• Title/Summary/Keyword: 화성성역

Search Result 11, Processing Time 0.017 seconds

A Study on Procurement of Construction Materials in the HwaSeong Construction Project (화성건설공사에서 자재의 조달방법 연구)

  • Kim, Kyoon-Tai
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.183-188
    • /
    • 2009
  • HwaSeong (Suwon Fortress) was built during the reign of King Jeong-jo in the Choseon Dynasty. Detailed information on the construction of HwaSeong can be found in Hwaseong Seongyeok Euigui. In this sense, it is necessary to perform a comparative analysis on the Hwaseong Seongyeok Euigui based on construction management factors. This paper aims to analyze the HwaSeong construction project from a modern construction perspective by comparing and reviewing information related to the procurement of construction materials of the time. For this, wooden and steel materials and tiles were analyzed by supply area, supply channel, type and price. From the results of the analysis, it is found that the government used both private and official channels to supply materials. In particular, except for wooden materials that could be supplied from Bongsan, the supply of materials showed a high dependency on private channels. In terms of steel, it was almost 30 percent cheaper through private channels than when purchased through the official channel. Finally, materials vulnerable to damage like tiles were manufactured from the areas near the construction site. From this fact it can be interpreted that the government had a flexible procurement system, including manufacturing on the spot and external suppliers,depending on the property of the material. It is expected these analytical results will serve as key data to understand the management factors in constructing HwaSeong.

A Study on the Application of the Construction Management showing up the HuaSungSungYouk-EuGye during the Chosen Dynasty (조선시대 화성성역의궤에 나타난 건설관리 적용에 관한 연구)

  • Yi Tae-Yeual;Lee Sang-Hae;Kim Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.341-346
    • /
    • 2001
  • The purpose of this study is not only to show up the fact which a kind of construction management was applied during the ancient Korea, especially, Chosun Dynasty but also to understand its construction capacity by analysing various information. mainly collected from the book, HwaSungSungYouk-EuGye. The book was made by ChungCho who was one of the great kings Choson Dynasty, which has lots of information about how to build HwaSung during the last of the eighteen century. This study starts from the definition that the HwaSungSungYouk was one of the construction projects which is the concept for construction management today. The construction project can be defined in terms of its distinctive characteristics: a project is a temporary endeavor undertaken to create a unique product. Temporary means that every project has a definite beginning and a definite end. Unique means the product is different in some distinguishing way from all similar products. A project is also undertaken several kinds of organizations. They may involve a single person or many thousands. 1'his study is to show some of the effective methods. Firstly, the concept of the database system today can be applied to effectively control and classify the complicated data in the HwaSungSungYouk-EuGye. Secondly, on the basis of the database system, the concept of modem construction management will be also use to figure out the construction data of the HwaSungSungYouk-EuGye.

  • PDF

A Modern Interpretation of the Resources Required for the Construction of Paldal-mun in the Joseon Dynasty through the Analysis of HwaSungSungYouk-EuGye (화성성역의궤 분석을 통한 조선시대 팔달문 건설 소요자원의 현대적 해석)

  • Kim, Kyoon-Tai
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.6
    • /
    • pp.641-652
    • /
    • 2021
  • Although detailed information on the construction of Hwasung was recorded in the Hwasungsungyouk-eugye, analysis and evaluation from the perspective of modern construction management were limited. Therefore, in this study, construction management related information such as time, cost, and manpower was analyzed for Paldal-mun. The main work involved in the construction of Paldal-mun was foundation work and masonry work, and the total construction period was 6 months, with the overall construction progressing very quickly. The total cost of the construction of Paldal-mun was about 52,423 Nyong, which can be divided into about 15,9332 Nyang for materials and 36,4901 Nyang for labor cost. Converting these to present value, the material cost is about 1.1 billion won and the labor cost is about 2.5 billion won, and the sum of these is about 3.6 billion won. In the future, we plan to conduct additional research in this area such as deriving detailed input manpower related to the work period for each type of work.

Analysis of the HwaSungSungYoukEuGye for Estimating the Resources of PalDal-Mun Construction (팔달문 건설의 소요자원 산정을 위한 화성성열의궤 분석)

  • Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05c
    • /
    • pp.1-6
    • /
    • 2009
  • The HwaSungSungYouk is one of the construction project in viewpoint of today's construction management and various information how to build the HwaSung at the last of the eighteen century had been recorded in HwaSungSungYoukEuGye. The purpose of this study is to analyse the data in HwaSungSungYoukEuGye in viewpoint of today's construction management for estimating the resources of PalDal-mun construction. In the record, there are a 10t of information relate to time management, cost management and human resource management, and the concept of modern construction management will be also use to figure out the construction data of the HwaSungSungYoukEuGye.

