• Title/Summary/Keyword: 한국형발사체개발사업

Search Result 13, Processing Time 0.031 seconds

KSLV-II Cost Estimate using TRANS COST 7.1 (TRANSCOST 7.1을 적용한 실용위성 발사체 비용추정)

  • Seo, Yun-Kyoung;Oh, Bum-Seok
    • Aerospace Engineering and Technology
    • /
    • v.6 no.2
    • /
    • pp.119-125
    • /
    • 2007
  • Space launch vehicle development needs many kinds of technologies synthetically. Nowadays, KARI (Korea Aerospace Research Institute) has developed a space launch vehicle, KSLV-I (Korea Space Launch Vehicle-I), that is able to load with an 100kg payload. After that it plans to develop Korean Space Launch Vehicle. As space launch vehicle becomes more complicate and larger, it needs a scientific and analytic development cost estimation. In this paper a cost estimation for KSLV-II using TRANSCOST 7.1 was studied.

  • PDF

한국형발사체개발사업을 위한 EVMS 적용방안에 관한 연구

  • Seo, Gyeon-Su;Choe, Yeong-In;Lee, Hyo-Yeong;Hong, Il-Hui
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.37 no.2
    • /
    • pp.152.1-152.1
    • /
    • 2012
  • 한국형발사체개발사업은 대형복합시스템 사업이며, 장기간에 걸쳐 개발이 진행되는 사업이다. 따라서 사업적, 기술적 측면의 불확실성과 위험 등이 존재하며, 이를 적절히 관리 통제하지 못하면 비용 상승, 일정 지연 및 기술성능 요구조건 등의 불만족을 초래한다. 따라서 개발사업 초기단계에서부터 일정, 비용, 기술성능 및 위험관리 등을 위한 종합적 사업관리시스템 구축 및 운용은 개발사업 성공의 주요 관건이다. 현재 한국형개발사업단에서는 이러한 요구조건을 만족시키기 위한 일환으로써 일정 및 비용에 대한 효과적 관리시스템인 EVMS(Earned Value Management System)을 구축하여 운용 중에 있으며, 한국형개발사업에 맞는 최적화된 EVMS을 구축하기 위하여 시스템 커스터마이징 작업을 수행 중에 있다. EVMS의 구축과정에서 가장 고심했던 문제는 WBS 개발과 성과(Earned Value) 측정방법의 선정이었다. WBS의 경우, 개발초기단계에서부터 사업 전체를 포괄하는 완벽한 WBS을 개발하는 것은 상당히 어려운 문제이다. 그러나 사업초기에 존재하는 불확실성 및 위험에도 불구하고 개발을 계속 진행해야 하는 상황은 개발 현장에서 자주 접하게 되는 문제이다. 이러한 문제를 해결하기 위해서 적용하는 유용한 기법이 연동계획하기(Rolling Wave Planning)이다. 한국형개발사업을 위한 EVMS 구축과정에서도 이와 같은 문제에 봉착하게 되어 WBS 개발 시 연동계획하기(Rolling Wave Planning)기법을 적용할 예정이다. 성과(EV) 측정방법의 경우, 퍼센트완료기법과 마일스톤+퍼센트완료기법 등을 선정하여 적용 중에 있다. 현재 연구개발사업의 특성을 고려하여 우선 퍼센트완료기법을 적용하여 성과를 측정하였으나, 성과측정 결과의 주관성 문제로 인하여 마일스톤+퍼센트완료기법을 적용하여 성과(EV) 측정 결과의 객관성을 최대한 확보 할 예정이며, 최종적으로 한국형개발사업에 최적화된 성과측정 기법을 개발할 예정이다.

  • PDF

Stakeholder's Expectations in the National Space Exploration Enterprise (우리나라 우주개발사업에서 이해당사자(Stakeholder)의 기대조건)

  • Lee, Chang-Jin
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.39 no.11
    • /
    • pp.1077-1085
    • /
    • 2011
  • Various stakeholder's expectations and constraints are to be efficiently resolved into a program consensus prior to the beginning of its substantial design processes. This study focuses on the analysis of the stakeholder's expectations in determining the design requirements at the initial stage of space exploration programs including Naro launcher and currently on-going KSLV-II program. Naro program seems to unilaterally account for the government expectations of accelerating program phase speed without making any efforts to converge various expectations from related sectors. The planning of Naro launcher is also found lack of the concept of operations (ConOps), which is of critical importance by envisaging the operational applications of end products. Similarities are found in KSLV-II program regarding the lack of implementation for stakeholder's expectations. Moreover, the government plan for KSLV-II disclosed without considering all expectations and other comments. The increase in design conflicts and program uncertainties would be unavoidable, if the government plan for KSLV-II would be insisted. It is required to modify the government plan and to establish the ConOps with the convergence of stakeholder's expectations at this early stage of the program.

