• 제목/요약/키워드: 3D construction

검색결과 2,813건 처리시간 0.042초

3차원 CAD정보를 활용한 건축설비 자동화시스템 구축에 관한 기초연구 (The Development of Automated Building Equipment Design System Using 3D CAD Building Information)

  • 송규동;송승영;정우신
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2007년도 정기 학술대회 논문집
    • /
    • pp.357-360
    • /
    • 2007
  • In the area of domestic construction industry, recently, standardization of construction. globalization of constructional and a building information arc required to advance increase productivity, shorten the term of works and reduce the cost of construction. The objective of this is to offer basic data of process new thesis and development for automated building equipment design system based on 3D CAD building information. This study contribute the development of automated Building equipment design system based on 3D which helps to conduct the equipment design handily and quickly.

  • PDF

대블록시공법에 따른 강상판교의 시공단계별 거동 (Behavior Due to Construction Step in Steel Deck Bridge by Large Block Construction Method)

  • 이성행;김경남;함형길;정경섭
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제14권2호
    • /
    • pp.97-105
    • /
    • 2010
  • 시공단계에 따른 강상판교의 변위를 측정하였고, 이 결과와 비교하기 위하여 3차원 구조해석을 수행하였다. 검증된 모델을 사용하여 대블럭 시공법에 의한 시공단계에 따른 3차원 구조해석을 수행하여 다음과 같은 결론을 얻었다. 1. 설계에 사용된 Grid 해석과 3차원 해석에 의한 결과를 비교하면, Grid 해석의 결과는 곡선교의 변위를 모사하는데 한계가 있었으며, 두 가지 해석방법에 의한 변위의 차이는 약 10~20%정도였다. 2. 가설중에 일어날 수 있는 최대 처짐은 완료된 상태의 처짐에 비하여 1.7배까지 크게 발생하였다. 3. 시공단계 해석 결과, 블록시공법에 의하여 시공되는 교량의 거동은 전체 구조물이 일체로 되어 한 번에 거치되는 교량과는 다른 결과가 도출되며, 중간의 가설과정에서는 설계시 고려된 응답보다 더 큰 결과가 도출되고 있으므로, 설계시 시공단계를 고려한 해석을 통하여 합리적인 구조설계가 이루어져야 한다.

3D DTM을 이용한 설계용 프로파일 생성 정확도 분석 (The Accuracy Analysis of Design Profile Generation using 3D Digital Terrain Model)

  • 엄대용;이은수
    • 한국측량학회지
    • /
    • 제26권6호
    • /
    • pp.583-590
    • /
    • 2008
  • 도로, 철도 및 운하 등을 비롯한 각종 건설공사를 위해서는 건설공사의 설계과정에서 건설예정지에 대한 지형측량을 실시하고 이를 기초로 종 횡단면도의 제작이 필수적인 요소이다. 본 연구에서는 건설예정지에 대한 프로파일제작에 있어 NGIS구축사업에 의해 제작된 수치지형도의 지형정보를 이용하여 정밀 3차원지형모델을 구축하고, 이로부터 자동 프로파일을 생성하여 종 횡단면도로 활용할 수 있는 방안을 검토하고자 하였다. 이를 위해 수치지형도로부터 표고 및 주요시설물의 레이어를 각각 추출하고 이를 이용하여 정밀 3차원 지형모델을 구축하는 한편, 3차원 지형모델로부터 자동 프로파일을 생성하여 종 횡단면도를 제작하였다. 그리고 생성된 프로파일의 경로에 대하여 지형측량을 실시하여 상호 분석함으로써 자동 생성된 프로파일의 정확도가 현지측량 정확도를 만족시킬 수 있는지의 여부를 검토하였다. 본 연구의 결과는 건설공사를 위해 실시되는 설계과정에서 설계기간의 단축, 설계비용의 감소와 설계업무의 효율화를 꾀할 수 있는 새로운 개념의 프로파일 생성기법으로 제안할 수 있을 것으로 사료된다.

