건설공사 품질관리 기준이 대폭 강화된다. 국토해양부는 최근 건설공사의 품질확보와 부실시공 방지를 위해 건설공사 품질관리개선 종합대책을 마련하여 추진할 계획이라고 밝혔다. 국토해양부는 이번에 수립된 대책을 통하여 국내 건설현장의 품질관리 수준을 선진국 수준으로 끌어 올리고 주요국책사업은 물론 민간건설현장의 부실시공을 지속적으로 차단해 나갈 계획이다. 자세한 내용은 다음과 같다.
Korean Journal of Construction Engineering and Management
/
v.25
no.3
/
pp.17-26
/
2024
Quality management work at construction sites demands substantial time and effort, involving the preparation of documents in Excel, approval processes, and the execution of quality tests. These Excel-based tasks include printing quality test reports, performing quality tests, generating and approving test reports, and preparing management ledgers. This division of processes extends the duration of work and diminishes efficiency. Accordingly, a cloud-based construction site quality management system was developed to enhance the productivity of quality management work. The purpose of this study is to analyze the productivity of the construction site quality management system, which is in the early stages of implementation at construction sites. This study implemented the construction site quality management system at a road construction site and scrutinized subsequent alterations in the quality management workflow before and after the implementation. Additionally, a survey was conducted among quality control engineers to collect data on work time both before and after the introduction of the construction site quality management system. Based on the collected data, the Monte-Carlo simulation method was applied to analyze the productivity improvement effect of the construction site quality management system, and the results were presented. The results of this study can serve as foundational data for future research endeavors focused on the automation of quality management works.
Korean Journal of Construction Engineering and Management
/
v.7
no.2
s.30
/
pp.71-80
/
2006
It is required to study systematical on the concrete quality management to extend structure life because rebuilding effect is reducing under present condition of large sized and high stories structure. Concrete, which shows its intensity by hydrating action and a big change in quality according to hot weather and temperature, produces a lot of quality problem under hot and cold weather. Because of each specification and construction plan which does not have basic standard on site, concrete's quality is irregular and makes some defect. As a result, Dae-gu is fumed out to be the longest area after investigating application period and days focused on 8 cities weather information about t relationship between hot weather circumstance and construction environment. Therefore, we first surveyed the curing construction processing in the region and found out the problem of quality management. Then figure out the way of solution. Moreover, we integrated curing quality management, which is applied differently to each site, to have equal quality and to reduce defect from construction site. And then, based on various test of construction condition and analysis of quality management item, we suggest effective concrete quality management to make curing construction standard guide and plan under hot weather.
Proceedings of the Korea Information Processing Society Conference
/
2019.05a
/
pp.231-234
/
2019
본 논문에서는 레미콘 타설 공정에서 스마트폰으로 현장 검사와 품질관리가 가능하도록 모바일 레미콘 품질 관리 시스템을 제안하였다. 또한 현장검사를 디지털화하기 위한 실시간 슬럼프 데이터 처리 부분을 함께 제안하였다. 검사자의 스마트폰을 이용하여 레미콘 현장검사의 영상을 실시간으로 전송하여 오류를 판단하고 레미콘 제품 이상 여부를 현장과 본사에서 실시간 공유가 가능하도록 하였다. 개발대상기술은 실제 결과 값과 영상 이미지 분석 등으로 제품에 대한 이상 여부가 판단되며 회사 및 현장에 적합한 정보 제공이 가능하다. 레미콘 품질 데이터 분석을 기반으로 원자재 관리 데이터와 연동함으로써 레미콘 업종의 가장 큰 문제 사항인 원자재 반입에 따른 최적의 배합 비율 제시가 가능하다.
Proceedings of the Korean Institute of Building Construction Conference
/
2019.11a
/
pp.90-91
/
2019
When the fire door is recently installed in the field, there are frequent cases where the fire door is manufactured with fire door having low quality or different structure compared to the performance that the fire door producer has confirmed in the performance test or the construction specification. Accordingly, on-site quality management and maintenance guideline for fire doors were presented. In this paper, we tried to explain the requirements for the construction of fire doors during the on-site quality management and maintenance guideline for fire doors presented in the study.
