• Title/Summary/Keyword: 4D scheduling

Search Result 62, Processing Time 0.023 seconds

An Analysis of Factors Affecting Satisfaction of Physical Therapy Patients (물리치료 내원환자의 만족도에 영향을 미치는 요인 분석)

  • Sohn, Ae-Ree;Kim, Mi-Won
    • Journal of Korean Physical Therapy Science
    • /
    • v.9 no.4
    • /
    • pp.63-72
    • /
    • 2002
  • Patient satisfaction is an important factor in evaluating the quality of care. Patient satisfaction may be used to evaluate provider services and facilities, and used to predict the patient returns to a facility. The patients d whether the patient returns to a facility or whether the patient recommends the facility to other people may be affected by a variety of factors of patient satisfaction. Low satisfaction may result in poor compliance with the potential of waste of resources and suboptimal clinical outcome. This study is to identify factors of patient satisfaction that will affect patients decision whether the patient returns or not. A self-administered questionnaire survey was conducted in Seoul, Chung-Joo and Bu-Cheon cities, Survey data was obtained from 743 patients who visited the physical therapy practice at university hospitals, general hospitals and clinics. Response rate was 94.4%. The instrument developed by Goldstein et al. (2000) was used and translated into Korean. Several items were added to the instrument. Patient's opinions of service in each domain measured using 5-point Likert-type scales that ranged from strongly disagree to strongly agree. A multiple-regression analytic approach was used to predict overall satisfaction of physical therapy. Age, kindness, scheduling, convenience of parking, privacy, and waiting time predicted the overall satisfaction of physical therapy. The older patients had higher level of satisfaction with physical therapy compared with the younger patients. Patient satisfaction were more affected by access (scheduling and waiting time), administrative technical management (convenience of parking), and interpersonal management (kindness of physical therapists and other staffs) than clinical technical management (physical therapists' skills).

  • PDF

Performance Comparison of Discrete Particle Swarm Optimizations in Sequencing Problems (순서화 문제에서 01산적 Particle Swarm Optimization들의 성능 비교)

  • Yim, D.S.
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.4
    • /
    • pp.58-68
    • /
    • 2010
  • Particle Swarm Optimization (PSO) which has been well known to solve continuous problems can be applied to discrete combinatorial problems. Several DPSO (Discrete Particle Swarm Optimization) algorithms have been proposed to solve discrete problems such as traveling salesman, vehicle routing, and flow shop scheduling problems. They are different in representation of position and velocity vectors, operation mechanisms for updating vectors. In this paper, the performance of 5 DPSOs is analyzed by applying to traditional Traveling Salesman Problems. The experiment shows that DPSOs are comparable or superior to a genetic algorithm (GA). Also, hybrid PSO combined with local optimization (i.e., 2-OPT) provides much improved solutions. Since DPSO requires more computation time compared with GA, however, the performance of hybrid DPSO is not better than hybrid GA.

An efficient Uplink Scheduling Scheme and Performance Analysis of MAC Layer fer VoIP Service in IEEE 802.16j System (IEEE802.16j System의 VoIP 서비스를 위한 MAC Layer에서 효율적인 업링크 스케줄링 기법 및 성능 분석에 관한 연구)

  • Lee, Seung-Do;Lee, Tae-Jin
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2007.10d
    • /
    • pp.602-607
    • /
    • 2007
  • 최근 4G 이동통신 시스템의 진화를 위한 단계로 기존의 이동통신 시스템을 유지하면서 효율 극대화를 통한 비용 절약 측면과 고 주파수 대역을 이용한 셀 간격의 협소화로 인해 나타나는 문제점에 대한 대안으로 커버리지 확대와 데이터 처리율 향상을 위한 IEEE 802.16j 표준화 작업이 진행 중에 있다. 향후 VoIP 서비스를 위한 업링크 스케줄링 기법으로 몇 가지가 IEEE 802.16j에 제시되어 있으나, 본 논문에서는 보이스 트래픽 특성 및 수학적 모델링을 통하여 기존 방법들보다 더 효율적인 대역 이용을 통해 같은 대역폭 대비 성능과 용량 면에서 개선된 스케줄링 기법인 eertPS를 제시하여 IEEE 802.16j Multi-Hop 환경하에서도 대역 효율적인 VoIP 서비스를 이용할 수 있도록 한다.

