• Title/Summary/Keyword: 현수구조

Search Result 791, Processing Time 0.023 seconds

Simplified 2D Analysis for Suspension Bridges Subject to Wind Excitation (현수교 풍진동에 관한 2D 간단해석 및 변수연구)

  • Kim, Woo Seok;Lee, Jaeha
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.26 no.6
    • /
    • pp.463-470
    • /
    • 2013
  • In this paper, 2D simple analyses were performed in order to predict the large torsional oscillations in a suspension bridge based on Makenna and Tuama model(2001). The existing model(Makenna and Tuama, 2001) has shown unrealistic results as the wind speed increases and frequency decreases. Furthermore, resonance could not be simulated by the existing model. Therefore, in this study, new model was proposed with a consideration of the torsional resistance. The vertical and rotational behaviors of the deck in the suspension bridge were analyzed. Analysis results showed that at first vertical oscillations were observed and it was gradually transformed to the rotation oscillations. With the consideration of the torsional resistance, it was shown that vertical behavior were stabilized as time passed. However, the rotational behavior was not stabilized and was kept until the end of analysis. Beat periods decreased while the wind speed increased. The resonance of the rotational mode was dependent to the rotational resistance. Obtained results could be applied for the design of the suspension bridge under the wind load.

Application of TMD to Reduce Seismic Response of Arch Structure (아치구조물의 지진응답 저감을 위한 TMD의 적용)

  • Kim, Gee-Cheol;Kang, Joo-Won;Kim, Hyun-Su
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.27-30
    • /
    • 2010
  • TMD(Tuned Mass Damper)는 대표적인 제진장치로서 주로 고층건물, 교량 및 스타디움의 객석 등의 진동제어에 이용되고 있다. 그러나 대공간구조물과 같이 면외 방향의 강성이 매우 작은 구조물에 대한 TMD 적용에 대한 연구는 거의 전무한 실정이다. 본 연구에서는 아치구조물의 진동에 대한 TMD의 제어 성능을 TMD의 설치위치 및 거동방향에 따라서 비교분석하였다. 아치구조물은 수평지진동에 대해서는 역대칭모드인 1차 모드가 지배적이며, 연직지진동에 대해서는 대칭모드인 2차 모드가 지배적인 진동응답을 보이고 있다. 따라서 아치구조물의 효율적인 진동응답제어를 위해서는 진동모드가 탁월한 위치에 TMD를 설치하는 것이 합리적이다. 그리고 수평지진동 및 수직지진동에 대하여 TMD가 수평방향으로 거동하도록 하는 것보다 연직방향으로 움직이도록 설치하는 것이 아치구조물의 진동제어에 있어서 매우 효과적인 것으로 나타났다.

  • PDF

Low-power implementation of MPEG audio subband filter using arithmetic unit (덧셈기를 사용한 MPEG audio 부대역 필터의 저전력 구현)

  • Oh Sae-Man;Park Hyun-Su;Jang Young-Beom
    • Proceedings of the KAIS Fall Conference
    • /
    • 2004.11a
    • /
    • pp.131-133
    • /
    • 2004
  • 이 논문에서는 MPEG audio 알고리즘의 필터뱅크를 덧셈을 사용하여 저전력으로 구현할 수 있는 구조를 제안하였다. 제안된 구조는 CSD(Canonic Signed Digit) 형의 계수를 사용하며, 입력신호 샘플을 최대로 공유함으로서 사용되는 덧셈기의 수를 최소화하였다. 제안된 구조는 알고리즘에서 사용된 공통입력 공유, 선형위상 대칭 필터계수를 이용한 공유, 공통입력을 이용한 블록 공유, CSD 형의 계수와 공통패턴 공유를 통하여 사용되는 덧셈의 수를 최소화할 수 있음을 보였다. Verilog-HDL 코딩을 통하여 시뮬레이션을 수행한 결과, 제안된 구조는 기존의 곱셈기 구조의 구현면적과 비교하여 $59.6\%$를 감소시킬 수 있음을 보였다. 또한 제안된 구조의 전력소모도 곱셈기 구조와 비교하여 $59.6\%$를 감소시킬 수 있음을 보였다. 따라서 곱셈기가 내장된 DSP 프로세서를 사용하지 않고도, Arithmetic Unit나 마이크로프로세서를 사용하여 효과적으로 MPEG audio 필터뱅크를 구현할 수 있음을 보였다.

