Development of a Prototype S-100 Data Model (프로토타입 해사데이터 모델 개발)

  • Kang, Namseon;Son, Gumjun;Jeong, Yujun;Kim, Hyejin
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.24 no.5
    • /
    • pp.527-536
    • /
    • 2018
  • In this paper, we developed a prototype model accident management SMART-Navigation project. In order to develop a prototype model, we analyzed the status of maritime data exchange standard and procedure. We developed accident management prototype application schema, feature catalog and portrayal catalog in accordance with S-100 standard data model development procedure by collecting requirements related services and referring to related standards. In order to verify accident management prototype model, we test data set based on Gwang-yang Port. The prototype model and test data verified verification software, and it was confirmed that the designated symbol was displayed at the correct position through the S-100 simple viewer.

AIS application program implementation and test based on IMO Maritime Cloud analysis (IMO 마리타임 클라우드 분석을 통한 AIS응용 프로그램 구현 및 테스트)

  • Lee, Jea-Wook;Mun, ChangHo;Lee, Seojeong
    • Journal of Digital Contents Society
    • /
    • v.16 no.6
    • /
    • pp.927-934
    • /
    • 2015
  • IMO e-Navigation is ongoing project for safety navigation and protection of maritime environment. Maritime Cloud is a part of e-Navigation Strategy Implementation Plan. It is IT framework technology for exchanging information among maritime stakeholders. We found configuration and operation process by analysis on Maritime Cloud architecture and EPD which is a client program. Through the result, we actually implemented client program. Client program targets Berthing data serviced on AIS-ASM. And we used MMS which is function of message exchanging of Maritime Cloud. The test result show data exchanging succeeded. And it will be helpful to develop Maritime Cloud service, to advance Korean Maritime Cloud.

A Case Study of Improving EA Updating by Connecting PMS (PMS 연계를 통한 EA 현행화 개선 사례 연구: 국토해양부 정보화프로젝트 관리시스템을 중심으로)

  • Kang, Jae-Hwa;Kim, Seung-Kwan
    • Journal of Information Technology and Architecture
    • /
    • v.9 no.4
    • /
    • pp.423-432
    • /
    • 2012
  • EA (Enterprise Architecture) is an SI (System Integration) approach, i.e., a comprehensive plan for SI, which shows the elements of SI and the relationships among them. Since EA can be utilized in every stages of SI, the more large-scaled and complicated SI projects are, the more important EA is. Although many central government agencies and wide local governments implemented EA, the current level of EA utilization is still low. One of the reasons is the low level of EA updating. Some reasons of the low level of EA updating are the low frequency of EA updating, and the shortage of workers, as well. In order to improve the frequency of EA updating and alleviate the workloads of SI officers, MLTM (Ministry of land, transport, and maritime affairs) standardized the processes and documents for SI projects, and implemented PMS (Project Management System) that can support the unifying management of SI projects and be connected with EA system. We expect that EA information are updated efficiently, the level of EA utilization is boosted, and the qualities of SI products are improved, by the implementation of the PMS connected with EA system.

Estimating the Economic Value of Securing the High Seas Marine Biological Resources Using the Contingent Valuation Method (조건부 가치측정법을 이용한 공해상 해양생명자원 확보의 경제적 가치 추정)

  • Se-Jun Jin;Young-Ju Kwon;Eun-Chul Choi
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.29 no.7
    • /
    • pp.794-801
    • /
    • 2023
  • The high seas, covering the majority of the world's oceans, hold invaluable marine resources crucial for the growth of the marine bio-industry. The High seas bioresources program of South Korea is at the forefront of these global efforts. This study aims to gauge public awareness and quantify the project benefits, offering insights for future policy decisions. The results revealed that the estimated annual average willingness to pay (WTP) was 3,778.8 KRW, equating to approximately 81.54 billion KRW when extrapolated to the entire national population. The implications of the study are twofold: The project benefits, based on WTP, are substantial, amounting to approximately 81.5 billion KRW annually. This provides critical reference material for future policy formulation, given the considerable WTP in comparison to the current investment. Although interest in international sea marine biological resources is growing, public awareness remains relatively low. However, the project plays a crucial role in building essential databases for the marine bio-industry and securing international sea marine biological resources. Public interest and sustained support are pivotal, not only for this project but also for future policy implementation. Strategies to enhance public awareness are essential, and the study results offer valuable input for future policy decisions.