  • PDF

Full-Search Block-Matching Motion Estimation Circuit with Hybrid Architecture for MPEG-4 Encoder (하이브리드 구조를 갖는 MPEG-4 인코더용 전역 탐색 블록 정합 움직임 추정 회로)

  • Shim, Jae-Oh;Lee, Seon-Young;Cho, Kyeong-Soon
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.46 no.2
    • /
    • pp.85-92
    • /
    • 2009
  • This paper proposes a full-search block-matching motion estimation circuit with hybrid architecture combining systolic arrays and adder trees for an MPEG-4 encoder. The proposed circuit uses systolic arrays for motion estimation with a small number of clock cycles and adder trees to reduce required circuit resources. The interpolation circuit for 1/2 pixel motion estimation consists of six adders, four subtracters and ten registers. We improved the circuit performance by resource sharing and efficient scheduling techniques. We described the motion estimation circuit for integer and 1/2 pixels at RTL in Verilog HDL. The logic-level circuit synthesized by using 130nm standard cell library contains 218,257 gates and can process 94 D1($720{\times}480$) image frames per second.

4D BIM based Workspace Planning Process in Building Construction Project (4D BIM 기반의 건설프로젝트 작업공간 계획 프로세스)

  • Choi, Byungjoo;Lee, Hyun-Soo;Park, Moonseo;Kim, Hyunsoo;Hwang, Sungjoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.175-187
    • /
    • 2013
  • Each participant in building construction project requires their own workspace to execute their activities. In this environment, inappropriate workspace planning in construction site causes workspace conflicts which result in a loss of productivity, safety hazard and poor-quality issues. Therefore, workspace should be regarded as one of the most important resources and constraints have to be managed at construction site. However, current construction planning techniques such as Gantt chart, network diagram and critical path method have proven to be insufficient to workspace planning. This paper contains formalized process for workspace planning in 4D BIM environment to prevent workspace related problems in construction project. The proposed process in this paper represents workspace occupation status for each activity and suitable solutions for identified workspace conflicts by integrating workspace attributes and activity execution plan. Based on the result of this study, project manager will be able to prevent probable workspace conflicts and negative effect on project performance by devising appropriate workspace plan during preconstruction phase.

A High Speed 2D-DWT Parallel Hardware Architecture Using the Lifting Scheme (Lifting scheme을 이용한 고속 병렬 2D-DWT 하드웨어 구조)

  • 김종욱;정정화
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.40 no.7
    • /
    • pp.518-525
    • /
    • 2003
  • In this paper, we present a fast hardware architecture to implement a parallel 2-dimensional discrete wavelet transform(DWT)based on the lifting scheme DWT framework. The conventional 2-D DWT had a long initial and total latencies to get the final 2D transformed coefficients because the DWT used an entire input data set for the transformation and transformed sequentially The proposed architecture increased the parallel performance at computing the row directional transform using new data splitting method. And, we used the hardware resource sharing architecture for improving the total throughput of 2D DWT. Finally, we proposed a scheduling of hardware resource which is optimized to the proposed hardware architecture and splitting method. Due to the use of the proposed architecture, the parallel computing efficiency is increased. This architecture shows the initial and total latencies are improved by 50% and 66%.

Novel SINR-Based User Selection for an MU-MIMO System with Limited Feedback

  • Kum, Donghyun;Kang, Daegeun;Choi, Seungwon
    • ETRI Journal
    • /
    • v.36 no.1
    • /
    • pp.62-68
    • /
    • 2014
  • This paper presents a novel user selection method based on the signal-to-interference-plus-noise ratio (SINR), which is approximated using limited feedback data at the base stations (BSs) of multiple user multiple-input multiple-output (MU-MIMO) systems. In the proposed system, the codebook vector index, the quantization error obtained from the correlation between the measured channel and the codebook vector, and the measured value of the largest singular value are fed back from each user to the BS. The proposed method not only generates precoding vectors that are orthogonal to the precoding vectors of the previously selected users and are highly correlated with the codebook vector of each user but also adopts the quantization error in approximating the SINR, which eventually provides a significantly more accurate SINR than the conventional SINR-based user selection techniques. Computer simulations show that the proposed method enhances the sum rate of the conventional SINR-based methods by at least 2.4 (2.62) bps/Hz when the number of transmit antennas and number of receive antennas per user terminal is 4 and 1(2), respectively, with 100 candidate users and an SNR of 30 dB.

