• Title/Summary/Keyword: 흙막이 벽체 보강

Search Result 19, Processing Time 0.024 seconds

A Study on the Characteristics of Member Force, Horizontal Displacement and Concrete Strength by Design Elements of SPW Retaining Walls (SPW 흙막이 벽체의 설계요소별 부재력과 수평변위 및 콘크리트강도 특성 연구)

  • Wan-Ho Kim;Yu-Seok Shin;Yeong-Jin Lee;Yong-Chai Chang;Kang-Il Lee
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.1
    • /
    • pp.75-85
    • /
    • 2023
  • In areas where excavation works are carried out, it is very important to select a retaining wall method to minimize ground water level and ground subsidence changes. In this regard, the use of Secant Pile Wall(SPW) method, which can complement the disadvantages of the CIP method, is gradually domestic increasing for the construction of retaining wall method. This study investigated the design elements of the SPW method and the interrelationship between the structural stability factors of the wall. The design elements for the retaining method are the overlap length between piles, pile diameter, and the specifications of the H-Beam specifications, while the structural stability factors of the wall are the bending stress, shear stress, horizontal displacement, and concrete strength. The study results showed that the pile diameter and H-Beam specifications have a significant impact on the capacity of the H-Beam, the overlap length and pile diameter have a significant impact on the horizontal displacement, and the pile diameter and H-Beam specifications have a significant impact on the required strength of the concrete.

A Study on the Ground Improvement Effect with Grouting in Backside of Retaining Wall (흙막이 벽체 배면 그라우팅 시 지반보강 효과에 관한 연구)

  • Chu, Ickchan;Byun, Yoseph;Baek, Seungin;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.10
    • /
    • pp.77-83
    • /
    • 2012
  • Recently, excavations using propped walls were popularized in downtown due to reduced settlement of nearby structures. These excavations is induced strain to propped walls or settlement in near ground. In this study, the ground reinforcing effect was proven using NDS, which is an inorganic injection material. Injection tests were performed to compute optimum injection pressure and volume. Next, calibration chamber tests were performed by using computed injection pressure and volume, and wall behaviour was examined for overburden pressures of 50kPa and 150kPa. Ground reinforcing effect was shown when the material behind the propped wall was grouted. From test results, optimum injection pressure was 350kPa and the optimum volume was 10L considering economics. Calibration chamber test results show that after the material was grouted, the maximum settlement was reduced to 19% of the non-grouted condition. For overburden pressures of 50kPa and 150kPa behind the wall, the settlement of the wall increased by 58% and 57% when compared to the case of no overburden pressure.

A Study on the Reinforcement of the Soil Blocking Facilities Due to Water Pipe Rupture Accident (상수관 파열 사고로 인한 흙막이 가시설 보강사례 연구)

  • Woo, Jong-Tae
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.241-243
    • /
    • 2023
  • 아파트 신축공사 흙막이 가시설 현장에 근접 매설된 상수관의 누수 및 파열 사고로 터파기 공사 현장에 토사 유실 및 지반 함몰이 발생되었으며, 흙막이 가시설의 토류판이 파손되었다. 흙막이 가시설의 안정성 확보를 위해 벽체구간은 레이커로 보강하고 사보강재는 1단과 2단을 묶어 힘을 분산시키고 종방향으로 보강 및 토류판 보강을 시행하였다.

  • PDF

A Case Study on Solpe and Earth Retaining Wall Reinforced by Pressure-Grouted Soil Nailing (압력식 쏘일네일링을 적용한 사면 및 흙막이 벽체 설계/시공 사례)

