• 제목/요약/키워드: 현장품질관리

Search Result 678, Processing Time 0.03 seconds

240 channel Marine Seismic Data Acquisition by Tamhae II (탐해2호의 240채널 해양탄성파 탐사자료취득)

  • Park Keun-Pil;Lee Ho-Young;Koo Nam-Hyung;Kim Kyeong-O;Kang Moo-Hee;Jang Seong-Hyung;Kim Young-Gun
    • Geophysics and Geophysical Exploration
    • /
    • v.2 no.2
    • /
    • pp.77-85
    • /
    • 1999
  • The 3-D seismic research vessel, Tamhae II, was built to raise up the probability of the hydrocarbon discovery in the Korean continental shelf and the first test survey was completed in the East Sea. During the survey, the 240 channel 2-D marine seismic data were acquired by the Korean flag vessel for the first time. Tamhae II has been equipped with source, receiver, recording equipment, and navigation equipment as well as an onboard processing system. The source is composed of four subarrays and each subarray has six airguns. Total airgun volume is 4578 $in^3$. The receiver consists of two sets of 3 km long 240 channel streamer. In the first survey, the successful acquisition of 2-D seismic data was accomplished. From the result of the data processing, we confirmed that the high quality seismic data were acquired. For the high quality data acquisition, technology of survey design and planning, operation of vessel and equipments and systematic quality control should be developed.

  • PDF

Study on the Application of Semi-open cut Top-Down Construction for Framework (세미 오픈컷 역타공법의 현장적용에 관한 연구)

  • Sho, Kwang-Ho
    • Journal of Korean Association for Spatial Structures
    • /
    • v.11 no.2
    • /
    • pp.129-138
    • /
    • 2011
  • Construction methods for underground structure are classified as bottom-up, up-up, and top-down methods depending on the procedure of construction related to a superstructure. In top-down construction methods, building's main structure is built from the ground level downwards by sequentially alternating ground excavation and structure construction. In the mean time, the main structure is also used as supporting structure for earth-retaining wall, which results in the increased stability of the earth-retaining wall due to the minimized deformation in adjacent structures and surrounding grounds. In addition, the method makes it easy to secure a field for construction work in the downtown area by using each floor slabs as working spaces. However top-down construction method is often avoided since an excavation under the slab has low efficiency and difficult environment for work, and high cost compared with earth anchor method. This paper proposes a combined construction method where semi-open cut is selected as excavation work, slurry as earth -retaining wall and CWS as top-down construction method. In the case study targeted for an actual construction project, the proposed method is compared with existing top-down construction method in terms of economic feasibility, construction period and work efficiency. The proposed construction method results in increased work efficiency in the transportation of earth and sand, and steel frame erection, better quality management in PHD construction, and reduced construction period.

A study of mixing ratio of seal material for umbrella arch reinforcement for tunnelling (터널 강관 보강형 다단 그라우팅의 Seal재 배합비에 대한 연구)

  • Hwang, Beoung-Hyeon;Kim, Yeon-Deok;Sim, Jae-Hoon;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.367-381
    • /
    • 2020
  • This paper presents the seal material mixing ratio of tunnel umbrella arch reinforcement method. Currently, there is no clear standard for the proper gelation time and curing time of the Seal material in Korea, and the quality control is also difficult because it cannot be verified. In response, the ratio of the mixture of the seal material was composed of four types of indoor experiments, and the amount of gelation time and bleed was checked. In addition, a non-cart penetration test confirmed the curing time and compared the ratio of each combination. Further experiments on W/C 120% identified the effect of mixing speed and time on the seal material. A total of three field experiments were conducted based on indoor experiments, and the size and strength of bulb formation were compared by checking the curing time of the specimen and main injection. Comparisons show that the lower W/C, the stronger the strength, the larger the size of the bulb, and the faster the hardening time appears. Based on the results of the gelation time and curing time, it was deemed that the mixing ratio of W/C 120% is most appropriate when applied to the actual site.

Evaluation of Point Bearing Capacity using Field Model Pile Test (현장 축소모형 말뚝 시험을 이용한 선단지지력 예측)

  • Lee, Chang-Ho;Lee, Woo-Jin;Jeong, Hun-Jun;Han, Shin-In
    • Journal of the Korean GEO-environmental Society
    • /
    • v.6 no.3
    • /
    • pp.47-54
    • /
    • 2005
  • In many practical cases, design methods of pile have been used mainly semi empirical bearing capacity equations. It can be done that confirmation of pile bearing capacities through using of dynamic and static tests during constructing or after constructions. If a prediction of layered point pile bearing capacity could be done through simple tests during field investigation, it could be done that more reliable design of pile than a prediction of using semi empirical equations or static formulations. This paper suggests a method to estimated point bearing capacity during in-situ investigation by using the dynamic rod model pile and verifies the point bearing capacity compare with results of static pile load tests. From test results, the unit ultimate point bearing capacities are relatively similar through a dynamic rod model pile tests and static pile load tests. The unit ultimate point bearing capacity by using N value is shown about 50 % value of measured unit ultimate point bearing capacity from field test result and the prediction of the unit ultimate point bearing capacity by using N value is shown very conservative, illogical and uneconomical pile designs.

