• Title/Summary/Keyword: A-Pillar

Search Result 551, Processing Time 0.035 seconds

Post-pillars design for safe exploitation at Trepça hard rock mine (Kosovo) based on numerical modeling

  • Ibishi, Gzim;Genis, Melih;Yavuz, Mahmut
    • Geomechanics and Engineering
    • /
    • v.28 no.5
    • /
    • pp.463-475
    • /
    • 2022
  • In the mine exploitation stage; one of the critical issues is the stability assessment of post-pillars. The instability of post-pillars leads to serious safety hazards in mining operations. The focus of this study is to assess the stability of post-pillars in the 130# stope in the central ore body at Trepça hard rock mine by employing both conventional (i.e., critical span curve) and numerical methods (i.e., FLAC3D). Moreover, a new numerical based index (i.e., Pillar Yield Ratio-PYR) was proposed. The aim of PYR index is to determine a border line between stable, potentially unstable, and failure state of post-pillars at a specific mine site. The critical value of pillar width to height ratio is 2.5 for deep production stopes (e.g., > 800 m). Results showed that pillar size, mining height and mining depth significantly have affected the post-pillar stability. The reliability of numerical based index (i.e., PYR) is verified based on empirical underground pillar stability graph developed by Lunder, 1994. The proposed pillar yield ratio index and pillar stability graph can be used as a design tool in new mining areas at Trepça hard rock mine and for other situations with similar geotechnical conditions.

Analysis of Electrical Characteristics According to the Pillar Spacing of 4.5 kV Super Junction IGBT (4.5 kV급 Super Junction IGBT의 Pillar 간격에 따른 전기적 특성 분석)

  • Lee, Geon Hee;Ahn, Byoung Sup;Kang, Ey Goo
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.33 no.3
    • /
    • pp.173-176
    • /
    • 2020
  • This study focuses on a pillar in which is implanted a P-type maneuver under a P base. This structure is called a super junction structure. By inserting the pillar, the electric field concentrated on the P base is shared by the pillar, so the columns can be dispersed while maintaining a high breakdown voltage. Ten pillars were generated during the multi epitaxial process. The interval between pillars is varied to optimize the electric field to be concentrated on the pillar at a threshold voltage of 6 V, a yield voltage of 4,500 V, and an on-state voltage drop of 3.8 V. The density of the filler gradually decreased when the interval was extended by implanting a filler with the same density. The results confirmed that the size of the depletion layer between the filler and the N-epitaxy layer was reduced, and the current flowing along the N-epitaxy layer was increased. As the interval between the fillers decreased, the cost of the epitaxial process also decreased. However, it is possible to confirm the trade-off relationship that deteriorated the electrical characteristics and efficiency.

TCAD Simulation of Silicon Pillar Array Solar Cells

  • Lee, Hoong Joo
    • Journal of the Semiconductor & Display Technology
    • /
    • v.16 no.1
    • /
    • pp.65-69
    • /
    • 2017
  • This paper presents a Technology-CAD (TCAD) simulation of the characteristics of crystalline Si pillar array solar cells. The junction depth and the surface concentration of the solar cells were optimized to obtain the targeted sheet resistance of the emitter region. The diffusion model was determined by calibrating the emitter doping profile of the microscale silicon pillars. The dimension parameters determining the pillar shape, such as width, height, and spacing were varied within a simulation window from ${\sim}2{\mu}m$ to $5{\mu}m$. The simulation showed that increasing pillar width (or diameter) and spacing resulted in the decrease of current density due to surface area loss, light trapping loss, and high reflectance. Although increasing pillar height might improve the chances of light trapping, the recombination loss due to the increase in the carrier's transfer length canceled out the positive effect to the photo-generation component of the current. The silicon pillars were experimentally formed by photoresist patterning and electroless etching. The laboratory results of a fabricated Si pillar solar cell showed the efficiency and the fill factor to be close to the simulation results.

