DOI QR코드

DOI QR Code

4D CAD Drawings based on Marker-based Augmented Reality

마커 기반 증강현실 4D CAD 도면

  • Kim, Hongjo (Department of Civil and Environmental Engineering, Yonsei University) ;
  • Kim, Changyoon (Korea Institute of Civil Engineering and Building Technology) ;
  • Jeong, Hoyoung (Department of Civil and Environmental Engineering, Yonsei University) ;
  • Ha, Sooji (Department of Civil and Environmental Engineering, Yonsei University) ;
  • Kim, Kinam (Department of Civil and Environmental Engineering, Yonsei University) ;
  • Kim, Hyoungkwan (Department of Civil and Environmental Engineering, Yonsei University)
  • Received : 2015.02.21
  • Accepted : 2015.04.28
  • Published : 2015.07.31

Abstract

Two-dimensional drawings are widely used as a communication tool in the construction industry, but they are still hard to be understood by engineers with less experience. A four dimensional CAD drawing is presented based on marker-based augmented reality, for visual assistance, detailed information, and prevention of misunderstanding among users. The developed drawing enables the users to easily understand its contents through the functions augmenting components, providing detailed construction information, and simulating construction process, using the marker in a 2D drawing. A questionnaire-based survey validates the capability of the developed drawing that it improves inexperienced engineers' understanding of the drawings.

건설 프로젝트에서 2차원 도면은 참여자들간의 의사소통 도구로 활용되고 있으나, 전문적인 표기 방식으로 인해 도면에 경험이 많은 전문가를 제외한 다른 참여자들이 쉽게 도면의 정보를 파악하기 어렵다. 이러한 점을 극복하기 위해 본 연구에서는 증강현실 및 4D CAD 기술을 접목한 새로운 도면을 제시하고자 한다. 제시된 도면에서는 사용자가 기존의 2차원 도면 위를 웹카메라와 같은 장비로 관찰할 때 3차원 구조물을 증강시켜 자재에 대한 상세 정보 및 시공 시뮬레이션을 할 수 있다. 이 도면을 통해 기존의 도면에 익숙한 건설 프로젝트 참여자 및 경험이 적은 참여자들과의 의사소통에 오류를 줄여줄 수 있을 것으로 기대된다. 관련분야 대학생들을 대상으로 한 설문조사를 통해 개발한 도면의 유용성을 검증하였다. 설문조사 결과, 기존의 2차원 도면 대비 개발한 도면의 유용성이 자재 정보, 시공 과정, 3차원 구조의 이해 등에서 매우 크게 나타났다.

