• Title/Summary/Keyword: 3D BIM

Search Result 397, Processing Time 0.029 seconds

Enhancement of BIM Modeling Automation Algorithm for Linear-Based Tunnel Infrastructure and Development of BIM Modeling Automation System (선형기반 터널 인프라 구조물의 BIM 모델링 자동화 알고리즘 개선 및 BIM 모델링 자동화 시스템 개발)

  • Kim, Yun-Ok;Kim, Ji-Young; Kim, Tae-Min;Moon, So-Yeong
    • Journal of KIBIM
    • /
    • v.13 no.3
    • /
    • pp.1-11
    • /
    • 2023
  • In order to use BIM as a tool for improving the productivity and quality of products in the construction industry, a BIM model must be created from the design stage first. Infrastructure structures such as bridges and tunnels are mainly created based on three-dimensional alignment in the generation of BIM models. Especially, generation of BIM models based on three-dimensional linearity has high task difficulty and algorithms for automating BIM modeling for railway infra structures have been suggested in previous studies. This study improved the BIM modeling automation algorithm of railway infrastructures and developed a system based on the algorithm so that it can be easily used by ordinary users. The system was built as an add-in system of Autodesk's Revit. As an improvement first, it is possible to arrange different libraries for each pattern, enabling various uses. In addition, it can be created models of several members with a single process and the system can automatically places structures that are added periodically, such as Rock Bolt and Fore Polling. Finally, 3D length information and volume for each pattern are automatically calculated for more accurate 3D-based volume calculation. This study contributes to increasing user accessibility by building a BIM modeling automation algorithm into a system. The system is expected to improve the efficiency of BIM modeling creation of linear-based infra structures, including railway infrastructure.

A Study on the Application Service of 3D BIM-based Disaster Integrated Information System Management for Effective Disaster Response (효과적인 재난 대응을 위한 3차원 BIM 기반 재난 통합정보 시스템 활용 서비스 제시)

  • Kim, Ji-Eun;Hong, Chang-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.143-150
    • /
    • 2018
  • Periodic and systemic disaster management has become more important than ever owing to the recent continuous occurrence of disasters, such as fires, earthquakes, and flooding. This management goes beyond simple disaster preparedness, which was introduced minimally under the existing legal system. For effective disaster management, facilities should be managed through regular maintenance on a daily basis, and in the case of an emergency, intuitive and accurate communication is essential regarding the situation and purpose. BIM manages the entire building property data using the effective 3D visualization model, so it can be used for various management purposes from design to facility maintenance. In this study, through an expert survey on the use of services in a BIM-based integrated disaster information system, the available areas of BIM data were organized in terms of facility information management, 3D visualization, and disaster control. Later, through the use service and DB definition within the BIM-based disaster integration information system, the main facilities monitoring and response services based on BIM and BIM-based spatial management service are proposed. Based on this study, it is hoped that the BIM-based application service functions within the system will be implemented to enable an effective system response.

Parametric Quantity Take-Off of Earthwork by Comparing the Use of Surface and Solid Models (Surface 및 Solid 방식의 비교를 통한 Parametric 기법의 토공물량산출 방법)

  • Hwang, Hee-Su;Lee, Jae-Hong;Kim, Tae-Young
    • Journal of KIBIM
    • /
    • v.8 no.1
    • /
    • pp.56-62
    • /
    • 2018
  • There exists no precedented case of quantity take-off, using parametric modeling, from BIM-based irregular structures. Civil 3D provides earthwork quantity take-off based on surface modeling. Generally, designers should enter data into the specification additionally after extracting quantity estimation from earthwork modeling design. The objective of this report is to suggest the method from quantity take-off to specification of BIM-based earthwork quantities. We intend to investigate earthwork take-off method by Civil3D and explain why parametric information extraction is required for quantity estimation and specification and how information of earthwork quantity based on solid and surface modeling is connected to open quantity take-off module. It is highly expected that this suggestion would be the practical methodology of earthwork quantity take-off and specification in the field of civil engineering.

Engineering Construction With High-Precision Survey Equipment (3D laser scanner, 3D photo scanner, drone) (고정밀 측량장비(3D 레이저 스캐너, 3D 포토 스캐너, 드론)를 활용한 건축 시공단계의 엔지니어링 적용사례)

  • Krchung, Kwang-Ryang;Lee, Byoung-Do;Kim, Tae-Hyuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.133-134
    • /
    • 2019
  • As information and construction technology increases, the demand for sophisticated geometric design grows. Design of buildings is becoming more larger, higher, and complicated every day, requiring much new construction technology to bring the design into reality. Nonetheless, the speed of construction technology development is not as rapid. This study concerns the difficulties of realization of sophisticated geometric design. It aims to suggest using BIM and precision survey equipment during the construction stage of the project is a way to resolve. The study will list how to use BIM as an engineering platform incorporating a photo scanner, a scanner drone, and a 3D scanner in the construction stage of projects, how these progressive projects were able to benefit from the high-construction technology.

