Journal of the Korea Academia-Industrial cooperation Society
/
v.11
no.10
/
pp.3911-3916
/
2010
In this paper we describe contents and results on running test for ATP on-board equipment, which has propelled as one of the research projects, so called, "Reliability assessment and operation technology development for Korean-type tilting trains" in order to ensure the safety and operation efficiency of tilting trains. We developed tilting trains for the speed-up of conventional lines and for the passenger service improvement where the KTX is not available. And we made progress the operation trial test in the 120,000 km distance with the use of ATS equipment, used in existing lines, for the purpose of the reliability assessment of the developed tilting trains. We decided to accelerate the speed for more than 200km/h with respect to the 6 existing lines including Jungang-line and Chungbuk-line where KTX has not operated. According to this decision, Train control system is to be changed from ATS to ATP. We should have installed an ATP on-board unit in tilting trains and verified the operational suitability, therefore we installed the same ATP on-board unit on tilting trains as that used in the ATP construction project on Gyeongbu-line and Honam-line, and verified that the function and performance of the installed ATP on-board unit conformed to the tilting trains operation.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.9
/
pp.6274-6281
/
2015
Radio-based train control system has driving headway shortening effect by real-time train interval control using two-way radio communication between onboard and wayside systems, and reduces facility investment because it does not require any track-circuit. Automatic train protection(ATP), the most significant part of the radio-based train control system, makes sure a safe distance between preceding and following trains, based on real-time train location tracing. In this paper, we propose the overall ATP train interval control algorithm to control the safe interval between trains, and preprocessing-based speed profile calculation algorithm to improve the processing speed of the ATP. The proposed speed profile calculation algorithm calculates the permanent speed limit for track and train in advance and uses as the most restrictive speed profile. If the temporary speed limit is generated for a particular track section, it reflects the temporary speed limit to pre-calculated speed profile and improves calculation performance by updating the speed profile for the corresponding track section. To evaluate the performance of the proposed speed profile calculation algorithm, we analyze the proposed algorithm with O-notation and we can find that it is possible to improve the time complexity than the existing one. To verify the proposed ATP train interval control algorithm, we build the train interval control simulator. The experimental results show the safe train interval control is carried out in a variety of operating conditions.
The Transactions of The Korean Institute of Electrical Engineers
/
v.59
no.10
/
pp.1803-1808
/
2010
Electric railway system consists of rolling stock, track, signal and catenary system. ATP system in railway signaling system is the important one grasping the position and velocity of a train. The wayside device of ATP system is installed between rails. Recently, the research about increasing train speed has been developed in total departments of the railroad systems. The study on the information transmission between on-board device and wayside device is required for increasing the train speed in the ATP system. When the train speed is increased as to same transmission distance, the problem on information transmission occurs because the transmission time is decreased. In case that the transmission distance is extended, the transmission time is decreased with respect to the train speed. Therefore, we have to define the standard magnetic field intensity as to the train speed in order to transmit correctly telegram. In this paper, the transmission distance for the telegram is suggested on the basis of the train speed. Also, the standard magnetic field intensity from the wayside device to on-board device is proposed by using transmission distance regarding the train speed in the ERTMS/ETCS system by using Matlab program. Also, BER according to the train speed is presented by calculating electric field intensity from the magnetic field intensity.
Journal of Dental Rehabilitation and Applied Science
/
v.36
no.1
/
pp.55-60
/
2020
The aim of this study was to investigate the change of microbial contamination levels in the different areas and at the different time points after application of a quaternary ammonium compound (QAC) that has mechanical antimicrobial effect. The microbial contamination levels were measured in three different areas; unit chair handle, spit sink area and hand piece holder at different time points using adenosine triphosphate (ATP) monitoring system and ATP surface test kit. Hand piece holder showed the highest level of microbial contamination. In most of the clinics, QAC significantly reduced the levels of microbial contamination, and maintained antimicrobial activity for 4 to 6 months. QAC may be used effectively in dental clinics due to the duration of antimicrobial effect and the minimal exposure of chemicals and further studies are needed with large sample size.