Comparison of 3D Reconstruction Methods to Create 3D Indoor Models with Different LODs

  • Hong, Sungchul;Choi, Hyunsang
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.674-675
    • /
    • 2015
  • A 3D indoor model becomes an indiscernible component of BIM (Building Information Modeling) and GIS (Geographic Information System). However, a huge amount of time and human resources are inevitable for collecting spatial measurements and creating such a 3D indoor model. Also, a varied forms of 3D indoor models exist depending on their purpose of use. Thus, in this study, three different 3D indoor models are defined as 1) omnidirectional images, 2) a 3D realistic model, and 3) 3D indoor as-built model. A series of reconstruction methods is then introduced to construct each type of 3D indoor models: they are an omnidirectional image acquisition method, a hybrid surveying method, and a terrestrial LiDAR-based method. The reconstruction methods are applied to a large and complex atrium, and their 3D modeling results are compared and analyzed.

  • PDF

2D 설계도면 데이터 추출 및 3차원 공간 데이터 구축을 통한 건설산업 디지털 트윈 자동화 기법 연구 (Research on Digital Twin Automation Techniques in the Construction Industry through 2D Design Drawing Data Extraction and 3D Spatial Data Construction)

  • 이종서;문일영
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2021년도 추계학술대회
    • /
    • pp.609-612
    • /
    • 2021
  • 다양한 산업영역에 대하여 정부기관, 기업들은 디지털 트랜스포메이션 전략 수립 및 추진하고 있으며 성공적인 기술 혁신을 통한 4차 산업혁명시대를 선도하고 있다. 이런 변화의 시기에 디지털 트랜스포메이션의 성공사례로 글로벌 기업 나이키, 스타벅스의 이야기를 많이 접할 수 있다. 이 두 기업은 디지털 트랜스포메이션을 통하여 성공적인 결과를 보여 주고 있다. 국내 기업들 또한 모바일, 클라우드, IoT, 인공지능, AR·VR 기술을 기반으로 디지털 혁신을 진행하고 있으며 고효율 높은 생산성을 위한 RPA (Robotic Process Automation)프로세스를 구축 하고 있다. 본 논문에서는 건설 산업의 설계, 시공, 유지관리의 시공 전주기 데이터를 활용하여 3차원 디지털 트윈 공간 구축 자동화 프로세스 기법을 소개하고 앞으로 건설 산업영역의 디지털 트랜스포메이션 전략에 대하여 알아본다.

  • PDF

정규화를 통한 3차원 데이터 모델 구축 및 활용성 향상 방안 연구 -건축 마감 공사 중심으로 - (A Study on 3D Data Model Development by Normalizing and Method of its Effective Use - Focused on Building Interior Construction -)

  • 이명훈;함남혁;김주형;김재준
    • 한국디지털건축인테리어학회논문집
    • /
    • 제10권3호
    • /
    • pp.11-18
    • /
    • 2010
  • Cost estimation through fast and correct quantity take offs are crucial in the process of construction project. The existing methods for cost estimation are mainly based on 2D-based drawings and the estimation result tends to be different according to the estimator's experience, the quality and quantity of used information and estimation time. To solve these problems, the domestic construction industry have recently tried to use the data extracted from 3D data modeling based on BIM(Building Information Modeling) in order to achieve more accurate and objective cost estimation. However it tends to increase dramatically the quantity of information that can be used in cost estimation by estimators. Therefore in order to achieve quality information data from 3D data modeling, the characteristics of the project should be reflected on the 3D model and it is most important to extract information only for cost estimation from the whole 3D model fast and accurately. Thus this study aims to propose the 3D modeling method through Data Normalization which maximizes the usability of 3D Data modeling in cost estimation process.

포인트 클라우드 데이터를 활용한 골조공사 진도측정 연구 (Progress Measurement of Structural Frame Construction using Point Cloud Data)

