Browse > Article
http://dx.doi.org/10.6106/KJCEM.2015.16.4.030

4D CAD Drawings based on Marker-based Augmented Reality  

Kim, Hongjo (Department of Civil and Environmental Engineering, Yonsei University)
Kim, Changyoon (Korea Institute of Civil Engineering and Building Technology)
Jeong, Hoyoung (Department of Civil and Environmental Engineering, Yonsei University)
Ha, Sooji (Department of Civil and Environmental Engineering, Yonsei University)
Kim, Kinam (Department of Civil and Environmental Engineering, Yonsei University)
Kim, Hyoungkwan (Department of Civil and Environmental Engineering, Yonsei University)
Publication Information
Korean Journal of Construction Engineering and Management / v.16, no.4, 2015 , pp. 30-40 More about this Journal
Abstract
Two-dimensional drawings are widely used as a communication tool in the construction industry, but they are still hard to be understood by engineers with less experience. A four dimensional CAD drawing is presented based on marker-based augmented reality, for visual assistance, detailed information, and prevention of misunderstanding among users. The developed drawing enables the users to easily understand its contents through the functions augmenting components, providing detailed construction information, and simulating construction process, using the marker in a 2D drawing. A questionnaire-based survey validates the capability of the developed drawing that it improves inexperienced engineers' understanding of the drawings.
Keywords
4D CAD Drawings; Augmented Reality;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Behzadan, A. H., and Kamat, V. R. (2009). "Automated generation of operations level construction animations in outdoor augmented reality." Journal of Computing in Civil Engineering, 23(6), pp. 405-417.   DOI   ScienceOn
2 Behzadan, A. H., and Kamat, V. R. (2010). "Scalable Algorithm for Resolving Incorrect Occlusion in Dynamic Augmented Reality Engineering Environments." Computer-Aided Civil and Infrastructure Engineering, 25(1), pp. 3-19.   DOI   ScienceOn
3 Benjaoran, V., and Bhokha, S. (2010). "An integrated safety management with construction management using 4D CAD model." Saf. Sci., 48(3), pp. 395-403.   DOI   ScienceOn
4 Chang, J.-R., Hsu, H.-M., and Chao, S.-J. (2012). "Development of a Road Monitoring and Reporting System Based on Location-Based Services and Augmented-Reality Technologies." J. Perform. Constr. Facil., 26(6), pp. 812-823.   DOI
5 Chin, S., Yoon, S., Choi, C., and Cho, C. (2008). "RFID+4D CAD for progress management of structural steel works in high-rise buildings." Journal of Computing in Civil Engineering, 22(2), pp. 74-89.   DOI   ScienceOn
6 Chua, D. K. H., Yeoh, K. W., and Song, Y. (2010). "Quantification of Spatial Temporal Congestion in Four-Dimensional Computer-Aided Design." J. Constr. Eng. Manage.-ASCE, 136(6), pp. 641-649.   DOI   ScienceOn
7 Kim, C., Kim, H., Park, T., and Kim, M. K. (2011). "Applicability of 4D CAD in Civil Engineering Construction: Case Study of a Cable-Stayed Bridge Project." Journal of Computing in Civil Engineering, 25(1), pp. 98-107.   DOI   ScienceOn
8 Kim, C., Kim, B., and Kim, H. (2013). "4D CAD model updating using image processing-based construction progress monitoring." Automation in Construction, 35(0), pp. 44-52.   DOI   ScienceOn
9 Koo, B., and Fischer, M. (2000). "Feasibility study of 4D CAD in commercial construction." J. Constr. Eng. Manage.-ASCE, 126(4), pp. 251-260.   DOI   ScienceOn
10 Kim, B., Kim, C., and Kim, H. (2012). "Interactive Modeler for Construction Equipment Operation Using Augmented Reality." Journal of Computing in Civil Engineering, 26(3), pp. 331-341.   DOI
11 Mahalingam, A., Kashyap, R., and Mahajan, C. (2010). "An evaluation of the applicability of 4D CAD on construction projects." Automation in Construction, 19(2), pp. 148-159.   DOI   ScienceOn
12 Moon, D. and Kwon, S. (2014). "Development of Mobile-Based Process and System for Pipe Management of Construction Using NFC(Near Field Communication) and Augmented Reality Technology", Korean journal of Construction Engineering and Management, KICEM, 15(2), pp. 122-131.   DOI
13 Russell, A., Staub-French, S., Tran, N., and Wong, W. (2009). "Visualizing high-rise building construction strategies using linear scheduling and 4D CAD." Automation in Construction, 18(2), pp. 219-236.   DOI   ScienceOn
14 Shin, D. H., and Dunston, P. S. (2008). "Identification of application areas for Augmented Reality in industrial construction based on technology suitability." Automation in Construction, 17(7), pp. 882-894.   DOI   ScienceOn
15 Dunston, P. S., and Wang, X. (2005). "Mixed realitybased visualization interfaces for architecture, engineering, and construction industry." Journal of construction engineering and management, 131(12), pp. 1301-1309.   DOI   ScienceOn
16 Dai, F., Lu, M., and Kamat, V. R. (2011). "Analytical Approach to Augmenting Site Photos with 3D Graphics of Underground Infrastructure in Construction Engineering Applications." Journal of Computing in Civil Engineering, 25(1), pp. 66-74.   DOI   ScienceOn
17 Dong, S., Behzadan, A. H., Chen, F., and Kamat, V. R. (2013). "Collaborative visualization of engineering processes using tabletop augmented reality." Advances in Engineering Software, 55, pp. 45-55.   DOI   ScienceOn
18 Dong, S., Feng, C., and Kamat, V. R. (2012). "Real-Time Occlusion Handling for Dynamic Augmented Reality Using Geometric Sensing and Graphical Shading." Journal of Computing in Civil Engineering, 27(6), 607-621.   DOI
19 Feng, C.-W., Chen, Y.-J., and Huang, J.-R. (2010). "Using the MD CAD model to develop the timecost integrated schedule for construction projects." Automation in Construction, 19(3), pp. 347-356.   DOI   ScienceOn
20 Golparvar-Fard, M., Pena-Mora, F., and Savarese, S. (2009). "Application of D4AR-A 4-Dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication." ITcon.