  • PDF

Basic Research on BIM-Based Quantity Take-off Guidelines

  • Yun, Seokheon;Kim, Sangchul
    • Architectural research
    • /
    • v.15 no.2
    • /
    • pp.103-109
    • /
    • 2013
  • Various types of building information should be linked to 3D model objects for their effective use by stakeholders. Because Building Information Modeling (BIM) based on 3D is used by different stakeholders, the created BIM need standard guidelines for each purpose, as, for example, for quantity take-off. Thus, this study was conducted to propose guidelines for BIM modeling for quantity take-off in the framework, especially, in the concrete and form. The proposed guidelines adopted each element of the BIM model based on an analysis of the problem of the general BIM model. Moreover, the usability and accuracy of the reinforced structure modeling guidelines were verified by comparing the quantity of the commercial estimation software and the modeling quantity using the proposed modeling guidelines.

Development of Automated 3D Modeling System to Construct BIM for Railway Bridge (철도 교량의 BIM 구축을 위한 3차원 모델 생성 자동화 시스템 개발)

  • Lee, Heon-Min;Kim, Hyun-Seung;Lee, Il-Soo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.31 no.5
    • /
    • pp.267-274
    • /
    • 2018
  • For successful BIM settlement, it is a key technic for engineer to design structures in the 3-dimensional digital space and to work out related design documents directly. Lately many BIM tool has been released and each supports their 3-dimensional object libraries. But it is not easy to apply those libraries to design transportation infra structures that were placed along the route(3-dimensional line). Moreover, in case of design changes, it is so difficult to reflect those changes with the integrated model that was assembled by them. Because of they were developed without consideration for redundancy of parameters between objects that were placed nearby or were related each other. In this paper, a method to develop module for modeling and placing 3-dimensional object for transportation infra structures is presented. The modules are employed by a parametric method and can deal with design changes. Also, for a railroad bridge, through developing user interface of the integrated 3-dimensional model that was assembled by those modules the applicability of them was reviewed.

Development of BIM Based Information Model Interface Module for a Modular Pier (모듈러 교각의 BIM 기반 정보 모델 인터페이스 모듈 개발)

  • Kim, Dong-Wook;Lee, Kwang-Myong;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.5 no.1
    • /
    • pp.1-7
    • /
    • 2015
  • Modular technology has become a major issue of the construction industries to enhance their productivity. Modular bridge construction generally requires the data exchange between the contractors, designers, fabricators and constructors. Therefore, a readily accessible information model interface module based on BIM technology is essential for their communication during a project life-cycle. In this study, BIM based information model interface module for a modular pier was developed. For the information models, the PBS(Product Breakdown Structure) and LOD(Level of Development) were defined. Next, all components of a modular pier were conducted by the parametric modeling technique, and then 3D cell library interface was developed. An nterface module was also developed using VBA(Visua basic Application) for exchanging a data from 3D model library to other softwares such as Microstation, AutoCad and Excel and was connected with MS Access database. The developed information model interface module would improve the design quality of the modular pier and reduce the time and cost for design. Updated 3D information models could be utilized for the fabrication, assembly, and construction process for modular piers.

Development of BIM based LID Facilities Supply Auto-checking Module (BIM 기반 LID 시설 물량 자동 검토 모듈 개발)

  • Choi, Junwoo;Jung, Jongsuk;Lim, Seokhwa;Choi, Joungjoo;Kim, Shin;Hyun, Kyounghak
    • Journal of Environmental Impact Assessment
    • /
    • v.26 no.3
    • /
    • pp.195-206
    • /
    • 2017
  • Recently, Discussion about BIM based LID (Low Impact Development) facilities management system is activated because interest of LID technique for urban water cycle restoration is increasing. For this reason, this paper developed the auto-checking module of the BIM (Building Information Model) based supply output table. This module will be the foundation of the BIM based LID facilities total management system. The research order is composed like next follows: (1) Select target area, (2) Make BIM model of LID facilities and extract supply output table, (3) Develop comparison module, (4) Analysis results. As a result, the authors made 27 LID facilities and developed the supply output table comparison automation module. So, the authors could find differences of 2D design documents based supply output table and BIm based supply output table. So, the authors made an improvement suggestion of the design plan and could construct foundation of the BIM based LID facilities total management system.

A Study on 3D Indoor mapping for as-built BIM creation by using Graph-based SLAM (준공 BIM 구축을 위한 Graph-based SLAM 기반의 실내공간 3차원 지도화 연구)

  • Jung, Jaehoon;Yoon, Sanghyun;Cyrill, Stachniss;Heo, Joon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.32-42
    • /
    • 2016
  • In Korea, the absence of BIM use in existing civil structures and buildings is driving a demand for as-built BIM. As-built BIMs are often created using laser scanners that provide dense 3D point cloud data. Conventional static laser scanning approaches often suffer from limitations in their operability due to the difficulties in moving the equipment, the selection of scanning location, and the requirement of placing targets or extracting tie points for registration of each scanned point cloud. This paper aims at reducing the manual effort using a kinematic 3D laser scanning system based on graph-based simultaneous localization and mapping (SLAM) for continuous indoor mapping. The robotic platform carries three 2D laser scanners: the front scanner is mounted horizontally to compute the robot's trajectory and to build the SLAM graph; the other two scanners are mounted vertically to scan the profiles of surrounding environments. To reduce the accumulated error in the trajectory of the platform through loop closures, the graph-based SLAM system incorporates AdaBoost loop closure approach, which is particularly suitable for the developed multi-scanner system providing more features than the single-scanner system for training. We implemented the proposed method and evaluated it in two indoor test sites. Our experimental results show that the false positive rate was reduced by 13.6% and 7.9% for the two dataset. Finally, the 2D and 3D mapping results of the two test sites confirmed the effectiveness of the proposed graph-based SLAM.