In this paper, A CMOS power amplifier for PCS is designed with 0.65-$\mu\textrm{m}$ CMOS technology. Differential cascode structure is used which has good reverse isolation and wide voltage swing. This amplifier circuits consist of three stages which are power amplification stage, driver stage and power control stage. We obtain output power of 30 ㏈m, IMD3 of -31㏈c and efficiency of 30 % at input power of 4 ㏈m.
As Utility interactive fuel cell systems are widely used, it is required for each power conditioning system(PCS) to have higher generating performance and more stable connecting characteristics. This study is focused to minimization of power losses and hence higher efficiency related to the new half bridge type 3-stage utility interactive PCS topology. The loss factor of half-bridge converter becomes only 1.2[%] under the rated load, and hence total efficiency is maintained to be higher as 91[%].
International Journal of Advanced Culture Technology
/
v.7
no.4
/
pp.96-103
/
2019
In this paper, we propose two-stage multichannel architecture for oyster product management system, called cloud stage and agent stage. There are two communication channels at each stage. In cloud stage, the embedded system in the smart scale communicates with the server through two channels, Ethernet or 3G/LTE mobile communication. In agent stage, PCs and smart phones called agents communicate with the server also through Internet and 3G/LTE mobile communication. Compared with previous system in which the amount of the oyster produced in oyster workplaces could be monitored only at the console of only one oyster main server, developed system makes it possible to monitor the amount of produced oyster at several PCs (or smart phones). In addition to the amount of oysters produced at all oyster workplaces the environment of oyster workplaces such as temperature and humidity can be monitored on agents to judge the freshness. Two-stage architecture with multiple channels makes it possible to monitor the amount of oyster product and environment of the oyster workplace at any place in real time.
In this paper, to implement PCS (Physical Coding Sublayer) of 10GBASE-R type, we present 2 stage pipeline 64b/66b Encoder/Decoder which operates at 156.25MHz standard specification and designed to minimize clock latency as possible as we can. The proposed circuit was designed based on Verilog hardware description language and measured for functional verification on VertexII-1000fg456 chip of Xilinx Inc.. Total equivalent gate count is 47,303 and estimated power consumption is 351mW at Vcc 3.3V.
계통연계형 태양광 PCS는 주로 전압원 인버터와 전압의 승압을 위한 DC/DC컨버터, 즉 이단구조로 구성된다. Z-소스 인버터는 DC/DC컨버터 없이 전압을 승/감압할 수 있다. 3k급 계통연계형 태양광 PCS에 Z-소스 인버터를 적용하여 일단구조로 설계하였고 PSIM 시뮬레이션과 실험을 통하여 타당성을 검증하였다.
Seung-Hyun Rhee;Young-Seok Kweon;Dong-Ok Won;Seong-Whan Lee;Kwang-Suk Seo
Journal of Dental Anesthesia and Pain Medicine
/
v.24
no.1
/
pp.19-35
/
2024
Background: This study investigated a safe and effective bolus dose and lockout time for patient-controlled sedation (PCS) with dexmedetomidine for dental treatments. The depth of sedation, vital signs, and patient satisfaction were investigated to demonstrate safety. Methods: Thirty patients requiring dental scaling were enrolled and randomly divided into three groups based on bolus doses and lockout times: group 1 (low dose group, bolus dose 0.05 ㎍/kg, 1-minute lockout time), group 2 (middle dose group, 0.1 ㎍/kg, 1-minute), and group 3 (high dose group, 0.2 ㎍/kg, 3-minute) (n = 10 each). ECG, pulse, oxygen saturation, blood pressure, end-tidal CO2, respiratory rate, and bispectral index scores (BIS) were measured and recorded. The study was conducted in two stages: the first involved sedation without dental treatment and the second included sedation with dental scaling. Patients were instructed to press the drug demand button every 10 s, and the process of falling asleep and waking up was repeated 1-5 times. In the second stage, during dental scaling, patients were instructed to press the drug demand button. Loss of responsiveness (LOR) was defined as failure to respond to auditory stimuli six times, determining sleep onset. Patient and dentist satisfaction were assessed before and after experimentation. Results: Thirty patients (22 males) participated in the study. Scaling was performed in 29 patients after excluding one who experienced dizziness during the first stage. The average number of drug administrations until first LOR was significantly lower in group 3 (2.8 times) than groups 1 and 2 (8.0 and 6.5 times, respectively). The time taken to reach the LOR showed no difference between groups. During the second stage, the average time required to reach the LOR during scaling was 583.4 seconds. The effect site concentrations (Ce) was significantly lower in group 1 than groups 2 and 3. In the participant survey on PCS, 8/10 in group 3 reported partial memory loss, whereas 17/20 in groups 1 and 2 recalled the procedure fully or partially. Conclusion: PCS with dexmedetomidine can provide a rapid onset of sedation, safe vital sign management, and minimal side effects, thus facilitating smooth dental sedation.
