• 제목/요약/키워드: 2nd Construction

검색결과 263건 처리시간 0.029초

DEVELOPMENT OF A WEB-BASED GEO-SPATIAL INFORMATION SYSTEM FOR THE ANALYSIS AND EVALUATION OF SOIL DATA

  • YongGu Jang;SangHoon Lee;HoYun Kang;InJoon Kang
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1396-1403
    • /
    • 2009
  • The Ministry of Construction and Transportation (MOCT) has been constructing a nationwide soil information DB since 2000, as basic data for the construction of 'underground geographical information,' a project under the 2nd National Geo-spatial Information System (NGIS) master plan. The inputted soil information includes not only underground conditions such as the layer depth, type, color, and groundwater level, but also engineering information that can be applied to construction work design, such as on the standard penetration test and the compression test. It is difficult to use this information in soil analysis and design, however, because only the test results are currently available. A web-based geo-spatial information system was developed in this study to facilitate the effective application of the soil information database (DB). First, the space information, layer information, and engineering test information were loaded from the soil information DB in real time, and the earth volume, bearing capacity, and settlement were calculated to develop a web client that will evaluate the ground softness and liquefaction. It seems that the soil information DB can be actively applied to the planning and design of construction works using this system.

  • PDF

하중조건을 고려한 제주 화산암지대의 지반 안정성 평가 (Ground Stability Evaluation of Volcanic Rock Area in Jeju according to the Loading Conditions)

  • 한희수;백용
    • 지질공학
    • /
    • 제31권2호
    • /
    • pp.199-209
    • /
    • 2021
  • 본 논문은 SOC시설물 건설에 따른 지반 안정성을 평가한 논문으로, 기존 지반 및 숨골 조사결과에 따른 지반 물성치를 이용하여 SOC시설물 하부지반의 안정성을 평가한 것이다. 연구내용은 다음과 같다. 1) 기존 지반조사 자료를 기반으로 지반현황을 분석하여 숨골 및 지반 물성치를 산정하였다. 2) 수치해석을 통한 지반의 안정성 및 변형 범위를 파악하였다. 3) 지반안정성 해석단면(대형장비 주행로) 결정한 후 단면에 대한 모델링을 하여, 지반 안정성을 평가하였다. 본 연구는 SOC시설물 전체 부지를 크게 3개의 단면으로 나누어 해석하였으며, SOC시설물 하부지반의 각 단면별 지반, 하중조건 및 포장조건을 파악하여 컴퓨터 수치해석 모델링을 통해 응력, 침하량, 변형률을 산정하였다. 현 지반 조건에 따른 각 단면별 해석결과, 침하량은 0.11~0.18 m, 전응력은 92.75~445 kPa로 해석되었다. 이 결과들은 하부지반의 숨골을 고려하여 지반의 강도 정수를 감소시켰을 뿐 아니라, 하부지반의 보강이 없는 조건으로 해석한 결과이므로, 적절한 하부지반의 조건을 고려하여 약액주입 등의 간단한 지반 보강만으로 충분한 SOC시설물 지반 안정성을 확보할 수 있다.

방사성폐기물 동굴처분과 지하시험시설 (Rock Cavern for Radioactive Waste Disposal and Underground Research)

  • 강병무
    • 화약ㆍ발파
    • /
    • 제9권2호
    • /
    • pp.19-30
    • /
    • 1991
  • The trend of Radio active waste disposal project is generally to choose The Rock Cavern type because it is the most safest and easy to get concent from The neighbor hood. On the Construction of rock Cavern for R -A. W.0 has to take care follows ; The first of all, to survey rock crack formation. 2nd, The Movement of Underground water. 3rd, Nuclear and Geochemical problems. 4th, to examine physical feature of rocks ets.