Biodiversity Conservation and the Yellow Sea Large Marine Ecosystem Project (생물다양성 보전과 황해 광역 해양생태계 관리계획)

  • Walton, Mark
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.13 no.4
    • /
    • pp.335-340
    • /
    • 2010
  • The paper describes the objectives of Yellow Sea Large Marine Ecosystem (YSLME) project, focusing on procedural and practical aspects. YSLME is a highly productive sea yet possibly one of the most impacted large marine ecosystems, in terms of anthropogenic stressors, due the enormous coastal population. The aim of the YSLME project is the reduction of ecosystem stress through identification of the environmental problems in the Transboundary Diagnostic Analysis (TDA) that are then addressed in the Strategic Action Programme (SAP). One of the major problems found to be affecting biological diversity is habitat modification through wetland reclamation, conversion and degradation. Since the early 1900's more than 40% of intertidal wetlands have been reclaimed in Korea, and 60% of Chinese coastal wetlands have been converted or reclaimed. Damaging fishing practices, pollution and coastal eutrophication have further degraded the coastal environment reducing the biological diversity. To combat this loss, the YSLME project has mounted a public awareness campaign to raise environmental consciousness targeted at all different levels of society, from politicians at parliamentary workshops, local government officer training events, scientific conferences and involvement of scientists in the project research and reporting, to university and high school students in our visiting internship programmes and environmental camps. We have also built networks through the Yellow Sea Partnership and by liaising and working with other environmental organizations and NGOs. NGO's are recognised as important partners in the environmental conservation as they already have extensive local networks that can be lacking in international organisations. Effective links have been built with many of these NGOs through the small grants programme. Working with WWF's YSESP project and other academic and research institutions we have conducted our own biodiversity assessments that have contributed to the science-based development of the SAP for the YSLME. Our regional targets for biodiversity outlined in the SAP include: Improvements in the densities, distributions and genetic diversity of current populations of all living organisms including endangered and endemic species; Maintenance of habitats according to standards and regulations of 2007; and a reduction in the risk of introduced species. Endorsement of the SAP and its successful implementation, during the proposed second phase of the YSLEM project, will ensure that biological diversity is here to benefit future generations.

A Production Planning System for Assembly Process of Offshore Structure Modules (해양구조물의 모듈조립공정을 위한 생산계획법)

  • Jeong-Je Kim;So-Heum Park
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.29 no.1
    • /
    • pp.173-190
    • /
    • 1992
  • Considerable number of offshore platforms have been built in Korean shipyards ever since 1976. Unlike for the cases of building ships, however, negligible efforts have been made to establish planning methodology for building onshore platforms. Severe congestion has been shown in the processes of assemblying modules of platforms. The module which is the upper part of a platform is a steel structure accommodating various types of outfittings and machinaries. The production planned without proper consideration on allocating work loads by trade used to show severe interferences among trades of workers and resulted in delayed completion. In this paper, a method of planning module assembly in consideration of leveling work loads by trade is discussed. A system of planning has been formulated and tested on a exampled case of producing a mix of 72 modules. The test showed a possibility of saving 31% of manpower and trimming 11% of through put time.

  • PDF

Analysis of the Relationships Between the Perceived Usefulness, Satisfaction, and Continuous Participation Intention of Marine Healing Program Participants (해양치유 프로그램 참여자의 지각된 유용성, 만족, 지속참여의도간 관계 분석)

  • Hye-Jin Yoon;Seung-Mook Choi;Jang-Won Hong;Hyun-Ju Lee;Gyung-Yeol Park
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.29 no.7
    • /
    • pp.750-759
    • /
    • 2023
  • The Korean government and industry practitioners have rapidly increased their interest in marine healing programs after the COVID-19 pandemic. However, research related to understanding the perceived usefulness, participant satisfaction, and benefits of marine healing experience from a consumer-oriented perspective is still lacking. This study used the post acceptance model to continuously examine the relationship between the perceived usefulness, expectancy confirmation, participant satisfaction, and intention to participate in a marine healing program. A survey was conducted by trained interviewers every weekend from September to October 2022 on the participants of marine healing programs in Busan city, and 203 samples were used for the analysis. The results showed that expectancy confirmation for the marine healing program positively affected satisfaction with the program and the perceived usefulness of the program. Moreover, satisfaction of the participants with the marine healing program positively affected their intention to continue participating. Additionally, the perceived usefulness of the healing program positively affected program satisfaction and continuous participation intention.

