References
- Behzadan, A. H., and Kamat, V. R. (2009). "Automated generation of operations level construction animations in outdoor augmented reality." Journal of Computing in Civil Engineering, 23(6), pp. 405-417. https://doi.org/10.1061/(ASCE)0887-3801(2009)23:6(405)
- Behzadan, A. H., and Kamat, V. R. (2010). "Scalable Algorithm for Resolving Incorrect Occlusion in Dynamic Augmented Reality Engineering Environments." Computer-Aided Civil and Infrastructure Engineering, 25(1), pp. 3-19. https://doi.org/10.1111/j.1467-8667.2009.00601.x
- Benjaoran, V., and Bhokha, S. (2010). "An integrated safety management with construction management using 4D CAD model." Saf. Sci., 48(3), pp. 395-403. https://doi.org/10.1016/j.ssci.2009.09.009
- Chang, J.-R., Hsu, H.-M., and Chao, S.-J. (2012). "Development of a Road Monitoring and Reporting System Based on Location-Based Services and Augmented-Reality Technologies." J. Perform. Constr. Facil., 26(6), pp. 812-823. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000272
- Chin, S., Yoon, S., Choi, C., and Cho, C. (2008). "RFID+4D CAD for progress management of structural steel works in high-rise buildings." Journal of Computing in Civil Engineering, 22(2), pp. 74-89. https://doi.org/10.1061/(ASCE)0887-3801(2008)22:2(74)
- Chua, D. K. H., Yeoh, K. W., and Song, Y. (2010). "Quantification of Spatial Temporal Congestion in Four-Dimensional Computer-Aided Design." J. Constr. Eng. Manage.-ASCE, 136(6), pp. 641-649. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000166
- Dai, F., Lu, M., and Kamat, V. R. (2011). "Analytical Approach to Augmenting Site Photos with 3D Graphics of Underground Infrastructure in Construction Engineering Applications." Journal of Computing in Civil Engineering, 25(1), pp. 66-74. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000072
- Dong, S., Behzadan, A. H., Chen, F., and Kamat, V. R. (2013). "Collaborative visualization of engineering processes using tabletop augmented reality." Advances in Engineering Software, 55, pp. 45-55. https://doi.org/10.1016/j.advengsoft.2012.09.001
- Dong, S., Feng, C., and Kamat, V. R. (2012). "Real-Time Occlusion Handling for Dynamic Augmented Reality Using Geometric Sensing and Graphical Shading." Journal of Computing in Civil Engineering, 27(6), 607-621. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000278
- Dunston, P. S., and Wang, X. (2005). "Mixed realitybased visualization interfaces for architecture, engineering, and construction industry." Journal of construction engineering and management, 131(12), pp. 1301-1309. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:12(1301)
- Feng, C.-W., Chen, Y.-J., and Huang, J.-R. (2010). "Using the MD CAD model to develop the timecost integrated schedule for construction projects." Automation in Construction, 19(3), pp. 347-356. https://doi.org/10.1016/j.autcon.2009.12.009
- Golparvar-Fard, M., Pena-Mora, F., and Savarese, S. (2009). "Application of D4AR-A 4-Dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication." ITcon.
- Golparvar-Fard, M., Pena-Mora, F., and Savarese, S. (2011). "Integrated Sequential As-Built and As-Planned Representation with D(4)AR Tools in Support of Decision-Making Tasks in the AEC/FM Industry." J. Constr. Eng. Manage.-ASCE, 137(12), pp. 1099-1116. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000371
- Hammad, A., Wang, H., and Mudur, S. P. (2009). "Distributed Augmented Reality for Visualizing Collaborative Construction Tasks." Journal of Computing in Civil Engineering, 23(6), pp. 418-427. https://doi.org/10.1061/(ASCE)0887-3801(2009)23:6(418)
- Hartmann, T., Gao, J., and Fischer, M. (2008). "Areas of application for 3D and 4D models on construction projects." J. Constr. Eng. Manage.-ASCE, 134(10), pp. 776-785. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:10(776)
- Heesom, D., and Mahdjoubi, L. (2004). "Trends of 4D CAD applications for construction planning." Construction Management and Economics, 22(2), pp. 171-182. https://doi.org/10.1080/0144619042000201376
- Hou, L., Wang, X., Bernold, L., and Love, P. E. (2013a) . "Using Animated Augmented Reality to Cognitively Guide Assembly." Journal of Computing in Civil Engineering, 27(5), pp. 439-451. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000184
- Hou, L., Wang, X., and Truijens, M. (2013b). "Using Augmented Reality to Facilitate Piping Assembly: An Experiment-Based Evaluation." Journal of Computing in Civil Engineering.
- Jeong, S., Heo, J., and Woo, S. (2009). 'Development of Building Monitoring Techniques Using Augmented Reality', Korean journal of Construction Engineering and Management, KICEM, 10(6), pp. 3-12.
