• Title/Summary/Keyword: 3D construction

Search Result 2,821, Processing Time 0.032 seconds

Upgrading flexural performance of prefabricated sandwich panels under vertical loading

  • Kabir, M.Z.;Rezaifar, O.;Rahbar, M.R.
    • Structural Engineering and Mechanics
    • /
    • v.26 no.3
    • /
    • pp.277-295
    • /
    • 2007
  • 3-D wall panels are used in construction of exterior and interior bearing and non-load bearing walls and floors of building of all types of construction. Fast construction, thermal insulation, reduced labor expense and weight saving are the most well pronounced advantage of such precast system. When the structural performance is concerned, the main disadvantage of 3D panel, when used as floor slab, is their brittleness in flexure. The current study focuses on upgrading ductility and load carrying capacity of 3D slabs in two different ways; using additional tension reinforcement, and inserting a longitudinal concentrated beam. The research is carried on both experimentally and numerically. The structural performance in terms of load carrying capacity and flexural ductility are discussed in details. The obtained results could give better understanding and design consideration of such prefabricated system.

3D BIM Modeling of Temporary Structure for Earthwork using Parametric Technique (파라메트릭 기술을 이용한 토공용 임시 구조물의 3D BIM 모델링)

  • Tanoli, Waqas Arshad;Raza, Hassnain;Lee, Seung-Soo;Park, Sang-Il;Seo, Jong-won
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.1-9
    • /
    • 2018
  • Nowadays Building Information Modeling (BIM) is a significant source of sharing project information in the construction industry. This method of sharing the information enhances the project understanding among stakeholders. Modeling of information using BIM is becoming an essential part of many construction projects around the globe. Despite rapid adoption of BIM in construction industry still, some sectors of the industry like earthwork have not yet reaped its full benefits. BIM has brought a paradigm shift through identification and integration of the roles and responsibilities of project participants on a single platform. BIM is a 3D model-based process which provides the insight into the efficient project planning and design. The 3D modeling can also be used significantly for the design of temporary structures in an earthwork project. This paper presents the quantity take-off methodology and parametric modeling technique for creating the temporary structures using 3D BIM process. A case study is conducted to implement the proposed temporary structure family design on a real site project. The study presented is beneficial for the earthwork project stakeholders to extract the relevant information using 3D BIM models in a project. It provides an opportunity to calculate the quantity of material required for a project accurately.

Characterization of mechanical and photocatalytic performance on cement-based materials with TiO2 particles for binder jet 3D printing (바인더젯 3D 프린팅을 위한 TiO2 입자를 함유한 시멘트 기반 재료의 기계적 성능 및 광촉매 특성 분석)

  • Liu, Jun-Xing;Li, Pei-Qi;Bae, Sung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.69-70
    • /
    • 2023
  • The development of advanced 3D printing technologies has opened up new opportunities for customized digital designs in the construction industry. Using nano- and micro-scale additives is expected to improve the performance of cement-based materials in 3D printing. TiO2 particles have been widely used as reinforcing additives in cement-based materials. Therefore, this study aims to investigate the application of cement-based materials containing multi-size TiO2 particles in binder jet 3D printing and the effect of different-size TiO2 particles on the performance of printed samples. TiO2 particles exhibit an excellent filling effect, which increases the density of the printed samples and promotes hydration, thereby improving the compressive strength of the samples. In addition, larger TiO2 particles exert more pronounced filling and photocatalytic effects on the resulting samples.

  • PDF

Development of Layer Object Simulation System for Construction Project based on Virtual Reality (가상현실기반 건설공사의 레이어 객체 시뮬레이션 시스템 구축 연구)

  • Kang, Leen-Seok;Ji, Sang-Bok;Kim, Seol-Gi;Moon, Jin-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.957-960
    • /
    • 2007
  • The construction information used in the design and construction phases are being gradually changed by 3D objects based on virtual reality (VR). This study developed an algorithm and computerized system to visualize layer object simulation that can be used in the pre-design phase. Layer object simulation enables designer to review expecting problems, which can reappear in real construction site, by building construction structures in a VR system. This function can be used as an important tool of virtual construction system.

  • PDF

Development of Pre-construction Verification System using AR-based Drawings Object (도면증강 객체기반의 건설공사 사전 시공검증시스템 개발 연구)

  • Kim, Hyeonsung;Kang, Leenseok
    • Land and Housing Review
    • /
    • v.11 no.3
    • /
    • pp.93-101
    • /
    • 2020
  • Recently, as a BIM-based construction simulation system, 4D CAD tools using virtual reality (VR) objects are being applied in construction project. In such a system, since the expression of the object is based on VR image, it has a sense of separation from the real environment, thus limiting the use of field engineers. For this reason, there are increasing cases of applying augmented reality (AR) technology to reduce the sense of separation from the field and express realistic VR objects. This study attempts to develop a methodology and BIM module for the pre-construction verification system using AR technology to increase the practical utility of VR-based BIM objects. To this end, authors develop an AR-based drawing verification function and drawing object-based 4D model augmentation function that can increase the practical utility of 2D drawings, and verify the applicability of the system by performing case analysis. Since VR object-based image has a problem of low realism to field engineers, the linking technology between AR object and 4D model is expected to contribute to the expansion of the use of 4D CADsystem in the construction project.