Proceedings of the Korean Statistical Society Conference
/
2003.10a
/
pp.53-58
/
2003
최근 경제 사회의 급속한 발전에 따라 개인의 활동분야가 다양해지고 개인비밀보호 인식이 커지면서 응답자들이 통계조사에 잘 협조하지 않는 경우가 늘어나고 있다. 따라서 대부분의 통계를 현장조사에 의존하여 생산하고 있는 통계청에서는 현장조사 결과물의 품질상태에 좀 더 관심을 가져야만 하게 되었다. 이러한 현장조사에 대한 풀질관리의 일환으로 현재 통계청에서는 통계별 조사대상으로부터 품질관리표본(Quality Control Sample)을 추출하고 이를 대상으로 리인터뷰를 실시함으로써 응답오차측정, 조사현장의 실터파악, 응답자 의견수렴 등에 활용하고 있다. 리인터뷰는 조사직원의 고의적인 자료조작 또는 보충교육 필요성 등 현장조사업무를 평가하거나 응답분산(simple response variation), 응답편의(response bias) 등을 산출하고, 이를 분석하는 모델을 이용하여 응답결과의 신뢰도를 분석하는데 목적을 두고 있다. 본 연구에서는 품질관리표본(QC Sample) 설계 및 추출, 리인터뷰 시나리오개발, CATI(Computer Assisted Telephone Interviewing)를 이용한 리인터뷰 기법 등을 통계청 사업체조사 모니터링 사례를 중심으로 설명하고 조사직원 특성별 응답오차 측정 및 비교, 정확성 항목에 대한 차이분석 등 격과에 대하여 논하고자 한다.
Korean Journal of Construction Engineering and Management
/
v.17
no.1
/
pp.110-118
/
2016
Construction projects are getting more complex and larger-sized with a high economic growth rate and development of new construction technologies. In addition, interests and demands on standards of construction quality are further increasing. This trend requires more systematic and a higher level of construction quality management. While the government has strengthened the regulations for quality assurance, many quality problems have repeatedly occurred mainly due to lack of recognition for quality management and quality control systems. To address this issue, this paper aims to suggest quality management improvement scheme through analyzing 3,443 nonconforming items identified during inspection of 393 construction sites from March 2012 to October 2014. The quality management improvement scheme suggested in this research is expected to prevent quality problems and defects and thus improve construction performances.
Journal of the Korea Institute of Building Construction
/
v.23
no.5
/
pp.595-605
/
2023
With the escalating prevalence of modular construction projects, there is a concurrent surge in scholarly and industrial intrigue in this domain, leading to a broadened spectrum of its applications. Modular construction, inherently facilitated by controlled factory settings, boasts the capability to consistently deliver edifices of superior quality. To optimize this advantage, the judicious integration of quality assurance methodologies during the site-specific phases of lifting and assembly is non-negotiable. This research embarked on a survey directed at project stakeholders, aiming to gauge the perceived significance and efficaciousness of prevailing quality preservation and oversight protocols during the aforementioned site stages, subsequently employing the Importance-Performance Analysis(IPA) for data interpretation. The findings elucidated that, while a majority of quality assurance procedures were adeptly executed, perceptual disparities existed among stakeholders regarding certain aspects, prompting recommendations for enhancement. This investigative endeavor lays a foundation, aiding future studies in amplifying the quality assurance cognizance among professionals during modular construction's site-assembly phase.
Korean Journal of Construction Engineering and Management
/
v.10
no.2
/
pp.34-45
/
2009
In domestic, the Quality Management system of construction work has been compounded of the association of regulation which is ground for relevant law and operation of Quality Management system by ISO/KS A 9001(QMS) established by the contractor. Two quality guaranteed systems must be operated with complementary and integrated system, but we can not make full use of QMS of contractor and only run routinized quality management system in all construction project by the standard, methods, process provided in the law. These problems were demanded better condition in the past ten years, since the ISO standards have been introduced. Establishing preventive consideration of quality management by setting a goal of drastic quality guarantee is an urgent problem of construction industry. This study is quick to fellow, which should do three things. 1. The attitude survey related quality management of staff in charge in construction site has run. 2. Base on these results, we adjust satisfaction measurement about operation of construction quality management system. 3. Subsequently, we want to offer our thesis about advanced opinion for the next.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.373-378
/
2001
In order to analyze the problems and improvement methods in the quality management of domestic apartment construction projects, this study derived the four barrier factors through relevant literature survey and interviews with construction practitioners. Among these four factors, which are 1) policies and regulations, 2) technologies, 3) human and organization, and 4) other miscellaneous aspects, the human and organization factor is the main focus of this survey and it was decomposed into perception, management system, education, and system on quality management according to the Taguchi's S/N theory to survey existing problems and suggest improvement methods for them. The survey on the quality perception showed that all the members need to cooperate actively, and CEO and chief construction managers should recognize the quality as the highest priority and act by themselves accordingly. The survey on the quality management showed that they need to reform their business process to reduce redundant tasks and miscommunications among participants. Quality education should be provided in a way that people at different management level can be educated differently with close relation to their practices. Quality systems should help corrective actions against quality problems at construction fields. Also with clear quality management implantation polices and objectives, the quality system should be established in order to support better communication among project stakeholders.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.