  • PDF

Development of Satisfaction Evaluation Items for Degree-linked High Skills Meister Courses using the Delphi Method (Delphi 기법을 활용한 학위연계형 고숙련마이스터 과정의 만족도 평가 문항 개발)

  • Kim, Seung-Hee
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.20 no.5
    • /
    • pp.163-173
    • /
    • 2020
  • In this study, on-site corporate instructors participated as student-cum-workers in a degree-linked high skills Meister course to improve job competency and practical ability as proposed in the Work-Study Career Vision. Evaluation questions were then developed and their validity was verified by assessing satisfaction related to expected goals in enhancing advanced training guidance and competency as an evaluator. Satisfaction assessment was conducted based on training preparation, training implementation, training effectiveness and training administration. The Delphi Method was adopted and a total of 48 items were developed in 6 categories under 4 main areas. There were 7 evaluation items on the satisfaction of training course development under training preparation, 21 evaluation items related to the satisfaction of Off-JT and OJT courses under training implementation, 16 evaluation items related to the satisfaction of increased competency as an on-site corporate instructor and the satisfaction of enhanced practical skills and skills application at work under training effectiveness, as well as 6 evaluation items to assess satisfaction with administrative support under training administration. The final conformity assessment was conducted based on the stability, content validity ratio, consensus and convergence indicators of the developed items. Results of this study do not only apply to quality management of the high skills Meister course which is being promoted as a pilot project for work-study programs, but also serves as a rationale that may be considered as a basic research tool in the collection of various opinions to derive overall system improvement factors for the work-study high skills Meister course.

Optimum Mix Proportion of the High Strength and Self Compacting Concrete Used Above-Ground LNG Storage Tank (지상식 LNG 저장탱크용 고강도 자기충전 콘크리트의 최적배합에 관한 연구)

  • Kwon, Yeong-Ho
    • Journal of the Korea Concrete Institute
    • /
    • v.23 no.1
    • /
    • pp.99-107
    • /
    • 2011
  • This study is to performed to find the optimum mix proportion of the high strength and self compacting concrete for the above-ground LNG storage tank construction and field application. If LNG storage tank wall thicknesscan be reduced, the construction cost and quality can be improved by using self-compacting high strength concrete with compressive strength 60~80 MPa. For this purpose, low heat cement (Type IV) and class F fly ash are used in concrete mix to control hydration heat, flowability, and viscosity. Mix design variables of unit water, fly ash replacement ratio, water-binder ratio, and fine aggregate ratio are selected and tested for material properties and manufacturing cost of the concrete. Also, fly ash replacement ratio is considered using confined water ratio test. The test results showed that the optimum mix proportion of the self-compacting high strength concrete characteristics are as follows. 1) In case of the concrete with specified compressive strength of 60 MPa, the optimum mix proportion is fly ash replacement ratio of 20% and water- binder ratio of 27~30%. 2) In case of the concrete with the strength of 80 MPa, the optimum mix proportion is fly ash replacement ratio of 10% and water-binder ratio 25%. But unit water and fine aggregate ratio are 165 $kg/m^3$ and $51{\pm}2%$, respectively, regardless of the traget concrete compressive strength range. Also, test results showed that concrete manufacturing cost of 60 MPa and 80 MPa concrete require additional costs of 14~22% and 33%, respectively, compared to the manufacturing cost of 40 MPa concrete. Therefore, application of the self-compacting high strength concrete has proven to be economical in the perspective of the material cost, quality control, and site management.

A Study on the Filed application of Environmental Friendly Porous Concrete For Retaining Wall (환경친화 옹벽용 포러스콘크리트의 현장적용성에 관한 연구Ⅱ)

  • Kim, Jeong-Hwan;Lee, Nam-Ik;Lee, Jun;Park, Seung-Bum;Jang, Young-Il;Seo, Dae-Suck
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.817-820
    • /
    • 2008
  • The river environments of many streams in korea have been deteriorate through the rapid industrialization and urbanization since the 1960s. In korea, on the other hand, much efforts on the research and project have been made for the restoration of the deteriorated streams to close-to-nature. in order to restore the deteriorated streams, therefore, it is necessary to investigate such advanced technologies and materials. In view of this requirement, various research paths are being taken focusing on coarse aggregates to make multi-functional porous concrete having continuous voids so as to improve water and air permeability, acoustic absorption, water purification and applicability to vegetation. The Purpose of this study is to investigate the method for recovery of the environment in the streams area using porous concrete retaining wall block. the multi-P.O.C block applies for test in the Jangduri-cheon have been monitored planting, stability etc. after 6 months, plant grows flourishing and reconstructed in state such as nature rivers.