  • PDF

Estimation Model for Approximate Construction Quantities of Suspension Bridge in Early Stage (사업기획단계에서의 현수교의 물량추정을 위한 모델연구)

  • Park, Weon-Tae;Chun, Kyoung-Sik
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.6 no.4
    • /
    • pp.24-29
    • /
    • 2015
  • Bridge construction cost estimates have generally been conducted by using historial unit-price(per meter or square meter). The traditional estimating method based on unit-price references can never completely reflect the specialty of cable supported bridge. In this paper, we have developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous suspension bridge with 2-pylons. First of all, we'd analyzed the design information (such as structural design report, blueprint and quantity) and the real cost data from the existing suspension bridges and derived the design variables of the bridges. We developed the BIM wizard that generates a suspension bridge model parametrically based on derived design variables. The principle material quantities of suspension bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. We have established the system that the construction cost can be estimated more specific than the traditional estimating method.

A Study on Determination of Cable-Tension Using Unstrained-Length-Modification Method (초기길이 수정법(ULMM)을 이용한 케이블 장력 결정에 관한 연구)

  • Kong, Min Sik;An, Chan Hyeog;Yhim, Sung Soon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.2
    • /
    • pp.113-120
    • /
    • 2008
  • This study presents the ULMM(unstrained-length-modification method) to determine the cable tension consistent with target tension after arrangement of cable-members by controlling the unstrained length of cables. This method used to be shown to determine the exact unstrained length for cable-supported bridge with elastic catenary cable. The some verification examples show to determine the unstrained length that satisfies the target tension and to obtain the satisfactory result for cable-supported bridge. Accordingly this modification method of the unstrained length in this study is used to introduce the satisfactory target tension.

A Simplified Series-Parallel Structure for the RPPT(Regulated Peak Power Tracking) System (RPPT 시스템을 위한 단순화된 직.병렬 구조)

  • Yang, J.H.;Bae, H.S.;Lee, J.H.;Cho, B.H.
    • Proceedings of the KIPE Conference
    • /
    • 2007.11a
    • /
    • pp.72-74
    • /
    • 2007
  • 기존에 사용된 저궤도 인공위성 전력계 시스템을 분석하고, 시스템의 효율을 향상시키는 단순화된 직병렬 구조를 제안한다. 인공위성이 지구를 공전하는 동안 상황에 따라 변화하는 제안된 구조의 동작을 모드로 분류하고, 제안한 시스템을 안정적으로 운용하기 위해 시스템 운용 알고리즘을 제안한다. 모의 실험을 통하여 기존의 직렬구조와 제안된 구조의 효율을 비교 한다. 제안된 단순화된 직병렬 구조의 안정적인 동작을 검증하기 위해, 200W급 태양전지와 100W급 전력조절기 두 모듈을 병렬로 구성하여 실험하였다.

  • PDF

Transverseless AFRAMAX급 이중선체 유조선 구조부재의 안전성평가

  • 백점기;김도현;봉현수;김만수;한성곤
    • Bulletin of the Society of Naval Architects of Korea
    • /
    • v.30 no.2
    • /
    • pp.31-43
    • /
    • 1993
  • 본 연구에서는 힁부재가 없는 AFRAMAX급 신구조 방식의 유조선을 개발하고자 하였다. 설계의 기본 개념은 1) 이중선체구조를 채용하여 해난사고 발생시 기름유출 방지를 피하고, 2) 힁부재가 없는 극히 단순한 선체구조를 채용하여 용접 로봇등을 활용한 자동건조 비율을 높임으로써 건조 생산성을 향상시키는데 주안점을 두고 있다. 설계 결과 얻어진 선체구조는 기존의 유조선 구 조와 매우 상이하다. 초기구조설계단계에서 구조 부재의 치수는 기존의 선급설계 지침을 활용 하여 결정하였으나, 기존의 유조선 구조와 비교하여 구조배치가 크게 바뀌어 졌기 때문에 기존의 선급설계지침을 만족했다고 해서 구성부재와 국부구조뿐만 아니라 구조 전체적으로도 충분한 구조안전성을 가지고 있는지는 확실치 않다. 따라서 직접구조해석에 의한 구조안전성 평가가 필수적으로 요구되며, 이를 위해 저자들은 선체구조의 최종 종강도(ultimate longitudinal strength), 최종 힁강도(ultimate transverse strength) 및 최종 국부강도(ultimate local strength )를 기준으로한 구조안전성 평가를 수행하였다. 본 논문에서는 이들 중에서 국부 구조부재에 대한 안전성평가 문제만을 다루었다. 결론적으로, 본 연구에서 개발한 선체구조는 건전상태(intact condition)하에서 뿐만 아니라 손상상태하에서도 구조부재는 좌굴 또는 붕괴하지 않고 전반적 으로 충분한 구조안전성을 가지고 있다는 결론을 내릴 수 있었다.