Journal of the Korea Institute of Information and Communication Engineering
/
v.2
no.3
/
pp.353-358
/
1998
This paper presents development of a LNA operating at 1.71 ∼ 1.18 GHz used for a receiver of KOREA PCS base station and transponder. Using resistive decoupling circuits, a signal at low frequency is dissipated by a resistor. This design method increases the stability of the LNA and suitable for input stage matching. The LNA consists of low noise GaAs FET ATF-10136 and internally matched VNA-25. The LNA is fabricated with both the RF circuit and the self-bias circuits in aluminum housing. As a result, the characteristics of the LNA implemented here shows 30 dB in gain and 0.85 dB in noise figure.
Background: The aim of our present study was to compare quality of life (QoL) between intermediate-stage (BCLC-B) HCC patients who had undergone either liver resection or transcatheter arterial chemoembolization (TACE). Materials and Methods: A total of 102 intermediate-stage HCC patients participated in our study, including 58 who had undergone liver resection and 44 who had undergone TACE. Baseline demographic characteristics, tumor characteristics, and long-term outcomes, such as tumor recurrence, were compared and analyzed. QoL was assessed using the Short Form (SF)-36 health survey questionnaire with the mental and physical component scales (SF-36 MCS and PCS). This questionnaire was filled out at HCC diagnosis and 1, 3, 6, 12, 24 months after surgery. Results: For the preoperative QoL evaluation, the 8 domains related to QoL were comparable between the two groups. The PCS and MCS scores were significantly decreased in both the TACE and resection groups at1 month after surgery, and this decrease was greater in the resection group. These scores were significantly lower in the resection group compared with the TACE group (P<0.05). However, these differences disappeared at 3 and 6 months following surgery. One year after surgery, the resection group showed much higher PCS scores than the TACE patients (P=0.018), and at 2 years after surgery, the PCS and MCS scores for the resection group were significantly higher than those for the TACE group (P<0.05). Eleven patients (19.0%) in the resection group and 17 (38.6%) in the TACE group suffered HCC recurrence (P<0.05). Univariate and multivariate analyses indicated that tumor recurrence (HR=1.211, 95%CI: 1.086-1.415, P=0.012) was a significant risk factor for poorpostoperative QoL in the HCC patients.Conclusions: Due to its effects on reducing HCC recurrence and improving long-term QoL, liver resection should be the first choice for the treatment of patients with intermediate-stage HCC.
The Journal of Korea Institute of Information, Electronics, and Communication Technology
/
v.14
no.1
/
pp.56-69
/
2021
In this paper, the PV system with a link to the commercial system needs some advantages like small capacity, high power factor, high reliability, low harmonic output, maximum power operation of solar cell, and low cost, etc. as well as the properties of inverter. To transfer the PV energy of photovoltaic power generation system to the system and load, it requires PCS in both directions. The purpose of this paper is to confirm the stable power supply through the load leveling by presenting the PCS considering ESS of photovoltaic power generation. In order to achieve these purpose, 5 step process of operation mode algorithm were used according to the solar insolation amount and load capacity and the controller for charging/ discharging control was designed. For bidirectional and effective energy transfer, the bidirectional converter and battery at DC-link stage were connected and the DC-link voltage and inverter output voltage through the interactive inverter were controlled. In order to prove the validity of the suggested system, the simulation using PSIM was performed and were reviewed for its validity and stability. The 3[kW] PCS was manufactured and its test was conducted in order to check this situation. In addition, the system characteristics suggested through the test results was verified and the PCS system presented in this study was excellent and stronger than that of before system.
The Journal of Korean Institute of Communications and Information Sciences
/
v.22
no.12
/
pp.2674-2685
/
1997
In this paper, the design and imprlementation of dual-band power amplifier which is used as a critical part for mobile phone to be simultaneously working at a dual band, 800MHz CDAM and PCS frequency band is described. DC operating point of power FET is limited to Class-B to enable long talk time considering that the tyupical power range of CDMA phones in working is around 10 to Class-B to enable long talk time considering that the typical power range of CDMA phones in working is around 10 to 15dBm, i.e., liner range. The power amplifier which employs two GaAs FETs with good linerity at a low operating point has duplexer cuplexer circuit to separate two frequency bands at input and output stage. Electromagnetic analysis for via holes and coupling between narrow transmission lines is included to design a circuit. Moduld size of 0.96CC($22{\times}14.5{\times}3mm^3$) and maximum module current of 130mA at output power range, 10 to 15dBm are attained. The power amplifer module has achieved ACPR performance with 2 to 3dB marging from IS-95 requirement at output powers, 23.5dBm for PCS and 28dBm for 800MHz CDMA respectively.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.