A Study on the Development of Curriculum for the Navigation Science Department of the Kenya Maritime College (케냐해양대학 항해학과 교과과정의 개발에 관한 연구)

  • Hong, Joon-Kee;Jung, Yun-Chul
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.22 no.6
    • /
    • pp.679-687
    • /
    • 2016
  • In developing countries, the establishment of maritime colleges and the training of excellent merchant marine officers can greatly impact on the growth of the marine industry in a given country. The project to establish the Kenya Maritime College ('KMC') has been driven by the Kenyan government, which has been challenged by the growth of the marine industry in Korea. This study aims to the development of curriculum for the navigation science department of the KMC. To do this, firstly the Kenyan environments was surveyed. Then, IMO maritime education requirements, IMO model courses and curriculums from the navigation science departments of major maritime universities around the world were reviewed. Lastly, based on these surveys and reviews, curriculum for the navigation science department of the KMC was developed. This curriculum is comprised of an educational course that requires a total of 5 years of study, including 1 year of on-board training and a total of 200 credit hours (20 credit hours per semester). Although this curriculum has been developed to fit the environments of Kenya, it is expected to offer a point of reference for similar studies in other countries with the goal of standardizing maritime education internationally.

A Study on the Legal Liabilities of Contractor as a Delay in the Product Delivery on the Offshore Plant Construction Contract (해양플랜트공사계약상 제조물인도지연에 따른 당사자의 법적 책임에 관한 고찰)

  • Jin, Ho-Hyun
    • MARITIME LAW REVIEW
    • /
    • v.29 no.2
    • /
    • pp.115-144
    • /
    • 2017
  • The impact of the global financial crisis, which began in the United States in 2007, had a major impact on the domestic shipping and shipbuilding industries. In this regard, the domestic shipyard has established an order-taking strategy in several ways as an alternative to lowering the amount of construction of commercial vessels due to deterioration of the shipping industry, and selected industrial sector was the offshore plant sector. However, the domestic shipyard has under performed the offshore plant in order to just increase sales and secure work without any risk analysis for EPC contracts. As a result, the shipyard has been charged more than the initial contract price with the offshore plant contractor, or the shipyard has become a legal issue requiring payment of liquidated damages due to delays in delivery of the product. The main legal disputes are caused by the thorough risk analysis and the inexperience of process control that can occur during offshore plant construction. and In particular, there is no sufficient review of the unequivocal provisions in the contract as an element of risk management. There is no human resource to review these contractual clauses. Therefore, this study identifies the existence of specific risks that could lead to delays in offshore plant construction, and examined the existence of any unequivocal clauses in contracts for offshore plant construction. and also discussed how the toxic clause applies to the actual parties and how the concrete risk factors in the construction contracts are transferred and expressed by referring to the interviews with the project manager of the domestic shipyard and the previous research. As a result, This paper examined the legal liability of the contracting parties regarding delayed delivery of the products due to the offshore plant construction contract. And to improve the domestic shipbuilding industry.

Effects of Ambient Temperature Change on the Internal Pressure Change of Multi-Layered Subsea Pipeline (주위 온도변화가 다층구조 해저 파이프라인 내부 압력변화에 미치는 영향)

  • Yang, Seung Ho
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.25 no.6
    • /
    • pp.772-779
    • /
    • 2019
  • The subsea pipeline has received considerable attention as a high-value-added industry linked to the energy and steel industries including natural resource development. The design and installation of the subsea pipeline require a variety of key technologies to carry out the project. In particular, a thorough pre-verification process through pre-commissioning is essential for the safe operation of the subsea pipeline. The hydrotesting stage in the pre-commissioning process of the subsea pipeline is known to be affected significantly by the ambient temperature change; however, there is a little study based on the theoretical and numerical approach. In this study, the method of predicting the internal temperature change using the transient heat transfer method for the stage of hydrotesting during the pre-commissioning process of the subsea pipeline and the prediction method of the pressure variation in the pipeline using it were proposed. The predicted results were compared with field test results and its effectiveness was verified. The proposed analysis procedure is expected to contribute to the productivity improvement of the subsea pipeline installation project by enabling the prediction of pressure variation through pipeline heat transfer simulation from the initial design stage of the subsea pipeline installation project.