  • PDF

서울지하철 6호선 건설계획 (Planning and Design of Seoul Subway Line 6)

  • 박계병;이인근
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1993년도 지하공간 건설기술에 관한 서울 심포지움 논문집
    • /
    • pp.3-30
    • /
    • 1993
  • To ease traffic congestion Seoul Metropolitan Government formulated the 2nd Phase of Seoul Subway Construction Scheme in 1989. The scheme calls for the construction of %60 km of subway which includes addition of 4 more subway lines and extension of 3 existing subway lines in addition to the existing 118 km of subway. As a final stage of the scheme subway line 6 is under planning and design. The line 6 is 36.1 km-long route connecting Ungam-Samgakchi-Changsin-Sinnae. Except for the depot main line wilts be underground and major construction methods are cut and cover and tunnelling. As a tunnelling method New Austrian Tunnelling Method will be adapted. The line will be opened by the end of 1997. With the completion of the line Seoul will have 278 km of subway network and the transport share by subway will be increased from 25% in 1992 to 50% in 1997.

  • PDF

장수명 공동주택 표준모델 개발을 위한 실험주택 건립과 현장적용성 평가 (Constructing Mock-up House and Evaluating Field Application for Development of Standard Long-Life Housing Model)

  • 진주원;장한두;최경렬;박준영
    • 한국주거학회:학술대회논문집
    • /
    • 한국주거학회 2008년 추계학술발표대회 논문집
    • /
    • pp.167-172
    • /
    • 2008
  • The ultimate objective of this research is to develop the technologies for the construction of 100-year housing as the first task for improving housing environments. The technological development of 100-year housing makes it possible to advance construction technologies and part development, to develop long-life housing with durability and Flexibility responding to customers' needs for future living space. At first, for this purpose, the applications according to the types of the Standard Model of Long-life Housing are proposed to respond to the life-cycle of near-future demographic and social structure, and the construction of the Mock-up House execute based on the location selected during the 2nd year and the basic plan. Then the Standard Model of Long-life Housing are advanced and proposed through evaluating the field applicability of the Mock-Up House.

  • PDF

콘크리트궤도 적용 경부고속철도의 시공 중 토압 경향 분석 연구 (An analysis study on earth pressure trends during construction of Gyungbu High Speed Railway using Concrete Track)

  • 김기환;김대상;나성훈;신기대
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.671-679
    • /
    • 2010
  • The construction of concrete track for the first time in Korea gives lots of meanings to civil engineering in various aspects. Settlement level needs to be kept minimal for the safety of the track. Concrete track has different structural characteristics comparing to conventional ballast track, so load distribution in concrete track is also different. Since it is the first time to build concrete track, there are very few experience and data available on the subject. Therefore it is important to evaluate how much load is transferred to the ground due to the running vehicle in concrete track and to determine the optimal thickness of layers. In this research, 9 individual earth pressure cells were installed at OOOk930 site in 2nd stage of Kyungbu high speed railway during under construction. The in-situ pressure data were measured at each layers during pump-car and locomotive were moving on the high speed railway surface.

  • PDF

ESG-oriented Governance Work System for Smart Highway Implementation

  • Bong-Shik, Yun;So-Wol, Yoo
    • 스마트미디어저널
    • /
    • 제11권10호
    • /
    • pp.36-45
    • /
    • 2022
  • This study was promoted to prepare an ESG-oriented work system for Korea Expressway Corporation through sustainable highway construction, IOT-based smart highway preparation, and establishment of a broad convergence business governance system between multiple ministries and implementing entities. Based on the 2nd Basic Plan for Landscape Policy (2020~2024) and the Public Design Promotion Act (2018~2022), the study was conducted through the improvement of the highway design method to be applied for four years from 2021 to 2024, the changes in construction and social conditions related to expressways, the analysis of policies and plans to secure consistency with the 'Korean New Deal', and the analysis of the project performance and work promotion system that the Korea Expressway Corporation's business execution organization has promoted together with each government department. The results of this research are expected to help the Korea Expressway Corporation establish the 21st Innovation Plan for the phased construction of a "100-years landscape with people" and the preparation of a sustainable future highway environment creation project for the lives and safety of the people.