  • PDF

A Case Analysis on the Time Management of the HwaSung Construction Project in Choseon Dynasty (조선시대 화성성역의 공정관리 사례분석)

  • Kim, Kyoon-Tai
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.6
    • /
    • pp.139-145
    • /
    • 2008
  • The objective of this paper is to analyze the construction management capacity of Choseon Dynasty and suggest a new interpretation on the construction capacity of the time management by reviewing the time management case during a representative construction project, HwaSungk construction project implemented in the latter period of Choseon Dynasty around 200 years ago. which was described in HwaSungSungYoukEuGye. The analysis results of the time management capacity during the latter period of Choseon Dynasty depicted in the HwaSungSungYoukEuGye is summarized as follows: (1) It took 2 years and 6 months to complete the Hwasung construction project. However, all of the single buildings were constructed within 6 months, a relatively short period of time. Judging from the fact, it can be assumed that the construction techniques using wood of the time were very sophisticated. (2) When the HwaSung was constructed, it took a relatively short period of time to complete works from placing the foundation to erecting columns and to placing a crossbeam on the columns. Based on the fact, it can be also inferred that assembly processing techniques of the time were also sophisticated and the level of member processing and assembling techniques of the time was considerably good as well. (3) The HwaSung construction was continued throughout the year without any influence by weather conditions, which tells us that division of labor by work was performed, and it was possible to mobilize labor force for the construction project even during the busy farming seasons.

A Study on Traditional Landscaping Method in the Water Space of Unrestored in Suwon Hwaseong (수원 화성 미복원 수(水) 공간의 전통조경 조성방법 연구)

  • Paek, Chong-Chul
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.38 no.1
    • /
    • pp.21-27
    • /
    • 2020
  • Completed in September 1796, Suwon Hwaseong Fortress is a defense facility with 49 facilities spanning 5,744m. During the Japanese occupation and the Korean War, many buildings and walls were damaged, and in 1975, it was restored to its current state through the restoration and restoration project in Suwon. Six of the entire facilities have not been restored by urbanization, of which the restoration of water spaces, including ditches buried in the ground, could be used as a place of rest and viewing for visitors. Tourists visiting Suwon Hwaseong, are satisfied with exploring the historic sites, but feel insufficient for enjoying the natural scenery around the castle. The best way to create a natural landscape in Suwon Hwaseong, where urbanization has been developed, is to create a water space to make you feel the traditional garden. Therefore, the location, shape, and functions of the unrestored water space of Hwaseong Fortress were analyzed through the analysis of 『Hwaseong Seongyeog Uigwe』 and 『Hwaseong Full Map』. The purpose of this study is to derive the traditional landscaping method by analyzing the characteristics of water space.

A Study on the Characteristics of Planning of Hwa-sung from the Point of Water System (수체계로 본 수원화성 건설의 계획적 특성에 관한 연구)

  • Kang, In-Ae
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.29 no.4
    • /
    • pp.137-147
    • /
    • 2011
  • This study aims to find out the construction process and planning characteristics of Suwon and Hwa-sung in 18th century from the point of water system. This study has an explanatory approach. The planning intents in the water system was driven out by analyzing various planning elements in relation to water system in the process of constructing Hwa-sung in 18th century. Using Entire Map of Hwa-sung, land registration map made in 1911 and topographic map of 1/10,000 scale made in 1917, water system and interpretation of spatial structure in Hwa-sung were analyzed. The results are as follows(Planning characteristics of the water system in Haw-sung in 18th century are as follows). Firstly, in determining the spatial structure and location of Hwa-sung, water system had an important role. Secondly, integrated drainage system was planned by the organization of natural and artificial water stream. Thirdly, the main street system and land use structure were planned in relation with water system. Fourthly, territoriality of main area was planned with water stream. Fifthly, ponds were constructed for flood control and they had important role as landscape elements. Sixthly, water stream was used as intentional BiBo element. As a result of the study, the weater system of Hwa-sung in 18th century was planned by the organization of natural and artificial water stream in relation with the location of new town and wide area's spatial structure, street system, land use structure, territoriality of main area, terriflood control, water quality protection, landscape, 비보 and urban daily life.

