• Title/Summary/Keyword: 2D Drawings

Search Result 182, Processing Time 0.021 seconds

Introducing and Surveying 4D Models in AEC Industry (4D 공정관리시스템의 개발현황 조사연구)

  • Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.137-142
    • /
    • 2001
  • The traditional schedule management system provides project manager with analysis reports, such as progress control, earned value management and resource management, including schedule chart. However, the reports and functions in the traditional system are still limited in 2D concept. Recently, the scheduling method is using 4D concept that time of construction schedule is linked to space of drawings. This study presents the limitation of those systems and an improved method for developing 4D system through the comparative analysis of representative 4D systems that are developed up to date.

  • PDF

Sharing Ship Design Model Based on STEP methodology (STEP 방법론을 이용한 선박설계 모델의 공유)

  • Yong-Jae Shin;Soon-Hung Han
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.35 no.4
    • /
    • pp.98-108
    • /
    • 1998
  • Hull design data is currently prepared by a 2D CAD system and re-input to 3D CAD systems specialized for detail design or to a structural analysis system. In this paper, sharing design data among different CAD systems has been studied. Based on STEP methodology, a neutral model is generated from 2D AutoCAD drawings. To handle a geometric data of this model, the non-manifold model of ACIS is used because it can support various CAD data representation such as 2D graphic entities, 3D wireframe, 3D surface model, and solid B-Rep/CSG model. It is observed that a mon-manifold model can easily be transformed to a 3-D wireframe model for the hull detail design system AutoDef or a FE model for the structural analysis system Nastran.

  • PDF

Investigation on the 3-D design guidelines of structures (구조물의 3차원 설계 패러다임을 위한 지침에 대한 고찰)

  • Shim, Chang-Su;Kim, Yong-Han;Jeon, Seung-Min;Kwak, Tae-Young
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.301-306
    • /
    • 2007
  • Design of civil infrastructures is generally based on 2-D drawings and analyses. Design provisions also specify the limit states using member based equations. Most construction projects are done through collaboration of engineers who have different specialized knowledge. Information technologies can dramatically enhance the performance of the collaboration. For the information transfer, we need a mediator between engineers. Object based 3-D models are useful for the communication and for the owners who have to maintain whole the information of infrastructures. In this paper, basic guidelines for the 3-D design according to design phases. Adequate interoperability of 3-D objects from any CAD system is essential for the collaboration. Owners, contractors and design consultants were considered as users of 3-D objects. Cost and performance of each design phases was investigated through the existing data.

  • PDF

Implementation of Topological Operators for the Effective Non-manifold CAD System (효율적인 복합다양체 CAD 시스템 위상 작업자 구현)

  • 최국헌
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2004.10a
    • /
    • pp.382-387
    • /
    • 2004
  • As the increasing needs in the industrial filed, many studies for the 3D CAD system are carried out. There are two types of 3D CAD system. One is manifold modeler, the other is non-manifold modeler. In the manifold modeler only 3D objects can be modeled. In the non-manifold modeler 3D, 2D, 1D, and 0D objects can be modeled in a unified data structure. Recently there are many studies on the non-manifold modeler. Most of them are focused on finding unknown topological entities and representing all kinds of topological entities found. In this paper, efficient data structure is selected. The boundary information on a face and an edge is included in this data structure. The boundary information on a vertex is excluded considering the frequency of usage. Because the disk cycle information is not required in most case of modeling. It is compact. It stores essential non-manifold information such as loop cycle and radial cycle. A suitable Euler-Poincare equation is studied and selected. Using the efficient data structure and the selected Euler-Poincare equation, 18 basic Euler operators are implemented. Several 3D models are created using the implemented modeler. A non-manifold modeling can be carried out using the implemented 3D CAD system. The results of this paper could be used in the further studies such as an implementation of Boolean operators, and a translation of 2D CAD drawings to 3D models.

  • PDF

Study for Architectural Standard Details Based On BIM Information Framework (BIM 표준프레임워크 기반의 건축 표준상세도면 구축방안)

  • Kwon, Soon-Ho;Lee, Woon-Jae;Jo, Chan Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.2
    • /
    • pp.93-103
    • /
    • 2013
  • In the situation where there should be a gap between the design environments of 2D drawing and 3D BIM modeling, it is unavoidable aspect to face confusion caused by parallel usage of both technologies unless the project delivery systems are entirely upgraded to 3D. Therefore, it is critical to make efforts to minimize this confusion. Meanwhile, detailed drawings have very important roles in the construction process because they do not only concretely express construction methods for a given design plan but also provide basis for quantity takeoff and construction cost estimation etc. This paper suggests a plan to standardize detailed information based on BIM standard framework in order to make BIM realize the information. In the short term, this plan provides improved environment where both BIM and CAD technologies can be applied and, in the long term, it provides bases for BIM to replace CAD technology.