Keywords

References

  1. Behzadan, A. H., and Kamat, V. R. (2009). "Automated generation of operations level construction animations in outdoor augmented reality." Journal of Computing in Civil Engineering, 23(6), pp. 405-417. https://doi.org/10.1061/(ASCE)0887-3801(2009)23:6(405)
  2. Behzadan, A. H., and Kamat, V. R. (2010). "Scalable Algorithm for Resolving Incorrect Occlusion in Dynamic Augmented Reality Engineering Environments." Computer-Aided Civil and Infrastructure Engineering, 25(1), pp. 3-19. https://doi.org/10.1111/j.1467-8667.2009.00601.x
  3. Benjaoran, V., and Bhokha, S. (2010). "An integrated safety management with construction management using 4D CAD model." Saf. Sci., 48(3), pp. 395-403. https://doi.org/10.1016/j.ssci.2009.09.009
  4. Chang, J.-R., Hsu, H.-M., and Chao, S.-J. (2012). "Development of a Road Monitoring and Reporting System Based on Location-Based Services and Augmented-Reality Technologies." J. Perform. Constr. Facil., 26(6), pp. 812-823. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000272
  5. Chin, S., Yoon, S., Choi, C., and Cho, C. (2008). "RFID+4D CAD for progress management of structural steel works in high-rise buildings." Journal of Computing in Civil Engineering, 22(2), pp. 74-89. https://doi.org/10.1061/(ASCE)0887-3801(2008)22:2(74)
  6. Chua, D. K. H., Yeoh, K. W., and Song, Y. (2010). "Quantification of Spatial Temporal Congestion in Four-Dimensional Computer-Aided Design." J. Constr. Eng. Manage.-ASCE, 136(6), pp. 641-649. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000166
  7. Dai, F., Lu, M., and Kamat, V. R. (2011). "Analytical Approach to Augmenting Site Photos with 3D Graphics of Underground Infrastructure in Construction Engineering Applications." Journal of Computing in Civil Engineering, 25(1), pp. 66-74. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000072
  8. Dong, S., Behzadan, A. H., Chen, F., and Kamat, V. R. (2013). "Collaborative visualization of engineering processes using tabletop augmented reality." Advances in Engineering Software, 55, pp. 45-55. https://doi.org/10.1016/j.advengsoft.2012.09.001
  9. Dong, S., Feng, C., and Kamat, V. R. (2012). "Real-Time Occlusion Handling for Dynamic Augmented Reality Using Geometric Sensing and Graphical Shading." Journal of Computing in Civil Engineering, 27(6), 607-621. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000278
  10. Dunston, P. S., and Wang, X. (2005). "Mixed realitybased visualization interfaces for architecture, engineering, and construction industry." Journal of construction engineering and management, 131(12), pp. 1301-1309. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:12(1301)
  11. Feng, C.-W., Chen, Y.-J., and Huang, J.-R. (2010). "Using the MD CAD model to develop the timecost integrated schedule for construction projects." Automation in Construction, 19(3), pp. 347-356. https://doi.org/10.1016/j.autcon.2009.12.009
  12. Golparvar-Fard, M., Pena-Mora, F., and Savarese, S. (2009). "Application of D4AR-A 4-Dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication." ITcon.
  13. Golparvar-Fard, M., Pena-Mora, F., and Savarese, S. (2011). "Integrated Sequential As-Built and As-Planned Representation with D(4)AR Tools in Support of Decision-Making Tasks in the AEC/FM Industry." J. Constr. Eng. Manage.-ASCE, 137(12), pp. 1099-1116. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000371
  14. Hammad, A., Wang, H., and Mudur, S. P. (2009). "Distributed Augmented Reality for Visualizing Collaborative Construction Tasks." Journal of Computing in Civil Engineering, 23(6), pp. 418-427. https://doi.org/10.1061/(ASCE)0887-3801(2009)23:6(418)
  15. Hartmann, T., Gao, J., and Fischer, M. (2008). "Areas of application for 3D and 4D models on construction projects." J. Constr. Eng. Manage.-ASCE, 134(10), pp. 776-785. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:10(776)
  16. Heesom, D., and Mahdjoubi, L. (2004). "Trends of 4D CAD applications for construction planning." Construction Management and Economics, 22(2), pp. 171-182. https://doi.org/10.1080/0144619042000201376
  17. Hou, L., Wang, X., Bernold, L., and Love, P. E. (2013a) . "Using Animated Augmented Reality to Cognitively Guide Assembly." Journal of Computing in Civil Engineering, 27(5), pp. 439-451. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000184
  18. Hou, L., Wang, X., and Truijens, M. (2013b). "Using Augmented Reality to Facilitate Piping Assembly: An Experiment-Based Evaluation." Journal of Computing in Civil Engineering.