  • Jung, Kyung-Han;Kim, Jun-Youp;Lee, Seung-Jai
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.97-108
    • /
    • 2010
  • 발포우레탄 패커를 이용한 압력식 쏘일네일링 공법은 기존 쏘일네일링 공법의 단점을 보완하기 위하여 개발되었으며, 그라우팅 두부에 패커를 설치하여 네일 정착부를 완전히 밀폐하고 압력 그라우팅을 실시하여 정착부의 유효직경 및 인발저항력을 증가시켜 안전율을 향상시키는 공법이다. 압력식 쏘일네일링 공법에 대한 효용성을 검증하기 위하여 발포우레탄 패커 특성시험 및 현장조건을 묘사한 실내 그라우팅 주입실험, 현장시험 및 FEM해석을 수행하였다. 본 공법의 필수요소인 발포우레탄 패커의 정착력 확인을 위한 패커 특성시험 결과, 공내에 작용하는 압력에 대하여 패커가 충분히 저항함을 알 수 있었으며, 인발저항력 증가 원인 분석을 위한 실내 및 현장 시험결과, 압력 그라우트에 의하여 그라우트의 품질확보, 보강력증가 및 주변지반의 압밀효과를 확인 하였다. 끝으로 압력식 쏘일네일링 공법을 적용한 사면 및 흙막이 벽체 설계/시공 사례를 분석하여 현장 적용시 본 공법의 효용성 및 대처능력의 우수함을 입증하였다.

  • PDF

Analysis on the Influence and Reinforcement Effect of Adjacent Pier Structures according to the Underpass Construction (지하차도 시공에 따른 인접 교각구조물 영향 및 보강효과 분석)

  • Lee, Donghyuk
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.4
    • /
    • pp.29-39
    • /
    • 2022
  • In order to solve the serious traffic congestion in seoul metropolitan city, large-scale underground space development such as underpasses, deep underground roads, and GTX (Great Train eXpress) is being carried out. In order to minimize the impact of the adjacent seoul metro line A pier foundation and stability due to the construction of the underground road in Seoul, earth retaining structures were reinforced and the foundation was reinforced as well. In this study, three-dimensional finite element mehtod analysis was performed to evaluate the effect on adjacent construction and to review the stability of the underpass excavation work. The reinforcement effect was quantitatively analyzed through numerical analysis. As a result of the analysis, compared to the result of performing the existing reinforcement when overlapping CIP and ground reinforcement grouting were performed, the displacement of the earth retaining structures was reduced by more than 50%, and stress of the foundation piles were also reduced by more than 45%. Based on the analysis of the numerical analysis results, it was confirmed that the displacement of the walls of earth retaining structures during adjacent construction should be strictly controlled.

Case Studies on Ground Improvement by High Pressure Jet Grouting(II) Effect on the Ground Reinforcement and Cut off of Ground Water Behind Temporary Retaining Walls (고압분사주입공법에 의한 지반개량사례연구(II) -흙막이벽 배면지반보강 및 차수효과)

  • Yun, Jung-Man;Hong, Won-Pyo;Jeong, Hyeong-Yong
    • Geotechnical Engineering
    • /
    • v.12 no.5
    • /
    • pp.5-16
    • /
    • 1996
  • When braced excavation with temporary retaining wall installation, is performed in loose sand with high ground water level boiling may be induced and considerable damage on the excavation works and structures in the vicinity can take place. Recently, for the purpose of reinforcement of ground and cut-off of ground water behind the temporary retaining wall, high pressure jet grouting is widely used. The purpose of this paper is to investigate the effects of jet grouting on ground reinforcement and cut -off of the ground water behind temporary retaining walls for braced excavation. A series of both laboratory and field tests has been performed. The test results show that high pressure jet grouting has sufficient effects on reinforcement of stiffness of ground and retaining wall. The permeability of the improved ground was 10-f_ 10-3cm l s smaller than those of the original ground. Therefore, the effect on cut off of ground water behind temporary retaining walls could be improved by high pressure jet grouting method.

  • PDF

Behaviour of geogrid reinforced model retaining wall in active failure state by execution of parallel movement (병진이동으로 인한 주동파괴 시 지오그리드 보강토 모델벽체의 거동)

  • Lee, Kang-Man;Kong, Suk-Min;Lee, Dae-Young;Lee, Yong-Joo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.14 no.4
    • /
    • pp.117-127
    • /
    • 2015
  • Recently, there has been a string of negligent accidents for the retaining wall and slope. In order to measure the ground deformation for the MSE wall, the authors carried out the model test to assess behavioral characteristics of geogrid MSE walls in active failure state with different conditions of geogrid reinforcement. The models are built in the soil container box having dimension, 100 cm long, 90 cm height, and 10 cm wide. The reinforcement used in the model test is geogrid (polyvinyl chloride, PVC). Three geogrids are sized by $30cm{\times}60cm$, $30cm{\times}70cm$, $30cm{\times}80cm$ (width ${\times}$ length) respectively. In this study, the laboratory model tests represented for several conditions of the MSE wall, and then its results were compared to 2D FE analysis.

