1 |
Cho, I.S., Park, J.J., Kim, J.S., Lee, I.M. (2010), "New tunnel reinforcement method using pressurized cavity expansion concept", Journal of Korean Tunnelling and Underground Space Association, Vol. 12, No. 6, pp. 407-416.
|
2 |
Hong, Y.H., Yu, J.D., Byun, Y.H., Jang, H.I., You, B.C., Lee, J.S. (2013), "Integrity evaluation of grouting in umbrella arch methods by using guided ultrasonic waves", Journal of Korean Tunnelling and Underground Space Association, Vol. 15, No. 3, pp. 187-199.
DOI
|
3 |
Kim, G.H., Choi, C.R., No, J.G., Choi, J.Y. (2018), "A case study on the steel pipe multistage grouting", Magazine of Korean Tunnelling and Underground Space Association, Vol. 20, No. 3, pp. 67-76.
|
4 |
Korea Rail Network Authority (2018), Small diameter steel pipe multi-stage grouting construction specification (plan), pp. 2-14.
|
5 |
KS L 5102 (2016), Testing method for normal consistency of hydraulic cement, National Institute of Technology and Standards, Korea.
|
6 |
KS L ISO 9597 (2019), Determination of setting time and soundness of cements, National Institute of Technology and Standards, Korea.
|
7 |
Park, L.K., Im, J.C. (2004), "Suggestion of a design method for UAM", Journal of the Korean Geotechnical Society, Vol. 20, No. 3, pp. 97-106.
|
8 |
Shin, H.K., Jung, H.S., Kim, D.H., Ryu, Y.S., Kim, D.H. (2019), "Development of rapidly hardening seal material applicable to steel pipe multistage grouting", Journal of Korean Tunnelling and Underground Space Association, Vol. 21, No. 2, pp. 301-321.
DOI
|