건설공사 공기단축으로 인한 추가비용의 산정규정에 관한 연구 (A Study of the Regulations for Calculation of Acceleration Costs on Construction Work)

  • 민병욱;박형근
    • 대한토목학회논문집
    • /
    • 제37권2호
    • /
    • pp.409-417
    • /
    • 2017
  • 본 연구는 건설 공사도중 계약상대자의 책임 없는 사유로 인하여 공사기간이 단축되는 경우 발생하는 추가비용과 관련하여 계약 당사자 사이에 발생하는 분쟁을 예방하는 방안의 연구를 목적으로 하였다. 공기단축으로 인한 추가비용에 대한 클레임 사례 및 법원의 판결 사례등을 검토한 결과 추가비용 산정에 대한 규정의 미비가 대표적인 문제점으로 나타났다. 이러한 문제점에 대한 연구의 결과로 1단계에서 추가비용을 처리하는 절차를 제시하였고, 절차 중 공기단축 계획 및 승인과정을 거치도록 하여 계약 당사자 사이의 추가비용에 대한 다툼을 예방하도록 하였다. 2단계로 추가비용 산정과 관련된 현행 규정의 미비한 문제점을 해소하는 규정의 제정 및 개정 방안을 제시하였다. 본 연구에서 제시한 절차 및 규정의 제 개정 방안을 통하여 공기단축과 관련한 현행 규정이 미비한 문제점을 해소하고 분쟁을 예방하며 이로 인한 손실 등을 방지하는 등 선진화된 계약관리의 기초가 되도록 하고자 한다.

인천국제공항건설 사업관리 경험 (Introduction to CM Experience from Incheon International Airport (IIA) Construction Project)

  • 박대원
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.20-25
    • /
    • 2004
  • 2003년 7월 18일 인칠공항공사는 동북아의 중추공항(Hub-Airport)건설을 목표로 단계적으로 추진되는 인천국제공항 2단계건석사업에 필요한 전문적인 사업관리 기술을 지원 받기 위하여 KIDS 컨소시엄(건원, ITM, 도화, 공간으로 구성된 컨소시엄)과 2단계 건설사업관리 기술지원용역계약을 체결하였다. 2단계 건설사업은 250만 평의 부지조성, 제3활주로, 계류장,원격탑승동, 무인자동열차, 고속수하물처리시설, 화물터미널. 등과 필요한 시설물을 2008년 말까지 완료하는 것으로 계획되어 있으며 CM계약자는 기 구축된 공항공사의 각종 사업관리 Tool을 이용하여 공정관리를 포함한 종합사업관리, 건축/전럭시설의 설계감리. IAT/BHS 등의 설계관리. 품질 및 시운전관리 등의 업무에 국내외 전문인력을 공항공사의 사업관리 조직에 투입하여 공사직원들과 함께 사업목표 달성을 위해 매진하고 있다. 본 고에서는 인천공항공사에서 수행하고 있는 건설사업관리사례를 주요업무 중심으로 소개해 보고자 한다.

  • PDF

측량 및 지형공간정보산업과 제2차 국가지리정보체계 구축 사업계획 (Surveying & Geo-Spatial Information Industries & 2nd National Geo-Information System(NGIS) Master Plan)

  • 조영원
    • 기술사
    • /
    • 제34권1호
    • /
    • pp.44-48
    • /
    • 2001
  • 공간 인프라 구축과 국토 정보화를 통해 국민들의 삶의 질을 향상시키고 국가 경쟁력을 높이기 위하여 단계적으로 추진중인 NGIS 구축 사업에 대한 내용과 제2차 NCIS 기본계획에 대해 알아보고자 한다. NGIS 구축은 21세기 국가 정보화의 핵심사업이며, 국민의 실생활에도 많은 영향을 미칠 중요한 정보화 사업으로 측량 및 지형공간정보산업 분야 관계자는 물론이고 관련된 모든 분야에서 끊임없는 기술개발과 관련 제도의 정비를 통하여 시너지 효과를 창출하고 우리나라의 국토정보화를 위하여 노력해야 한다.

  • PDF