An asynchronous trigger processor (ATP) is a oftware system that processes triggers after update transactions to databases are complete. In an ATP, discrimination networks are used to check the trigger conditions efficiently. Discrimination networks store their internal states in memory nodes. TriggerMan is an ATP and uses Gator network as the .discrimination network. The changes in databases are delivered to TriggerMan in the form of tokens. Processing tokens against a Gator network updates the memory nodes of the network and checks the condition of a trigger for which the network is built. Parallel token processing is one of the methods that can improve the system performance. However, uncontrolled parallel processing breaks trigger processing semantic consistency. In this paper, we propose four trigger processing consistency levels that allow parallel token processing with minimal anomalies. For each consistency level, a parallel token processing technique is developed. The techniques are proven to be valid and are also applicable to materialized view maintenance.
본 논문은 고정폐색구간에서 차량운전 특성과 속도패턴이 다양한 다종의 열차들이 동일선로에서 복합되어 고밀도 운행을 위한 방법으로, 신호현시에 대한 제반정보를 차상으로 전송 받아 기관실 신호표시반에 신호를 현시 하는 차상신호방식(Cab Signalling System)중에서, 선행열차의 위치, 선로조건 등 지상의 상태정보를 후속열차가 수신하여 열차 자신의 제동특성 등 차량정보와 비교 분석하여 제동거리를 계산하는 distance to go 방식으로 열차운전속도를 제어하는 ATP (Automatic Train Protection) 시스템을 제안하였다. 폐색구간별 고정된 신호속도단계가 부여되는 ATC(Automatic Train Control) 시스템에서는 운행패턴이 같은 단일차종의 열차만 운행하는 구간에서는 일정속도에 의한 폐색구간 분할로 구간내 distance to go 신호체계가 이루어지지만, 차종과 속도패턴이 서로 상이한 복합열차들의 운행구간에서는 안전거리 확보를 위하여 저속열차의 제동거리를 기준으로 폐색구간 분할 및 속도결정이 이루어지므로 ATP 방식보다 운행효율이 다소 떨어짐을 알 수 있었다. 이를 차량특성과 속도패턴이 다른 3개의 열차를 모델로 하여 열차별 감속도에 의한 제동특성을 ATC와 ATP 신호제어체계에 접목시켜 시뮬레이션을 하였다.
The train control system is a facility to ensure safe train operation, and its safety is the most important factor for system introduction. Therefore, in order to improve practical usability in the business, safety analysis and evaluation of train control system and train control related core technologies are needed. Korea Railroad Research Institute has carried out standard development of radio-based train control system as a government research and development project. In this paper, we present a system specification of ATP, a core part of train control system, for standard system of Korean radio-based train control system(KRTCS). The paper present a operation environment and primary ATP functions, and functional requirement specifications.
This paper describes the design and implementation of the DMI display based on ERTMS specification for the Integrated Onboard Signaling System (IOSS). IOSS is consists of ATS, ATC, and ATP based on ERTMS/ETCS Level 1. We propose an improved DMI display design which has single layout concept for the IOSS. When a train is in the ATS, ATC, or ATP railway section, it is protected by the ATS, ATC, or ATP equipment, respectively. Therefore, DMI should display the different information according to the each signaling system. We design DMI display implemented as single layout for ATP, ATS and ATC information. This single layout display has a well integrated look and feel using the ERTMS specification and layout. This is for the driver to perceive the information easily and not to experience inconvenience resulting from the sense of difference when the train crossed into the different signaling section. Finally, we show the implementation result following this concept.
Kong, In Chul;Lee, So Ra;Ha, Kyoochul;Ko, Kyung-Seok
Journal of Soil and Groundwater Environment
/
v.20
no.4
/
pp.22-30
/
2015
For the preliminary investigations of the bioclogging on groundwater artificial recharge system, studies for conditions and analytical methods of biofilm formation on sediments were performed. Based on the tested results, following conditions were determined for biofilm formation on batch process: optimum period for biofilm formation (30 days), the proper inoculating water (pond water), medium (minimum salt medium with 0.1% yeast extract). Procedures for the measurement of ATP and DHA were also determined. Biomass extract was used for ATP measurement, while sediment itself for DHA. Effects of metals on the biofilm formation were investigated under the determined conditions. Different sensitivities and orders were found depending on tested metals and measurement methods. In general, biomass measurement by ATP and viable cell count showed higher sensitivity than that of DHA. Following toxicity orders were also appeared for ATP and viable cell: Cu ≈ Cd > As(III).
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.