  • PDF

Optimum Design of a Center-pillar Model with a Simplified Side Impact Analysis (단순 측면충돌해석에 의한 센터필러의 최적설계)

  • Bae GiHyun;Song JungHan;Huh Hoon;Kim SeHo
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.13 no.6
    • /
    • pp.84-92
    • /
    • 2005
  • This paper is concerned with optimum design of a center-pillar assembly induced by the high-speed side impact of the vehicle. In order to simulate deformation behavior of the center-pillar assembly, simplified finite element model of the center-pillar and a moving deformable barrier are developed based on results of the crash analysis of a full vehicle model. In optimization of the deformation shape of the center-pillar, S-shaped deformation is targeted to guarantee reduction of the injury level of a driver dummy in the crash test. Tailor-welded blanks are adopted in the simplified center-pillar model to control the deformation shape of the center-pillar assembly. The thickness of each part which constitutes the simplified model is selected as a design parameter. The thickness of parts which have significant effect on the deformation mechanism are selected as design parameters with sensitivity analysis based on the design of experiment technique. The objective function is constructed so as to minimize the weight and lead to an S-mode deformation shape. The result shows that the simplified model can be utilized effectively for optimum design of the center-pillar members with remarkable saving of computing time.

Design of Unsupported Rock Pillars in a Room-and-Pillar Underground Structure by the Tributary Area Method and the Pillar Strength Estimation (지류론과 암주 강도의 추정에 의한 주방식 지하구조의 무지보 암주 설계)

  • Chang, Soo-Ho;Lee, Chulho;Choi, Soon-Wook;Hur, Jinsuk;Hwang, Jedon
    • Tunnel and Underground Space
    • /
    • v.24 no.5
    • /
    • pp.335-343
    • /
    • 2014
  • Room-and-pillar mining method is one of the most popular underground mining method in the world. If the room-and-pillar mining method is able to be adopted in civil works, it would be highly probable to reduce underground construction costs and to expand a underground structure in use. Therefore, this study aims to analyze the design procedure of unsupported rock pillars which are indispensable to ensure the stability of a room-and-pillar underground structure. Parametric studies on their key design parameters are also carried out for 125 different kinds of design conditions. From the study, the width of a rock pillar is found to show a linear relationship with its corresponding safety factor. The safety factor of a unsupported rock pillar decreased drastically like a negative exponential function as the ratio of room width to pillar width increases in the same rock strength condition. Based on the parametric studies, a design chart to simply evaluate the geometric design parameters of a unsupported rock pillar satisfying a design safety factor is also proposed in this study.

A Case Study on the Structural Safety Evaluation of a building with Adversiting Pillar Tower (광고탑이 설치된 건축 구조물의 구조안전성 평가에 관한 사례 연구)

  • 은충기;채원규;손영현
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 1998.11a
    • /
    • pp.147-152
    • /
    • 1998
  • In this thesis, the structural safety evaluation of a building with adversiting pillar tower were studied. From the structural analysis results of a building with adversiting pillar tower, the bending stress, the shearing stress and the axial stress were calculated, and these member forces were applied to the structural safety evaluation of a building with adversiting pillar tower.

  • PDF

Optimization of 1-3 Type Piezocomposite Structures Considering Inter-Pillar Vibration Modes (Inter-Pillar 진동 모드를 고려한 1-3형 압전복합체의 구조 최적화)

  • Pyo, Seonghun;Kim, Jinwook;Roh, Yongrae
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.26 no.6
    • /
    • pp.434-440
    • /
    • 2013
  • With polymer properties and ceramic volume fraction as design variables, the optimal structure of 1-3 piezocomposites has been determined to maximize the thickness mode electromechanical coupling factor. When the piezocomposite vibrates in a thickness mode, inter-pillar resonant modes are likely to occur between lattice-structured piezoceramic pillars and polymer matrix, which significantly deteriorates the performance of the piezocomposite. In this work, a new method to design the structure of the 1-3 type piezocomposite is proposed to maximize the thickness mode electromechanical coupling factor while preventing the occurrence of the inter-pillar modes. Genetic algorithm was used for the optimal design, and the finite element analysis method was used for the analysis of the inter-pillar mode.