Developing Competency Model and Analyzing Competency Needs for Construction Manager in D Co., Ltd. (건설사업관리자 역량 모형 개발 및 역량 요구 분석: D사(社) 사례를 중심으로)

  • Kim, Dae-Young
    • Journal of vocational education research
    • /
    • v.33 no.3
    • /
    • pp.37-56
    • /
    • 2014
  • The purpose of this study was to develop a competency model and analyze the competency needs for construction manager in D Co., Ltd.. The delphi method of 25 excellent construction managers working in D Co., Ltd. was used to develop a competency model. The results showed that there would be a construction manager competency model which consisted of 3 competency clusters, 11 competencies, and 60 key actions. Then the survey of 114 construction managers working in D Co., Ltd. was conducted to examine concurrent construct validity of the competency model for construction manager and to analyze construction managers' competency needs by using the Borich's formula and the Locus for Focus Model(LfFM). The results showed that construction managers perceived 'communication', 'risk management', 'goal orientation', 'customer orientation', and 'project management' as top five priorities of competencies for construction managers. Based upon the above results, some implications were suggested for developing construction managers' competencies and improving their performance.

Economic Analysis of Neighborhood Facility using the U-flanged Truss Hybrid Beam (U-플랜지 트러스 복합보를 사용한 근린생활시설의 경제성 분석)

  • Oh, Myoung Ho;Park, Sung Jin;Kim, Young Ho
    • Journal of Korean Association for Spatial Structures
    • /
    • v.21 no.3
    • /
    • pp.77-84
    • /
    • 2021
  • In this study, In order to apply the U-flanged truss hybrid beam to the actual construction site, the structural design of the basic module of the middle and low-rise neighborhood living facilities was performed according to the Korea Design Standard, and the construction cost and construction period were compared with the traditional reinforced concrete structure system. As a result of analyzing the construction cost for the basic module, if the U-flanged truss hybrid beam and D-Deck slab system are used, the construction cost can be reduced by 86% compared to the traditional reinforced concrete structure system. In addition, as a result of analyzing the construction period for a floor area of 1,000m2, using the U-flanged truss hybrid beam and D-Deck slab system can save 2.0days in construction period compared to the traditional reinforced concrete structure system. Therefore, the U-flange truss hybrid beam can secure sufficient economic feasibility compared to the existing reinforced concrete method in terms of cost reduction and shortening of construction period.

3D Digital Design Optimization Process Considering Constructability of Freeform Structure (비정형 구조물의 시공성을 고려한 3차원 디지털 설계 최적화 프로세스)

  • Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.35-43
    • /
    • 2013
  • Nowadays the widely used media in architecture include visualizations, animations and three-dimensional models. 3D digital methods using active CAM(Computer Aided Manufacturing) and CNC(Computerized Numerical Control) imaging have been developed for accurate shape and 3D measurements in freeform buildings. In contrast to a conventional building using auto CAD system and others, the proposed digital optimization method is based on a combination of 3D numerical data and parametric 3D model for design and construction. The objective of this paper is therefore to present digital optimization process for constructability of freeform building. The method can be useful in the effective implementation of an error-proofing process of freeform building during design and construction phase. 3D digital coordinate data can be used effectively to identify correct size of structural and finish members and installation location of each members in construction field. In addition, architects, engineers and contractors can evaluate design, materials, constructability and identify error-proofing opportunities. Other project participants can also include representatives from all levels of management, departments as well as workers and key subcontractors' personnel, if necessary. The 3D digital optimization process is therefore appropriate to serious variations in freeform shape. For future study, the developed digital optimization method is necessary to be carried out to verify the robustness and accuracy for constructability in construction field.

CONSTRUCTION OF MANY d-ALGEBRAS

  • Allen, Paul J.
    • Communications of the Korean Mathematical Society
    • /
    • v.24 no.3
    • /
    • pp.361-366
    • /
    • 2009
  • In this paper we consider constructive function triples on the real numbers $\mathbb{R}$ and on (not necessarily commutative) integral domains D which permit the construction of a multitude of d-algebras via these constructive function triples. At the same time these constructions permit one to consider various conditions on these d-algebras for subsets of solutions of various equations, thereby producing geometric problems and interesting visualizations of some of these subsets of solutions. In particular, one may consider what notions such as "locally BCK" ought to mean, certainly in the setting provided below.

Development of Remote Measurement Method for Reinforcement Information in Construction Field Using 360 Degrees Camera (360도 카메라 기반 건설현장 철근 배근 정보 원격 계측 기법 개발)

  • Lee, Myung-Hun;Woo, Ukyong;Choi, Hajin;Kang, Su-min;Choi, Kyoung-Kyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.6
    • /
    • pp.157-166
    • /
    • 2022
  • Structural supervision on the construction site has been performed based on visual inspection, which is highly labor-intensive and subjective. In this study, the remote technique was developed to improve the efficiency of the measurements on rebar spacing using a 360° camera and reconstructed 3D models. The proposed method was verified by measuring the spacings in reinforced concrete structure, where the twelve locations in the construction site (265 m2) were scanned within 20 seconds per location and a total of 15 minutes was taken. SLAM, consisting of SIFT, RANSAC, and General framework graph optimization algorithms, produces RGB-based 3D and 3D point cloud models, respectively. The minimum resolution of the 3D point cloud was 0.1mm while that of the RGB-based 3D model was 10 mm. Based on the results from both 3D models, the measurement error was from 10.8% to 0.3% in the 3D point cloud and from 28.4% to 3.1% in the RGB-based 3D model. The results demonstrate that the proposed method has great potential for remote structural supervision with respect to its accuracy and objectivity.