• Title/Summary/Keyword: 3D/4D CAD

Search Result 343, Processing Time 0.026 seconds

DEVELOPMENT OF AN INTEGRATED MODEL OF 3D CAD OBJECT AND AUTOMATIC SCHEDULING PROCESS

  • Je-Seung Ryu;Kyung-Hwan Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1468-1473
    • /
    • 2009
  • Efficient communication of construction information has been critical for successful project performance. Building Information Modeling (BIM) has appeared as a tool for efficient communication. Through 3D CAD objects, it is possible to check interception and collisions of each object in advance. In addition, 4D simulation based on 3D objects integrated with time information makes it realize to go over scheduling and to perceive potential errors in scheduling. However, current scheduling simulation is still at a stage of animation due to manual integration of 3D objects and scheduling data. Accordingly, this study aims to develop an integrated model of 3D CAD objects that automatically creates scheduling information.

  • PDF

Delivery guideline composition and utilization plan for 4D CAD-based schedule management (4D CAD 기반 공정관리 성과품 납품 지침 구성 및 활용방안)

  • Kang, HyoJeong;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.5
    • /
    • pp.3-14
    • /
    • 2024
  • Recently, both nationally and internationally, various BIM guidelines have been developed. These guidelines present fundamental principles and standards for the application of BIM. However, practical BIM guidelines for the schedule management area in the construction phase are lacking, making it difficult to apply them effectively in practical work settings. In this study, performance-based delivery guidelines are presented for the key functionalities of 4D CAD systems, which are representative BIM tools used in the construction phase. To achieve this, a survey analysis was conducted to determine the prioritization of these functionalities. Based on the characteristics of the project, delivery guidelines were formulated to allow users to selectively utilize the guidelines at different levels. Furthermore, practical ways to utilize performance-based delivery guidelines for schedule management using 4D CAD were proposed, validating the usability of these guidelines. The research findings suggest that these guidelines for BIM functionality in schedule management can hold practical significance as the utilization of BIM in construction phases continues to increase.

A Study on a Neutralization Method of Drawing for Augmenting Data in Heterogeneous CAD Drawings (증강 정보의 이기종 CAD 도면 활용을 위한 중립화 방법에 관한 연구)

  • Hwang, InHyuck;Ruy, WonSun;Park, InHa
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.54 no.4
    • /
    • pp.344-351
    • /
    • 2017
  • CAD systems used in various manufacturing industries have been rapidly switched from 2D to 3D. 3D-based design is becoming common in the shipbuilding industries too. However, there is still a demand for 2D drawings for ship production. So, it is necessary to continually improve 2D drawings. One way to improve 2D drawings is to add production information to the drawings. To do this, it is necessary to define the relation between the geometry information and the production information. Various types of drawings, which is inevitable because each drawing has its own purpose, make it difficult to define relations. This process can be simplified if the drawing information is neutralized. XML is a standard format for defining neutral data, and is already being used in various fields. In this study, a neutral augmented drawing has been defined by neutralizing the drawing information based on XML, and implemented for the allocation of their information with high quality of readability as well.

Development of a Three Dimensional Control System for Implementing Rapid Prototyping Technology (쾌속조형기술의 구현을 위한 3차원 제어시스템 개발)

  • Cho, Sung-Mok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.4
    • /
    • pp.775-780
    • /
    • 2007
  • Rapid Prototyping (RP) is a technology that produces prototype parts from 3D computer aided design model data without intermediate processing technology rapidly. CAD model data are created from 3D object digitizing systems but presented just as 2D data when they are printed as a hard copy or displayed on a monitor. However, Rapid Prototyping Technology fabricates 3D objects the same that CAD data because it transforms designed 3D CAD data into 2D cross sectional data, and manufactures layer by layer deposition sequentially. But most of all the small and medium scale companies which produce a toothbrush, a toy and such like provisions are in difficult situations to buy RP system because it is very expensive. In this paper, we propose a 3D control system adopting open source programs for implementing Rapid Prototyping Technology in order that RP system can be purchase at a moderate price.