- Jongeling, R., and Olofsson, T. (2007). "A method for planning of work-flow by combined use of locationbased scheduling and 4D CAD." Automation in Construction, 16(2), pp. 189-198. https://doi.org/10.1016/j.autcon.2006.04.001
- Kamat, V. R., Martinez, J. C., Fischer, M., Golparvar-Fard, M., Pena-Mora, F., and Savarese, S. (2011). "Research in Visualization Techniques for Field Construction." J. Constr. Eng. Manage.-ASCE, 137(10), pp. 853-862. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000262
- Kang, L.-S., Moon, H.-S., Park, S.-Y., Kim, C.-H., and Lee, T. S. (2010). "Improved link system between schedule data and 3D object in 4D CAD system by using WBS code." KSCE J. Civ. Eng., 14(6), pp. 803-814. https://doi.org/10.1007/s12205-010-0960-4
- Kang, L., Pyeon, J., Moon, H., Kim, C., and Kang, M. (2013). "Development of Improved 4D CAD System for Horizontal Works in Civil Engineering Projects." Journal of Computing in Civil Engineering, 27(3), pp. 212-230. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000216
- Kim, C., Kim, H., Park, T., and Kim, M. K. (2011). "Applicability of 4D CAD in Civil Engineering Construction: Case Study of a Cable-Stayed Bridge Project." Journal of Computing in Civil Engineering, 25(1), pp. 98-107. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000074
- Kim, C., Kim, B., and Kim, H. (2013). "4D CAD model updating using image processing-based construction progress monitoring." Automation in Construction, 35(0), pp. 44-52. https://doi.org/10.1016/j.autcon.2013.03.005
- Koo, B., and Fischer, M. (2000). "Feasibility study of 4D CAD in commercial construction." J. Constr. Eng. Manage.-ASCE, 126(4), pp. 251-260. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:4(251)
- Kim, B., Kim, C., and Kim, H. (2012). "Interactive Modeler for Construction Equipment Operation Using Augmented Reality." Journal of Computing in Civil Engineering, 26(3), pp. 331-341. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000137
- Mahalingam, A., Kashyap, R., and Mahajan, C. (2010). "An evaluation of the applicability of 4D CAD on construction projects." Automation in Construction, 19(2), pp. 148-159. https://doi.org/10.1016/j.autcon.2009.11.015
- Moon, D. and Kwon, S. (2014). "Development of Mobile-Based Process and System for Pipe Management of Construction Using NFC(Near Field Communication) and Augmented Reality Technology", Korean journal of Construction Engineering and Management, KICEM, 15(2), pp. 122-131. https://doi.org/10.6106/KJCEM.2014.15.2.122
- Russell, A., Staub-French, S., Tran, N., and Wong, W. (2009). "Visualizing high-rise building construction strategies using linear scheduling and 4D CAD." Automation in Construction, 18(2), pp. 219-236. https://doi.org/10.1016/j.autcon.2008.08.001
- Shin, D. H., and Dunston, P. S. (2008). "Identification of application areas for Augmented Reality in industrial construction based on technology suitability." Automation in Construction, 17(7), pp. 882-894. https://doi.org/10.1016/j.autcon.2008.02.012
- Shin, D. H., and Dunston, P. S. (2009). "Evaluation of Augmented Reality in steel column inspection." Automation in Construction, 18(2), pp. 118-129. https://doi.org/10.1016/j.autcon.2008.05.007
- Shin, D. H., and Dunston, P. S. (2010). "Technology development needs for advancing Augmented Reality-based inspection." Automation in Construction, 19(2), pp. 169-182. https://doi.org/10.1016/j.autcon.2009.11.001
- Wang, X. Y., and Dunston, P. S. (2006). "Compatibility issues in augmented reality systems for AEC: An experimental prototype study." Automation in Construction, 15(3), pp. 314-326. https://doi.org/10.1016/j.autcon.2005.06.002
- Wang, X. and Dunston, P. (2006). "Potential of Augmented Reality as an Assistant Viewer for Computer-Aided Drawing." J. Comput. Civ. Eng., 20(6), pp. 437-441. https://doi.org/10.1061/(ASCE)0887-3801(2006)20:6(437)
- Yeh, K.-C., Tsai, M.-H., and Kang, S.-C. (2012). "On-Site Building Information Retrieval by Using Projection-Based Augmented Reality." Journal of Computing in Civil Engineering, 26(3), pp. 342-355. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000156
- Zollmann, S., Hoppe, C., Kluckner, S., Poglitsch, C., Bischof, H., and Reitmayr, G. (2014). "Augmented Reality for Construction Site Monitoring and Documentation." Proceedings of the Ieee, 102(2), pp. 137-154. https://doi.org/10.1109/JPROC.2013.2294314