Efficiency Improvement Plan for Output Management at the Design Phase in BIM-Based Projects (국내 BIM 기반 건설 프로젝트에서의 설계단계 성과물 작성 효율화 방안에 관한 연구)

  • Kim, Ki-Nam;Seo, Hee-Chang;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.261-264
    • /
    • 2010
  • As construction projects get bigger and more complex, communication and information flow among participants become key success factors of a project. Accordingly, construction projects to respond to these changes being made in the introduction of BIM (Building Information Modeling). But as 2D drawings are still to be widely used in practical fields, it is very important that 2D drawing information could be easily and clearly projected from 3D BIM data. In this study suggest that efficiency of design phase in BIM-based construction projects for can cause confusion and additional work in traditional to BIM.

  • PDF

Artificial Intelligence Image Segmentation for Extracting Construction Formwork Elements (거푸집 부재 인식을 위한 인공지능 이미지 분할)

  • Ayesha Munira, Chowdhury;Moon, Sung-Woo
    • Journal of KIBIM
    • /
    • v.12 no.1
    • /
    • pp.1-9
    • /
    • 2022
  • Concrete formwork is a crucial component for any construction project. Artificial intelligence offers great potential to automate formwork design by offering various design options and under different criteria depending on the requirements. This study applied image segmentation in 2D formwork drawings to extract sheathing, strut and pipe support formwork elements. The proposed artificial intelligence model can recognize, classify, and extract formwork elements from 2D CAD drawing image and training and test results confirmed the model performed very well at formwork element recognition with average precision and recall better than 80%. Recognition systems for each formwork element can be implemented later to generate 3D BIM models.

Development of an Verification System for Enhancing BIM Design Base on Usability (활용성을 고려한 BIM 설계 오류 검증시스템 개발)

  • Yang, Dong-Suk
    • Land and Housing Review
    • /
    • v.8 no.1
    • /
    • pp.23-29
    • /
    • 2017
  • The BIM design is expected to expand to the domestic and overseas construction industries, depending on the effect of construction productivity and quality improvement. However, with the obligation of Public Procurement Service to design the BIM design, it includes a design error and the problem of utilization of 3D design by choosing a simple 2D to 3D remodelling method that can not be modelled in 3D modeling or use of the construction and maintenance phases. The results reviewed by BIM design results were largely underutilized and were not even performed with the verification of the error. In order to resolve this, one must develop the check system that secures the quality of BIM design and ensure that the reliability of BIM results are available. In this study, it is designed to develop a program that can automatically verify the design of the BIM design results such as violation of the rules of the BIM design, design flaws, and improve the usability of the BIM design. In particular, this programs were developed not only to identify programmes that were not commercially available, but also to validate drawings in low-light computer environments. The developed program(LH-BIM) store the information of attribute extracted from the Revit file(ArchiCAD, IFC file included) in the integrated DB. This provides the ability to freely lookup the features and properties of drawings delivered exclusively by the LH-BIM Program without using the Revit tools. By doing so, it was possible to resolve the difficulties of using traditional commercial programs and to ensure that they operate only with traditional PC performance. Further, the results of the various BIM software can be readily validated, which can be solved the conversion process error of IFC in the case of SMC. Additionally, the developed program has the ability to automatically check the error and design criteria of the drawings, as well as the ability to calculate the area estimation. These functions allow businesses to apply simple and easy tasks to operate tasks of BIM modelling. The developed system(LH-BIM) carried out a verification test by reviewing the review of the BIM Design model of the Korea Land & Housing Corporation. It is hoped that the verification system will not only be able to achieve the Quality of BIM design, but also contribute to the expansion of BIM and future construction BIM.

Parametric design을 위한 자동설계모듈 생성

  • 황선원;반갑수;이석희
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1993.04b
    • /
    • pp.359-364
    • /
    • 1993
  • As advanced method for the automatic generation of parametric models in computer-aided design systems is required for most of two-dimensional model which is represented as a set of geometric elements, and constr- aining scheme formulas. The development system uses geometirc constrainis and topology parameters which are derived from feature recognition and grouping the design entities into optimal ones from pre-designed drawings. The aim of this paper is to present guidelines for the application and development of parametric design modules for the standard parts in mechaniscal system, the basic constitutional part of mold base, and other 2D features.

Automatic feature recognition for rotational parts (회전현상 부품에서의 가공현상 특징의 자동인식에 관한 연구)

  • 이경휘;정무영
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1992.10a
    • /
    • pp.896-900
    • /
    • 1992
  • This paper presents a comprehensive methodology of automatic feature recognition for rotational parts. The parts of interest are rotational without deviation. In stage one, IGES formatted daa of 2D engineering drawings are transformed into three independent graphs through upperhalf profile. In stage two, recursive evaluations are made to recognize features and relevant information is acquired. Finally,an example is evaluated to demonstrate the recognition power of the developed algorithm for rotational features.

  • PDF