MECHAINSED RICE SHARE FARMING IN PERMATANG PAUH SEBERANG PERAI,MALAYSIA-A MANAGEMENT EXPERIENCE

  • Hussain, M.D
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 1993.10a
    • /
    • pp.538-545
    • /
    • 1993
  • Individual farming involving small land parcel (0.5 to 1.0ha) is declining because it is uneconomic and unable to incorporate modern technological innovation to improve its production efficiency. A centrally managed medium scale mechanised rice share farming was implemented at Permatang Pauh, Sebeerang Perai, Malaysia in 1988-1991 for eight seasons on a contiguous 57 ha rice land rented from 100 owners. Ten participants were chosen to participate in this project which perpetuated from revolving fund of MR 165.000. The objective of the project was to overcome problem of production efficiency and to provide a stable income to farmers operating on a medium and full time basis. Mechanisation was given prime emphasis to optime and reduce labour requirement and meeting the targeted crop scheduling. Direct seeding and mechanical transplanting methods of crop establishment were adopted. Land preparations, crop establishment and crop care were done using machineries purchased by the group. Selected participants were trained to operate machineries which composed 2 and 4 wheel tractors, mechanical transplanters, motorised seeders and sprayers. Harvesting and transportation of rice to the mills were done on contractual basis using combine harvesters and bulk handling via 3-4 ton lorries respectively. The net clean yield (less 10-20 percent deduction at rice mills) obtained in such project has contributed to stabilise the production and income of participating farmers.

  • PDF

Study on Trajectory Prediction Accuracy Analysis Method for Performance Improvement of a Trajectory Prediction Module of Arrival Manager (도착관리시스템 궤적 예측 모듈의 성능 개선을 위한 궤적 예측 정확도 분석 방법 연구)

  • Oh, Eun-Mi;Kim, Hyounkyoung;Eun, Yeonju;Jeon, Daekeun
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.23 no.3
    • /
    • pp.28-34
    • /
    • 2015
  • An analysis method of trajectory prediction has been suggested and the developed trajectory prediction module, which is an important functional component of the Arrival Manager (AMAN) of Jeju airport, has been tested by applying the suggested method. The objective of this method is to improve prediction performance of the trajectory prediction module. The trajectory prediction module predicts the trajectories based on the real-time track data and flight plans. Therefore, the suggested analysis method includes the simulation framework which is based on real-time playback, recording, and graphic display systems for testing. Besides, the definition of time error, which is a important index for the time based scheduling system, such as AMAN, is included in the suggested analysis method. An example of arrival time prediction accuracy improvement through the suggested analysis method has also been presented.

A Study on the Government's R&D Budgeting Evaluation System in Korea (과학기술혁신체제 하에서의 국가연구개발 평가 시스템 개선에 관한 연구 : 연구개발 예산평가 시스템을 중심으로)

  • Bark, Pyeng-Mu;Lee, Ki-Jong
    • Journal of Korea Technology Innovation Society
    • /
    • v.12 no.4
    • /
    • pp.819-839
    • /
    • 2009
  • Proposed increases to the government's R&D budget should be discussed based on merits of meeting efficiency and effectiveness criteria. The evaluation of the national R&D budget and related programs are performed in two areas: a system of R&D budget coordination and allocation, and a system of R&D program performance. This paper mainly focuses on the operational areas of R&D budget evaluation system with a focus on their impact to efficiency and effectiveness. The core view point for a R&D budget evaluation system involves two directions: Firstly, to detail the relationships between the later stage (ex. post) activities such as, program survey, analysis, and program performance evaluation, with the budget evaluation. Secondly, to critically oversee all R&D coordination procedures with a different perspective. Budgeting is generally known as a serial process of policy making, planning and executing. It is highly desirable for the budget to be allocated to, and spent by, specific programs as planned, and that each plan be aligned with a specific policy. As such, a strong relevance between the program structure and budget code system is integral to successful execution. It should be performed using a decision making system which closely examines the link between policy and budget. It is also recommended that systematic relationships be maintained among budget coordination and allocation, performance evaluations of policy and program levels, and program survey and analysis system, and that their operational schedule should be reviewed comprehensively as a one integrated system. The National Science and Technology Council is expected to play a major and practical role as the center of policy planning and should be supported by the objective and unbiased system which covers overall process from policy making to program evaluation. Finally, increased utilization of contents, timely program survey and analysis, and accurate of activity scheduling of budget coordination and allocation, and diligent program performance evaluation all contribute towards a more efficient and effective overall evaluation system.

  • PDF