  • PDF

Closed Static Chamber Methods for Measurement of Methane Fluxes from a Rice Paddy: A Review (벼논 메탄 플럭스 측정용 폐쇄형 정적 챔버법: 고찰)

  • Ju, Okjung;Kang, Namgoo;Lim, Gapjune
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.22 no.2
    • /
    • pp.79-91
    • /
    • 2020
  • Accurate assessment of greenhouse gas emissions is a cornerstone of every climate change response study, and reliable assessment of greenhouse gas emission data is being used as a practical basis for the entire climate change prediction and modeling studies. Essential, fundamental technologies for estimating greenhouse gas emissions include an on-site monitoring technology, an evaluation methodology of uncertainty in emission factors, and a verification technology for reductions. The closed chamber method is being commonly used to measure gas fluxes between soil-vegetation and atmosphere. This method has the advantages of being simple, easily available and economical. This study presented the technical bases of the closed chamber method for measuring methane fluxes from a rice paddy. The methane fluxes from rice paddies occupy the largest portion of a single source of greenhouse gas in the agricultural field. We reviewed the international and the domestic studies on automated chamber monitoring systems that have been developed from manually operated chambers. Based on this review, we discussed scientific concerns on chamber methods with a particular focus on quality control for improving measurement reliability of field data.

A Case Study on the Establishment of a Strategy System through the BSC of SMEs (중소기업의 BSC를 통한 전략체계 구축 사례연구)

  • Lim HeonWook;Kim WooSu
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.4
    • /
    • pp.303-308
    • /
    • 2023
  • The purpose of this study is to provide a practical guide for establishing BSC that can be practically applied by SMEs. To this end, a case study was conducted to establish a performance evaluation system through a field-required Balanced Scorecard (BSC) for company J, a tent pole manufacturer, and to provide a management strategy system map. As a survey method, the requirements of the ordering organization were organized through a comparison of the BSC-related proposal requests in the first stage. The BSC establishment method was organized through the arrangement of the second stage result report. The 3rd stage BSC derived KPI indicators for SMEs for each of the 4 perspectives. A corporate vision was derived through a 4-step SWOT analysis. A strategy map was developed through 5-step field-required KPI, weight setting, and BSC. The 6-step final strategy system was also drawn up. As a result of the study, the four perspectives of the BSC were reconstructed by department. That is, the financial (financial) perspective is from the executives' perspective, the customer's perspective is from the sales department's perspective, the internal process perspective is from the design department/production quality department's perspective, and the learning/innovation perspective is from the management department's perspective. In addition, a total of 11 CSFs and a total of 49 KPIs of J company were derived. The limitation of the study is that the final strategy system through the company's BSC has only been carried out, and it needs to be linked with the company's compensation system in the future.

Study on the Optimal Construction Method for the Compaction Method of Hydraulic Filling in Metropolitan Areas (도심지 물다짐 공법의 적정 시공방법에 관한 연구)

  • Jeong, Dal-Yeong;Jang, Jong-Hwan;Chung, Jin-Hyuck
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.2
    • /
    • pp.175-181
    • /
    • 2020
  • This paper suggests a proper hydraulic filling method in downtown areas. Road subsidence on roadways and sidewalks in downtown areas can result in vehicle damage and casualties. The representative cause of road subsidence is the fraudulent construction in nearby construction sites. A deficiency of excavation restoration causes approximately 25~49% of subsidence. This is performed by equipment or manpower. Hydraulic filling is used in backfilling narrow pipe conduits and spaces between structures. On the other hand, standard specifications and quality assurance standards regarding hydraulic filling principles and construction conditions are insufficient. Therefore, in-door model experiments on hydraulic filling principles, backfilling material, and compaction efficiency were performed. This paper suggests guidelines by investigating and analyzing construction status. In conclusion, thrown backfilling material has a particle size distribution and permeability coefficient as major factors, and detailed standards of the factors are suggested. To improve the compaction efficiency, 90% or more, compaction by the floor should be in units of 0.3m while ensuring a lower drainage layer. When an H-shape stabilizing pile is pulled out after filling, additional hydraulic filling should be in the disturbance range.