years by using the real assets of the non-occupied housing, and 26.3 years in the case of residential property. Second, in the case of preferentially using the financial assets, 4.4% of the sample households were able to cover the cost of living. Households that were not able to cover the cost of living used the next-stage assets, real assets of the non-occupied housing. Households that were not able to cover the cost of living by financial assets liquidated the real assets with the exception of residential assets and used these to cover the cost of living. A total of 4.8% of the households were able to maintain the current cost of living through the second stage and 25.5% supplemented their funds by using residential assets. That is to say, 35% of the sample households were able to maintain the current level of living by using their assets.

  • PDF

Stable Recovery Strategy According to Mobility of Mobile Host (모바일 호스트의 이동성에 따른 안정적인 복구 기법)

  • Choi Ca-Hyun;Hwang Byung-Yeon
    • Journal of Korea Multimedia Society
    • /
    • v.8 no.7
    • /
    • pp.953-960
    • /
    • 2005
  • The Network can be easily damaged in the mobile computing environment. Mobile Support Station (MSS) which supports the Mobile Host(MH) could also be unstable too. Therefore, when a critical error occurs the repairing cost can be high. For stable repair, the hand-off strategy should be considered to save the continuing message and checkpoint information, and to reduce the cost of network repair. In this paper, we propose the Switching Trickle(ST) strategy which reduces the repairing cost for the MH's mobility. ST strategy changes the way which stores the information in connection with the number of write events(r) that occur from the hands-off strategy. Accumulated cost by increased mobility has been simulated too. From the results of simulation, the proposed strategy has shown more cost effective than the conventional strategy. The proposed strategy also has shown very supportive in saving checkpoint and message log information stably.

  • PDF

Cost-Effective High-Altitude Scientific Balloon Development and its Flight Test (비용효율적인 고고도 과학기구 개발 및 비행시험)

  • Kang, Jungpyo;Shim, Gyujin;Kim, Hweeho;Lee, Yongseon;Yee, Kwanjung
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.46 no.4
    • /
    • pp.345-358
    • /
    • 2018
  • The high altitude scientific balloon has been used for decades in advanced aerospace countries such as United States, France, and Japan to carry out various research objectives. Since the initial cost for development and operation is enormous, it has been conducted by national research institutes. Recently, the advent of open source software/hardware ecosystems with low-cost yet high-performance have lowered barriers to enter into scientific balloon research and development. In this study, a zero pressure balloon prototype was designed considering the cost, usability, compatibility, and development period by using commercial off the shelf (COTS) items. In addition, the flight operation experience was accumulated through eight times of the flight tests, and operational reliability of the balloon system was verified. Finally, the foundation for the operation of the large zero pressure balloon was established.

A Study on the Estimation of the Contingency by the Regression Analysis on the Apartment (회귀분석을 통한 공동주택 공사예비비 산정에 관한 연구)

  • Lee Man-Hee;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.226-229
    • /
    • 2003
  • Construction manager must consider the possibility on the failure of the project in advance and the contingency to provide against the situation, those of which is a dangerous condition not to predict. If they have a quick decision without understanding the contingency, the over-cost in the total cost would be continuously accumulated, and be a barrier at a project going in progress. A various risk could not be coped with at a time to decide either going or sloping the project until the contingency is applied from the first step to progress the project. But a case to apply the contingency to the construction for the investment or the analysis of the project is a little. The process to evaluate it is also absent. The propose of this paper is the followed ; To establish the total cost including the risk first of all, devide into plus or minus factor of the cost, and then the process to calculate the contingency must be suggested by the regression analysis.

  • PDF

The Study on the System to Estimate the Cost by Using Regression in the Early Stage of the Project (공사 초기단계에서의 회귀분석을 이용한 최종공사비(EAC) 추정 방법)

  • Lee, Youn-Mi;Lee, Man-Hee;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.274-277
    • /
    • 2006
  • The EAC(Estimate at Completion) among existing methods, which estimate cost and time effectively, help managers anticipate changeable several results at the point of $15{\sim}30%$ in the project progress. However, this method may cause such some problems as not to consider the periodically changing circumstances caused by construction risks or uncertainties which can affect the cost and time in the project, and to regard collected and accumulated data only as a single value when predicting the results on the progress. Accordingly, it is very difficult to accept the even small range of variability based on the anticipation of EAC. Consequently, the study focuses on the possibility methodology to anticipate time and cost accurately on the way to utilize EVMS(Earned Value Management System), and also suggest the way to perform the right estimation of EAC as considering various risks and uncertainties in construction projects.

  • PDF