  • PDF

A Structural Analysis Model for the Initial Configuration of a Suspension Bridge Considering the Erection Method of Stiffening Girders (보강형의 시공방법을 고려한 타정식 현수교의 초기형상해석 모델)

  • Ko, Seong Seok;Kang, Sung Hoo;Park, Sun Joon;Jung, Jae Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.4A
    • /
    • pp.337-346
    • /
    • 2009
  • To determine the initial configuration of the suspension bridge appropriate idealization model and analysis procedure are proposed as considering the boundary and loading conditions of stiffening girder during the erection. The construction stages of a suspension bridge are divided into two steps which are the first stage of the erection and the second stage of the completion in terms of the erection time of stiffening girders, and depending upon such an erection step the initial configuration analysis is classified the first configuration analysis and the revision analysis of the second configuration. The boundary and loading conditions and the analysis procedures for each stage are suggested and the results are verified by comparing with existing data. The results show that the proposed method provides better solution compared to the results using existing method.

Applications of Displacement Response Estimation Algorithm Using Mode Decomposition Technique to Existing Bridges (모드분해기법을 이용한 변위응답추정 알고리즘의 실교량 적용)

  • Chang, Sung-Jin;Kim, Nam-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3A
    • /
    • pp.257-264
    • /
    • 2010
  • Generally, estimations on the displacement as an important factor in evaluating the safety of large structures could be a barometer assessing whether the condition of the structure is deteriorating. Practically, it is not easy how to measure the displacement response to large structures like suspension bridges. In this study, as a method for estimation displacement response from strain signals, mode decomposition technique is proposed. Total displacement response is estimated by superposing quasistatic displacement response and modal displacement responses in dominant modes with larger contributions after estimating the modal displacement responses. If foiled strain gauges are used to measure strain signals, there would likely to generate electric noise, what's more, the more measuring points there are the more economic burden it could be. In order to solve such problems, fiber optic bragg-grating(FBG) sensors were used, which have multi-point measurements with no effect on electric noises. Therefore, the experiment was performed through dynamic load test of suspension bridge and plate-girder bridge to review the possibility for using mode decomposition technique.

The Method of construction for YoungJong Grand Bridge (영종도 연육교 적용 공법)

  • Shin HyunYang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.239-253
    • /
    • 2000
  • 영종대교는 2000년대 수도권 항공수요에 대비하여 영종도와 용유도 일원의 간석지에 건설되어, 인천국제공항과 인천 경서동을 연결하는 총연장 4,420m의 해상교량으로 현수교 3경간(550m), Truss교 18경간 (2,250m), 강상형교 27경간(1.620m)로 구성되어 있다. 영종대교는 10개 차선, 철도 2개 차선의 교량으로 건설된다. 교량이 건설되는 해역은 10,000ton급 선박의 통행이 가능하도록 교하공간 35m의 현수교를 계획 하였으며 경제성을 고려하여 Cable을 보강형에 정착시켰다. 미관을 고려한 경간 분할에 따른 교량의 부상을 방지하기 위하여 단부교각에 Link 구조를 설치하고 접속교를 Counterweight로 이용하였으며 Cable 장력이 저감되도록 Sag비를 1/5(=f/1)로 설정하였다.

  • PDF