  • PDF

4D CAD Drawings based on Marker-based Augmented Reality (마커 기반 증강현실 4D CAD 도면)

  • Kim, Hongjo;Kim, Changyoon;Jeong, Hoyoung;Ha, Sooji;Kim, Kinam;Kim, Hyoungkwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.30-40
    • /
    • 2015
  • Two-dimensional drawings are widely used as a communication tool in the construction industry, but they are still hard to be understood by engineers with less experience. A four dimensional CAD drawing is presented based on marker-based augmented reality, for visual assistance, detailed information, and prevention of misunderstanding among users. The developed drawing enables the users to easily understand its contents through the functions augmenting components, providing detailed construction information, and simulating construction process, using the marker in a 2D drawing. A questionnaire-based survey validates the capability of the developed drawing that it improves inexperienced engineers' understanding of the drawings.

Survey on CAD Softwares Used in Small Contractors and Improvement to College CAD Education (중소규모 건설회사 CAD 활용현황과 대학교육 방안)

  • Choi, Heebok;Jang, Myung-Houn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.169-175
    • /
    • 2016
  • A survey of small-size contractors in Jeju was conducted to investigate college graduate's CAD (computer aided design) competence. Most of small-size contractors use CAD softwares to review and update drawings submitted from an architect. This research analyzed the curriculum of the architectural engineering in several national universities. The CAD classes have 4 or 6 hours per week and use AutoCAD primarily. This research proposes that a CAD class needs at least 6 hours per week, 2D drawing is the main theme in the curriculum, and exercises to make 3D models are also included in the CAD class. The improved methods, Internet cafe and real time feedbacks using a smartphone, to evaluate the reports and exercise results are necessary.

A basic study 3D model advancement method for nuclear power plant (원자력 발전설비의 3D 모델 상세화 방안에 대한 기초 연구)

  • Lim, Byung-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.37-38
    • /
    • 2018
  • BIM(Building Information Modeling) in the architecture, VDC(Virtual Design and Construction) defined CIFE(Center for Integrated Facility Engineering) of Stanford university in USA, and Data-driven design definition issued by TECDOC-1284 of IAEA are doing data-level design generated by 3D CAD technology, integrating and managing related information based on the 3D model, and Using 3D models effectively during nuclear power plant life cycle. 3D model of domestic nuclear power industry is using interference review between design fields, 4D system linked 3D construction model and schedule activity, but the 3D model generated in the design phase is effectively not utilized during the construction, operation, decommissioning. therefore, This study is aimed to suggest 3D model LOD(Level of Detail) advancement method through the analysis of existing literature, 2D drawings, and 3D models throughout nuclear power plant lifecycle.

  • PDF

Simplified Methodology to Generate 2D/3D Object in 4D system for Civil Engineering Projects (토목시설물 4D구현을 위한 2D/3D 객체 생성 간편화 기법)

  • Lee Syeung-Youl;Lee Yong-Soo;Kim Chang-Hak;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.585-588
    • /
    • 2003
  • This study attempts to develop a skeleton model to link construction schedule and 3D object for drawings in 4D system. Generally, the construction schedule and 3D object can be linked in 4D system by imported files which are made in specific S/Ws such as CAD S/W and scheduling S/W. Those methods have a difficulties for operating 4D data because extra work needs to link 4D data for each activity. This study develops a 4D model which the 4D data can be self-generated within the system. The suggested model can reduce the initial input data for new project by integrating schedule and 3D object in 4D system.

  • PDF

Study on the Design of Pickup Frame Strip Layout Utilizing PDW of Unigraphics NX4.0 (Unigraphics NX4.0의 PDW를 활용한 픽업 프레임 스트립 레이아웃 설계에 관한 연구)

  • Choi, Kye-Kwang;Kim, Sei-Hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.3
    • /
    • pp.569-573
    • /
    • 2008
  • In this thesis, the drawing was prepared for the strip layout of the pickup frame In the press die, the drawing for press layout is a major factor in determining the mass production of the product. The 3D CAD/CAM system was applied to easily correct interference factors with other parts to be mounted. This study improved the material utilization ratio to 28.49% by optimizing the blank layout and strip layout in wide-width arraying. The 3D CAD/CAM software used is Unigraphics NX 4.0, and the strip layout drawing was prepared in 12 processes.

Development of Aroma Diffuser Using Rapid Prototyping System (쾌속조형기를 이용한 방향기의 개발)

  • 주영철;이창훈
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.3 no.4
    • /
    • pp.303-307
    • /
    • 2002
  • A new product development procedure that uses a rapid prototyping and 3D CAD has been suggested. By applying this procedure to the development of an aroma diffuser, considerable amount of development time and cost were reduced. Moreover, by using 3D CAD from the early design stage, the number of trial and error can be reduced.

  • PDF