The Concept of Construction Management Showing up the HwaSungSungYoukEuGye in Choson Dynasty (조선시대 화성성역의궤의 건설관리적 의미)

  • Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.167-171
    • /
    • 2008
  • HwaSungSungYouk was one of the construction project in viewpoint of today's construction management and various information how to build the HwaSung at the last of the eighteen century had been recored in HwaSungSungYoukEuGye. The purpose of this study is to analyse the HwaSungSungYoukEuGye' management technic in viewpoint of today's construction management. In the record, there are a lot of informtion relate to record management, time management, cost management, etc. and the concept of the managements can be applied to today's construction project effectively. The concept and detail of the HwaSungSungYouk's project management should be analysed more.

  • PDF

A Study on the Characteristics of Chwibyeong in 『Jungli-Euiguae』 written Hangeul (『뎡니의궤(整理儀軌)』에 나타난 취병의 특성 연구)

  • Paek, Chong-Chul;Oh, Seon-Hwa
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.41 no.4
    • /
    • pp.1-7
    • /
    • 2023
  • Chwibyeong is a hedge made into a folding screen shape by setting up supports and placing plants on it. Traces of chwibyeong can be found in various paintings, such as the 『Donggwoldo painting of Changdeokgung Palace』, 『Gyujanggak painting』, 『Munhuimyo painting』, and 『Hwaseong Temporary Palace painting depicting Suwon Hwaseong Temporary Palace』. However, since the Chwibyeong has not survived to this day, the whereabouts of the Chwibyeong were estimated through ancient documents, old paintings, and photographs. In the case of a manned Chwibyeong using a support, a picture related to the composition of the Chwibyeong using a base can be Winnow willow. Methods for creating intoxicants using coniferous trees such as Chinese juniper and Rigid-branch yew have been studied. In existing old paintings, only the supports, parts of leaves, and branches were depicted, so the location of the Chwibyeong could not be confirmed through the drawings. However, in the 『Jungli-Euiguae』, written around 1797, a manned type of Chwibyeong using a support was depicted as the material of the Chwibyeong. By being able to confirm the type of tree used, it was possible to confirm the method of creating a Chwibyeong using Winnow willow introduced in the 『LimwonGyeongjeji』. However, in the 『Jungli-Euiguae』, written around 1797, a manned type of Chwibyeong using a support was depicted as the material of the Chwibyeong. By being able to confirm the type of tree used, it was possible to confirm the method of creating a Chwibyeong using Winnow willow introduced in the 『LimwonGyeongjeji』. Therefore, the purpose of this study is to suggest a method of using Chwibyeong to restore by analyzing old literature. For this purpose, first, the process of change in the material of the Chwibyeong was analyzed through the analysis of old documents showing the method of forming the Chwibyeong. Second, the material and composition method of the Chwibyeong were analyzed through the analysis of the picture of "Seongyeok-do" in 『Jungli-Euiguae』, which allows us to understand the form of the Chwibyeong

A Study on the Analysis of the HwaSungSungYouk-EuGye in the Aspect of the Modern Construction Management -Focus on ChangAhn-Mun's Construction Work- (현대(現代) 건설관리개념(建設管理槪念)을 통한 "화성성역의궤(華城城役儀軌)"의 분석(分析)에 관한 연구(硏究))

  • Yi, Tae-Yeual;Lee, Sang-Hae
    • Journal of architectural history
    • /
    • v.10 no.3 s.27
    • /
    • pp.61-76
    • /
    • 2001
  • The purpose of this study is not only to evaluate the capacity of construction management but also to understand the capacity of construction productivity by analysing various information, mainly collected from the book, HwaSungSungYouk-EuGye. The book was made by ChungCho who was one of the great kings Choson Dynasty, which has lots of information about how to build HwaSung during the last of the eighteen century. It is true that previous researches have showed lots of limitation to study the HwaSungSungYouk-EuGye though it contained a plenty of construction data. The main reason would be the absence of study methods to analyze HwaSungSungYouk-EuGye systematically. That's why there have not been overall studies about the HwaSungSungYouk-EuGye. This study starts from the definition that the HwaSungSungYouk was one of the construction projects which is the concept for construction management today. The construction project can be defined in terms of its distinctive characteristics: a project is a temporary endeavor undertaken to create a unique product. Temporary means that every project has a definite beginning and a definite end. Unique means the product is different in some distinguishing way from all similar products. A project is also undertaken several kinds of organizations. They may Involve a single person or many thousands. This study is to show some of the effective methods. Firstly, the concept of the database system today can be applied to effectively control and classify the complicated data in the HwaSungSungYouk-EuGye. Secondly, on the basis of the database system, the concept of modern construction management will be also use to figure out the construction data of the HwaSungSungYouk-EuGye.

  • PDF