Thermal Cycling and High Temperature Storage Reliabilities of the Flip Chip Joints Processed Using Cu Pillar Bumps (Cu Pillar 플립칩 접속부의 열 싸이클링 및 고온유지 신뢰성)

  • Kim, M.Y.;Lim, S.K.;Oh, T.S.
    • Journal of the Microelectronics and Packaging Society
    • /
    • v.17 no.3
    • /
    • pp.27-32
    • /
    • 2010
  • For the flip chip joints processed using Cu pillar bumps and Sn pads, thermal cycling and high temperature storage reliabilities were examined as a function of the Sn pad height. With increasing the height of the Sn pad, which composed of the flip chip joint, from 5 ${\mu}m$ to 30 ${\mu}m$, the contact resistance of the flip chip joint decreased from 31.7 $m{\Omega}$ to 13.8 $m{\Omega}$. Even after thermal cycles of 1000 times ranging from $-45^{\circ}C$ to $125^{\circ}C$, the Cu pillar flip chip joints exhibited the contact resistance increment below 12% and the shear failure forces similar to those before the thermal cycling test. The contact resistance increment of the Cu pillar flip chip joints was maintained below 20% after 1000 hours storage at $125^{\circ}C$.

Study on the Intermetallic Compound Growth and Interfacial Adhesion Energy of Cu Pillar Bump (Cu pillar 범프의 금속간화합물 성장과 계면접착에너지에 관한 연구)

  • Lim, Gi-Tae;Kim, Byoung-Joon;Lee, Ki-Wook;Lee, Min-Jae;Joo, Young-Chang;Park, Young-Bae
    • Journal of the Microelectronics and Packaging Society
    • /
    • v.15 no.4
    • /
    • pp.17-24
    • /
    • 2008
  • Thermal annealing and electromigration test were performed at $150^{\circ}C$ and $150^{\circ}C,\;5{\times}10^4\;A/cm^2$ conditions, respectively, in order to compare the growth kinetics of intermetallic compound(IMC) in Cu pillar bump. The quantitative interfacial adhesion energy with annealing was measured by using four-point bending strength test in order to assess the effect of IMC growth on the mechanical reliability of Cu pillar bump. Only $Cu_6Sn_5$ was observed in the Cu pillar/Sn interface after reflow. However, $Cu_3Sn$ formed and grew at Cu pillar/$Cu_6Sn_5$ interface with increasing annealing and stressing time. The growth kinetics of total($Cu_6Sn_5+Cu_3Sn$) IMC changed when all Sn phases in Cu pillar bump were exhausted. The complete consumption time of Sn phase in electromigration condition was faster than that in annealing condition. The quantitative interfacial adhesion energy after 24h at $180^{\circ}C$ was $0.28J/m^2$ while it was $3.37J/m^2$ before annealing. Therefore, the growth of IMC seem to strongly affect the mechanical reliability of Cu pillar bump.

  • PDF

A Study on the Stress Distribution of Pillar Basement during Two-arch Tunnel Excavation in Discontinuous Rock Mass (불연속성 암반에서 2-아치 터널 굴착시 필러 기초부 응력 분포에 대한 연구)

  • Kim, Hong-Moon;Lee, Sang-Duk
    • Tunnel and Underground Space
    • /
    • v.19 no.2
    • /
    • pp.123-131
    • /
    • 2009
  • Large scale model tests and numerical analyses were performed in order to investigate the stress distribution on the base of pillar during two-arch tunnel excavation in the regularly jointed rocks. It was observed that the stress was irregularly distributed on pillar and the angle of discontinuities seriously influenced on the stress distribution on the pillar base in the discontinuous rock mass. In the numerical analyses results, It was shown that the stress level of pillar was greatly changed depending on the excavation sequences of two-arch tunnel. It was also observed that stress distributed eccentrically at the pillar as well as at the base of pillar. It is necessary to consider this point for the design of two-arch tunnel.