1 |
Anwar, M. F. and Nagi, R. (1997), Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups, International Journal of Production Research, 35, 1447-1470.
DOI
ScienceOn
|
2 |
Haase, K. (1994), Lotsizing and scheduling for production planning, Lecture Notes in Economics and Mathematical Systems, 408, Springer, Berlin.
|
3 |
Hillier, F. S. and Lieberman, G. J. (2002), Introduction to Operations Research, Seventh Edition, McGraw- Hill, New York, NY.
|
4 |
Hofmann, C. (1998), Investments in modern production technology and the flow-oriented EPQ-model, International Journal of Production Research, 54, 193-206.
DOI
ScienceOn
|
5 |
Hoque, M. A. and Goyal, S. K. (2000), An optimal policy for a single-vendor single-buyer integrated production- inventory system with capacity constraint of transport equipment, International Journal of Production Economics, 65, 305-315.
DOI
ScienceOn
|
6 |
Inderfurth, K. (1997), Simple optimal replenishment and disposal strategies for a product recovery system with leadtimes, OR Spectrum, 19, 111-122.
DOI
|
7 |
Ljunggren, M. (2000), Modelling national solid waste management, Waste Management, 18, 525-537.
DOI
|
8 |
Nahmias, S. (2001), Production and Operations Analysis, McGraw-Hill, New York, NY.
|
9 |
Ramasesh, R. V. (1990), Recasting the traditional inven tory model to implement just-in-time purchasing, Production and Inventory Management Journal, 31, 71-75.
|
10 |
Richter, K. (1996), The EOQ repair and waste disposal model with variable setup numbers, European Journal of Operational Research, 96, 313-324.
|