  19. Jeong, S., Heo, J., and Woo, S. (2009). 'Development of Building Monitoring Techniques Using Augmented Reality', Korean journal of Construction Engineering and Management, KICEM, 10(6), pp. 3-12.
  20. Jongeling, R., and Olofsson, T. (2007). "A method for planning of work-flow by combined use of locationbased scheduling and 4D CAD." Automation in Construction, 16(2), pp. 189-198. https://doi.org/10.1016/j.autcon.2006.04.001
  21. Kamat, V. R., Martinez, J. C., Fischer, M., Golparvar-Fard, M., Pena-Mora, F., and Savarese, S. (2011). "Research in Visualization Techniques for Field Construction." J. Constr. Eng. Manage.-ASCE, 137(10), pp. 853-862. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000262
  22. Kang, L.-S., Moon, H.-S., Park, S.-Y., Kim, C.-H., and Lee, T. S. (2010). "Improved link system between schedule data and 3D object in 4D CAD system by using WBS code." KSCE J. Civ. Eng., 14(6), pp. 803-814. https://doi.org/10.1007/s12205-010-0960-4
  23. Kang, L., Pyeon, J., Moon, H., Kim, C., and Kang, M. (2013). "Development of Improved 4D CAD System for Horizontal Works in Civil Engineering Projects." Journal of Computing in Civil Engineering, 27(3), pp. 212-230. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000216
  24. Kim, C., Kim, H., Park, T., and Kim, M. K. (2011). "Applicability of 4D CAD in Civil Engineering Construction: Case Study of a Cable-Stayed Bridge Project." Journal of Computing in Civil Engineering, 25(1), pp. 98-107. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000074
  25. Kim, C., Kim, B., and Kim, H. (2013). "4D CAD model updating using image processing-based construction progress monitoring." Automation in Construction, 35(0), pp. 44-52. https://doi.org/10.1016/j.autcon.2013.03.005
  26. Koo, B., and Fischer, M. (2000). "Feasibility study of 4D CAD in commercial construction." J. Constr. Eng. Manage.-ASCE, 126(4), pp. 251-260. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:4(251)
  27. Kim, B., Kim, C., and Kim, H. (2012). "Interactive Modeler for Construction Equipment Operation Using Augmented Reality." Journal of Computing in Civil Engineering, 26(3), pp. 331-341. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000137
  28. Mahalingam, A., Kashyap, R., and Mahajan, C. (2010). "An evaluation of the applicability of 4D CAD on construction projects." Automation in Construction, 19(2), pp. 148-159. https://doi.org/10.1016/j.autcon.2009.11.015
  29. Moon, D. and Kwon, S. (2014). "Development of Mobile-Based Process and System for Pipe Management of Construction Using NFC(Near Field Communication) and Augmented Reality Technology", Korean journal of Construction Engineering and Management, KICEM, 15(2), pp. 122-131. https://doi.org/10.6106/KJCEM.2014.15.2.122
  30. Russell, A., Staub-French, S., Tran, N., and Wong, W. (2009). "Visualizing high-rise building construction strategies using linear scheduling and 4D CAD." Automation in Construction, 18(2), pp. 219-236. https://doi.org/10.1016/j.autcon.2008.08.001
  31. Shin, D. H., and Dunston, P. S. (2008). "Identification of application areas for Augmented Reality in industrial construction based on technology suitability." Automation in Construction, 17(7), pp. 882-894. https://doi.org/10.1016/j.autcon.2008.02.012
  32. Shin, D. H., and Dunston, P. S. (2009). "Evaluation of Augmented Reality in steel column inspection." Automation in Construction, 18(2), pp. 118-129. https://doi.org/10.1016/j.autcon.2008.05.007
  33. Shin, D. H., and Dunston, P. S. (2010). "Technology development needs for advancing Augmented Reality-based inspection." Automation in Construction, 19(2), pp. 169-182. https://doi.org/10.1016/j.autcon.2009.11.001
  34. Wang, X. Y., and Dunston, P. S. (2006). "Compatibility issues in augmented reality systems for AEC: An experimental prototype study." Automation in Construction, 15(3), pp. 314-326. https://doi.org/10.1016/j.autcon.2005.06.002
  35. Wang, X. and Dunston, P. (2006). "Potential of Augmented Reality as an Assistant Viewer for Computer-Aided Drawing." J. Comput. Civ. Eng., 20(6), pp. 437-441. https://doi.org/10.1061/(ASCE)0887-3801(2006)20:6(437)
  36. Yeh, K.-C., Tsai, M.-H., and Kang, S.-C. (2012). "On-Site Building Information Retrieval by Using Projection-Based Augmented Reality." Journal of Computing in Civil Engineering, 26(3), pp. 342-355. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000156
  37. Zollmann, S., Hoppe, C., Kluckner, S., Poglitsch, C., Bischof, H., and Reitmayr, G. (2014). "Augmented Reality for Construction Site Monitoring and Documentation." Proceedings of the Ieee, 102(2), pp. 137-154. https://doi.org/10.1109/JPROC.2013.2294314