A Study on Flexural Rigidity of Two-row Overlap Pile Wall for Deep Excavation Support (대심도 굴착면 지지를 위한 2열 겹침말뚝의 휨 강성에 관한 연구)

  • Choi, Won-Hyuk;La, You-Sung;Kim, Bum-Joo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.17 no.1
    • /
    • pp.33-43
    • /
    • 2018
  • Two-row Overlap Pile wall is a novel retaining wall system with high flexural rigidity and waterproofing for deep excavation support currently being developed in Korea. The Two-row Overlap Pile wall is constructed by making an overlap between consecutive four-axis (or two-axis) auger piles which themselves are overlapped and arranged in zigzag manner. In this study, the flexural rigidity of the Two-row Overlap Pile wall, including the effect of cross-sectional shape, was examined using both theoretical and numerical approaches. The results of investigation suggested that the Two-row Overlap Pile wall formed with two-row piles exhibit greatly higher flexural rigidity than conventional one-row pile walls such as Cast in place pile (CIP) and Secant pile wall (SPW), whereas the effect of overlap length between piles on the flexural rigidity is relatively minimal.

Numerical Study for Application of Sheet Pile Retaining Wall Reinforced with H-pile (H-pile로 보강된 Sheet pile 흙막이 벽체의 적용을 위한 수치해석)

  • Cho, Kwangjun;Jun, Sanghyun;Suh, Jeeweon;Yoo, Namjae;Park, Byungsoo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.7
    • /
    • pp.23-33
    • /
    • 2015
  • This paper is results of numerical study for application of sheet pile retaining wall reinforced with H-pile as sheet piles are needed in field for a cutoff wall and are limited to use because of driveability in the ground condition of having a larger strength than a weathered rock. Extensive 101 cases of numerical approach were conducted to investigate the behavior of sheet pile retaining wall reinforced with H-pile, changing installing members of two types of sheet pile and three types of H-pile, the embedded depth of sheet pile and H-pile, the horizontal space between H-piles and excavation conditions. As the results of numerical analysis, combined use of the sheet pile SP-IIIA with H-Pile H250 and the sheet pile SP-IV with H-Pile H350 among precast products was found to be efficient since two members tended to reach allowable stresses simultaneously or have similar stress concentration ratios. Increased stiffness in reinforced sheet pile showed reduction of lateral displacement of wall. Embedded depth of sheet pile did not affect stability of wall significantly so that driving the penetrable depth of sheet pile should be enough to maintain stability of wall and satisfy purposes of cutoff and stiffness increase of wall.

Model Test of Stabilizing Measures for Ground Failure Due to Soft Ground Excavation (연약지반 굴착에 따른 지반파괴 억지대책 실내모형 실험)

  • Kim, Jae-Hong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.907-917
    • /
    • 2014
  • When conducting excavations after burying the soft ground, even if the retaining walls are installed, failure often occurs within backfill. In order to minimize the occurrences of failures, model test was performed after the installation of stabilizing piles to investigate the stabilizing effects. The model chamber is set up with clay foundation reinforced with and without stabilizing piles. During the excavation of clay foundation, the subsidence, pore water pressure, and soil pressure along the excavation were measured. As a result of the model test, the increase of excavation levels and the reduction of subsidence of back ground were observed with the stabilizing piles, compared to those without the stabilizing piles. The installation of stabilizing piles does not influence the pore water pressure change, but induces less subsidence rate. In addition, the depth of excavation has a significant effect on the back ground and it was evaluated that the maximum subsidence occurs as it is closer to the excavation point.