21 Golparvar-Fard, M., Pena-Mora, F., and Savarese, S. (2011). "Integrated Sequential As-Built and As-Planned Representation with D(4)AR Tools in Support of Decision-Making Tasks in the AEC/FM Industry." J. Constr. Eng. Manage.-ASCE, 137(12), pp. 1099-1116.   DOI   ScienceOn
22 Hammad, A., Wang, H., and Mudur, S. P. (2009). "Distributed Augmented Reality for Visualizing Collaborative Construction Tasks." Journal of Computing in Civil Engineering, 23(6), pp. 418-427.   DOI   ScienceOn
23 Hou, L., Wang, X., and Truijens, M. (2013b). "Using Augmented Reality to Facilitate Piping Assembly: An Experiment-Based Evaluation." Journal of Computing in Civil Engineering.
24 Hartmann, T., Gao, J., and Fischer, M. (2008). "Areas of application for 3D and 4D models on construction projects." J. Constr. Eng. Manage.-ASCE, 134(10), pp. 776-785.   DOI   ScienceOn
25 Heesom, D., and Mahdjoubi, L. (2004). "Trends of 4D CAD applications for construction planning." Construction Management and Economics, 22(2), pp. 171-182.   DOI   ScienceOn
26 Hou, L., Wang, X., Bernold, L., and Love, P. E. (2013a) . "Using Animated Augmented Reality to Cognitively Guide Assembly." Journal of Computing in Civil Engineering, 27(5), pp. 439-451.   DOI
27 Jeong, S., Heo, J., and Woo, S. (2009). 'Development of Building Monitoring Techniques Using Augmented Reality', Korean journal of Construction Engineering and Management, KICEM, 10(6), pp. 3-12.
28 Jongeling, R., and Olofsson, T. (2007). "A method for planning of work-flow by combined use of locationbased scheduling and 4D CAD." Automation in Construction, 16(2), pp. 189-198.   DOI   ScienceOn
29 Kamat, V. R., Martinez, J. C., Fischer, M., Golparvar-Fard, M., Pena-Mora, F., and Savarese, S. (2011). "Research in Visualization Techniques for Field Construction." J. Constr. Eng. Manage.-ASCE, 137(10), pp. 853-862.   DOI   ScienceOn
30 Kang, L.-S., Moon, H.-S., Park, S.-Y., Kim, C.-H., and Lee, T. S. (2010). "Improved link system between schedule data and 3D object in 4D CAD system by using WBS code." KSCE J. Civ. Eng., 14(6), pp. 803-814.   DOI   ScienceOn
31 Kang, L., Pyeon, J., Moon, H., Kim, C., and Kang, M. (2013). "Development of Improved 4D CAD System for Horizontal Works in Civil Engineering Projects." Journal of Computing in Civil Engineering, 27(3), pp. 212-230.   DOI
32 Wang, X. and Dunston, P. (2006). "Potential of Augmented Reality as an Assistant Viewer for Computer-Aided Drawing." J. Comput. Civ. Eng., 20(6), pp. 437-441.   DOI   ScienceOn
33 Shin, D. H., and Dunston, P. S. (2009). "Evaluation of Augmented Reality in steel column inspection." Automation in Construction, 18(2), pp. 118-129.   DOI   ScienceOn
34 Shin, D. H., and Dunston, P. S. (2010). "Technology development needs for advancing Augmented Reality-based inspection." Automation in Construction, 19(2), pp. 169-182.   DOI   ScienceOn
35 Wang, X. Y., and Dunston, P. S. (2006). "Compatibility issues in augmented reality systems for AEC: An experimental prototype study." Automation in Construction, 15(3), pp. 314-326.   DOI   ScienceOn
36 Yeh, K.-C., Tsai, M.-H., and Kang, S.-C. (2012). "On-Site Building Information Retrieval by Using Projection-Based Augmented Reality." Journal of Computing in Civil Engineering, 26(3), pp. 342-355.   DOI
37 Zollmann, S., Hoppe, C., Kluckner, S., Poglitsch, C., Bischof, H., and Reitmayr, G. (2014). "Augmented Reality for Construction Site Monitoring and Documentation." Proceedings of the Ieee, 102(2), pp. 137-154.   DOI   ScienceOn