In this paper, We proposed a robust blind digital watermarking algorithm using variance and DCT domain. The proposed method embedded watermark signals into DC components of $8{\times}8$ block DCT using valiance, texture regions and smooth regions. In the digital watermarking algorithms using DCT domain, more robustness can be achieved if watermarks are embedded in DC components since DC components have much larger perceptual capacity than AC components. Experiment showed that robustness of the proposed method better than that of the conventional methods in JPEG quality and scaling attack.
The Transactions of The Korean Institute of Electrical Engineers
/
v.66
no.9
/
pp.1437-1443
/
2017
Electric energy is consumed or regenerated according to an operation of electric rail cars in urban railway power substations. A thyristor dual converter system is used to deal with the electric energy. Since the AC input voltage of power substations is $22.9kV{\pm}10%$, the magnitude of the AC voltage fluctuates according to load conditions, so the secondary side voltage of the DDY transformer also fluctuates. In the thyristor dual converter, the response characteristics of the DC output voltage and the DC output current are changed based on an initial firing angle in the cross mode conversion between the forward mode and the reverse mode. Therefore, this paper proposes the initial firing angle tracking algorithm considering fluctuation of the AC input voltage. The effectiveness of the proposed algorithm is verified by a simulation compared with the conventional algorithm.
Digital load is increasing suddenly for various reasons, such as easy control and management. Accordingly, a consumption pattern of load is becoming DC. However, the power supply is supplied by AC power. The load power supply substantially needs DC power. AC power has to be converted to DC power. Renewable energy sources like solar, wind, fuel cells are DC power generation, but the transfer needs to through by AC power, thus DC power has to be converted to AC power. Resultantly, a multi-stage conversion loss is constantly increasing. The power distribution system of DC-based is required for effective use of these energy sources. This requires a DC load, as well as is necessary to develop DC ELCB which are able to detect DC leakage current for implementing protection. In this study, it realize detection algorithm about DC leakage current to verify the performance of the sensor and apply it to the ELCB which is based on DC. Therefore, it is expected to protect operating of DC power distribution system.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.20
no.5
/
pp.25-32
/
2006
This paper proposes a regeneration inverter system, which can regenerate the excessive power form do bus line to ac source for traction system. The proposed regeneration inverter system for dc traction can reduce harmonics which are included to ac current source. The regeneration inverter is operated as two modes. In the regeneration inverter mode, it can recycle regenerative energy caused by decelerating tractions and in the active power filter mode, it can compensate harmonic distortion produced by the rectifier substation. In this paper, the regeneration inverter uses PWM DC/AC inverter algorithm and the active power filter uses p-q theory. From the informative simulation and experimental results, which are performed wiith a prototype rated 3.7[kw], it can expected that the proposed system can be effectively applied in the real traction system rated 100[kw].
In this paper, we propose the development of a power conversion system for electric power take-off (e-PTO) of agricultural electric vehicles. Most e-PTOs use commercial power $220V_{AC}$. A bidirectional power conversion system having a two-stage structure consisting of a DC-DC converter and a DC-AC inverter for supplying a high output voltage using a low battery voltage of an agricultural electric vehicle is suitable. we propose a power conversion system consisting of the one-stage dual active bridge (DAB) converter and the two-stage bidirectional full bridge inverter. In addition, we propose a soft start algorithm for reducing the inrush current generated by the link capacitor charging during the initial operation. A 3kW prototype system and its corresponding algorithms have been implemented to verify its effectiveness through experiments.
In this paper we proposed an output voltage regulation scheme of a single-phase PWM inverter used to obtain a 400 Hz sinusoidal AC voltage for an aircraft. The fuzzy-inference control scheme is designed to achieve good output voltage tracking in the presence of load change or parameter variations. The PWM gate signals are determined by the fuzzy-inference controller using the error between the reference voltage and the feedback voltage and the derivative of error. The tracking performance of.
The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.11
no.1
/
pp.39-47
/
1997
본 논문에서는 퍼지제어기와 신경회로망 적응 관측기를 적용하여 강인성을 AC드라이브 시스템을 제안하였다. 퍼지제어기는 유도전동기의 속도 제어시 빠른 속도 응답 특성을 얻기 위하여 사용하였다. 신경회로망 적응관측기는 전동기 파라메터 변화에 대하여 강인한 제어 시스템이 되도옥 자속 관측기오 토오크 적응관측기로 구성하였다. 사용된 신경회로망은 자속과 토오크의 동특성을 학습시키기 위하여 역전파 알고리즘을 사용하였따. 컴퓨터 시뮬레이션의 결과를 통해 제안된 시스템이 전동기 파라메터 변동과 부화이론에 강인하고 속도응답 특성이 우수함을 입증하였다.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.57
no.2
/
pp.102-108
/
2008
AC generator plays an important role of power system. The large AC generator fault may lead to large impacts or perturbations in power system. And then the protection of a generator has very important role in maintaining stability in a power system. In present, the DFT(discrete Fourier transform) based RDR(ratio differential relay) had been widely applied to a internal fault of a generator stator winding. But DFT has a serious drawback. In the course of transforming a target signal to frequency domain, time information is lost. DWT uses a time-scale region. This paper proposes an advanced fault detection algorithm using DWT(discrete Wavelet transform) to enhance the drawback of conventional DFT based relaying. To evaluate the performance of the proposed relaying, we used the test data which were sampled with 720 [Hz] per cycle and obtained from ATP(alternative transient program) simulation. And we made a comparative study of conventional DFT based RDR and the proposed relaying.
신재생 에너지를 포함한 마이크로그리드가 활성화 되면서 한 장소에 DC 전력과 AC 전력이 혼재하여 서로 연관이 되는 경우가 빈번히 발생하고 있다. 이 경우 PMS(Power management system) 측에서 AC 전력뿐만 아니라 DC 전력에 대한 정보요구가 증대되고 있다. 따라서 본 연구에서는 AC 전력 및 DC 전력을 동시에 계측할 수 있는 마이크로 그리드용 원격 전력계측기를 개발하여 그 성능을 검증하였다. 또한 전력계 사용 시 결선방식과 전류 상을 자동으로 인식하는 방식을 제안하여 일반인도 쉽게 전력계측을 할 수 있는 알고리즘을 제안하였다.
본 논문에서는 입력 직류링크 전해 캐패시터와 power factor correction(PFC) 회로 없이 고효율과 고역률을 갖는 단일 전력 변환 직렬 공진형 AC-DC 컨버터를 제안한다. 제안된 컨버터의 1차측은 절연형 single-ended primary-inductor converter(SEPIC) 컨버터와 스위치의 서지 전압을 최소화하고 영전압스위칭을 위한 능동 클램프 회로로 구성되어 있다. 2차측은 큰전압 이득을 위한 배전압 회로로 구성되어 있으며 직렬 공진을 이용하여 다이오드의 영전류 스위칭을 달성함으로써 역방향 회복 문제를 해결 할 수 있다. 또한 별도의 PFC 회로와 입력 직류링크 전해 캐패시터 없이 제안된 역률개선 제어 알고리즘을 이용하여 간단한 구조로 고역률을 달성할 수 있다. 본 논문에서는 제안된 회로의 이론적 해석 및 시작품의 실험을 수행하여 타당성을 검증하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.