  • 김주용;김상희;김광희
    • 한국건설관리학회논문집
    • /
    • 제25권3호
    • /
    • pp.37-46
    • /
    • 2024
  • 최근 스마트 건설기술 중 현상에 대한 정확하고 빠른 정보수집이 가능한 3D 레이저 스캐닝 기술이 주목받고 있다. 3D 레이저 스캐닝 기술은 건설현장에서 현실과 가장 유사한 정보를 획득할 수 있다. 본 연구에서는 3D 레이저 스캐닝 기술을 활용하여 수집할 수 있는 포인트 클라우드 데이터를 건설현장 진도측정에 적용 가능성에 대하여 새로운 부재 식별방법을 실제 건물에 적용하여 제시하고자 한다. 연구 수행을 위해 BIM으로부터 부재 식별을 위한 위치 정보를 수집, 수집된 위치 정보의 인식 여유 범위를 설정하여 포인트 클라우드 데이터로부터 건물을 구성하고 있는 부재 식별을 진행하였다. 연구결과 포인트 클라우드 데이터로부터 건물을 구성하고 있는 기둥, 보, 벽 그리고 슬라브를 식별할 수 있음을 확인하였다. 식별결과는 실제 건물에 시공이 완료된 부재를 모두 확인할 수 있었으며, 이를 프로젝트 BOQ의 부재별 단가와 연동하여 기성 산출에 활용할 수 있다. 또한, 연구를 통해 획득한 포인트 클라우드 데이터는 건설현장의 품질관리 모니터링 및 건물의 유지관리를 위한 정확한 자료로써 활용될 수 있다. 연구결과는 추후 프로젝트 활용을 위해 사용되는 건설 정보의 적시성 및 정확성 향상에 기여할 수 있을 것으로 사료된다.

3D/4D CAD를 통한 시설물 생애주기 관리 유용분야 도출 (3D/4D CAD Applicability for Life Cycle Facility Management)

  • 박정준;김창윤;김형관
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.291-296
    • /
    • 2008
  • 지난 20년간 3D/4D CAD에 관한 연구는 시설물 생애주기의 설계, 시공단계를 중심으로 활발히 진행되어 왔지만 시설물 생애주기 전반에 걸쳐서 3D/4D CAD의 유용성에 관한 연구는 아직까지 미흡한 실정이다. 본 연구에서는 설계, 시공단계에 국한하지 않고 시설물 생애주기 동안의 3D/4D CAD 사용에 따른 유용성을 도출하기 위하여 현재 상용화된 소프트웨어를 사용하여 3D/4D CAD 모델을 생성하였다. 생성된 모델과 기존의 시설물 생애주기 관리 방법을 기반으로 전문가와 포커스 그룹 인터뷰를 실시하여 그 결과를 바탕으로 155명의 시설물 생애주기 관련 업무 수행자들의 설문조사를 통해 3D/4D CAD를 통한 시설물 생애주기 관리 유용성을 도출하였다.

  • PDF

3차원 형상·지식정보를 활용한 마감공사 개산견적 프로세스 (Schematic Estimation Process for Finishing Work using 3D Geometry-Knowledge Information)

  • 박상헌;박형진;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.210-212
    • /
    • 2013
  • The construction cost estimates during the design phase becomes the standard to judge profitability and validity, and is very important in various decision-makings by project owner. However, since approximate costs are quoted when many parts are undecided in the early stage of project, differences are bound to occur between the construction cost calculated through approximate quotation and that put into construction actually. Also, since in existing quotation works, quantity calculations have been dependent on the staff's manual work, involving error potential, and thus differences are likely in quantity calculation depending on the quotation staff's method of calculation. In this study, the process of creating space model to deduce 3D geometry information for approximate quotation in association with knowledge information and the expression for calculation of finishing area were proposed.

  • PDF

사업기획단계에서의 현수교의 물량추정을 위한 모델연구 (Estimation Model for Approximate Construction Quantities of Suspension Bridge in Early Stage)

  • 박원태;천경식
    • 복합신소재구조학회 논문집
    • /
    • 제6권4호
    • /
    • pp.24-29
    • /
    • 2015
  • Bridge construction cost estimates have generally been conducted by using historial unit-price(per meter or square meter). The traditional estimating method based on unit-price references can never completely reflect the specialty of cable supported bridge. In this paper, we have developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous suspension bridge with 2-pylons. First of all, we'd analyzed the design information (such as structural design report, blueprint and quantity) and the real cost data from the existing suspension bridges and derived the design variables of the bridges. We developed the BIM wizard that generates a suspension bridge model parametrically based on derived design variables. The principle material quantities of suspension bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. We have established the system that the construction cost can be estimated more specific than the traditional estimating method.