An introduction to present Research and Development condition about Solid Rocket Motor for Space Launch Vehicle (우주발사체용 고체 추진기관 개발현황 소개)

  • Kwon, Tae-Hoon;Shim, Myung-Sik;Song, Jong-Kwon;Lee, Won-Bok;Choi, Seong-Han;Suh, Hyuk
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2009.11a
    • /
    • pp.623-626
    • /
    • 2009
  • Hanwha Corporation Daejeon Plant have developed apogee Kick Motor of KSLV-I that is the first among nation space launch vehicle for five years from 2003. Now, we are joining in KSLV-II(Korea Space Launch Vehicle-II) project and developing Pyro starter which is turbo pump for the first start-up of liquid propulsion supply.

  • PDF

A Survey on Health Monitoring and Management Technology for Liquid Rocket Engines (액체로켓엔진의 건전성 감시및 관리 기법에 관한 현황 분석)

  • Cha, Jihyoung;Ha, Chulsu;O, Suheon;Ko, Sangho
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.18 no.6
    • /
    • pp.50-58
    • /
    • 2014
  • This paper is about a short survey on the recent research activities regarding health monitoring and management for liquid rocket engines. For this, we investigate the precedent techniques developed in advanced space-industry countries which are USA, EU, Russia, Japan and China. Particularly, we focus on the technologies applied in China, a recently joined to the advanced space-industry countries in this field. Then we discuss some important points to be considered to apply to the development of the Korea Space Launch Vehicle KSLV-II and other related projects.

Introduction of Engine System Development Document Management System(ESDD) 3.0 for KSLV-II (엔진시스템개발 문서관리시스템(ESDD) 3.0 소개)

  • Choi, Young-In;Jeong, Eunhwan;Kim, Jinhan
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2017.05a
    • /
    • pp.1169-1170
    • /
    • 2017
  • Engine System Development Document management system(ESDD) 2.0 has already been operated for systematic engine systems development of KSLV-II. In addition, ESDD 3.0 is under development to manage the documents of before and after engine tests. In this paper, the concept and direction of ESDD 3.0 will be briefly described.

  • PDF

A Study on Improvement on National Legislation for Sustainable Progress of Space Development Project (우주개발사업의 지속발전을 위한 국내입법의 개선방향에 관한 연구)

  • Lee, Kang-Bin
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.25 no.1
    • /
    • pp.97-158
    • /
    • 2010
  • The purpose of this paper is to research on the contents and improvement of national legislations relating to space development in Korea to make the sustainable progress of space development project in Korea. Korea has launched its first satellite KITST-1 in 1992. The National Space Committee has established "The Space Development Promotion Basic Plan" in 2007. The plan addressed the development of total 13 satellites by 2010 and the space launch vehicle by 2020, and the launch of moon exploration spaceship by 2021. Korea has built the space center at Oinarodo, Goheng Province in June 2009. In Korea the first small launch vehicle KSLV-1 was launched at the Naro Space Center in August 2009, and its second launch was made in June 2010. The United Nations has adopted five treaties relating to the development of outer space as follows : The Outer Space Treaty of 1967, the Rescue and Return Agreement of 1968, the Liability Convention of 1972, the Registration Convention of 1974, and the Moon Treaty of 1979. All five treaties has come into force. Korea has ratified the Outer Space Treaty, the Rescue and Return Agreement, the Liability Convention and the Registration Convention excepting the Moon Treaty. Most of development countries have enacted the national legislation relating to the development of our space as follows : The National Aeronautic and Space Act of 1958 and the Commercial Space Act of 1998 in the United States, Outer Space Act of 1986 in England, Establishment Act of National Space Center of 1961 in France, Canadian Space Agency Act of 1990 in Canada, Space Basic Act of 2008 in Japan, and Law on Space Activity of 1993 in Russia. There are currently three national legislations relating to space development in Korea as follows : Aerospace Industry Development Promotion Act of 1987, Outer Space Development Promotion Act of 2005, Outer Space Damage Compensation Act of 2008. The Ministry of Knowledge Economy of Korea has announced the Full Amendment Draft of Aerospace Industry Development Promotion Act in December 2009, and it's main contents are as follows : (1) Changing the title of Act into Aerospace Industry Promotion Act, (2) Newly regulating the definition of air flight test place, etc., (3) Establishment of aerospace industry basic plan, establishment of aerospace industry committee, (4) Project for promoting aerospace industry, (5) Exploration development, international joint development, (6) Cooperative research development, (7) Mutual benefit project, (8) Project for furthering basis of aerospace industry, (9) Activating cluster of aerospace industry, (10) Designation of air flight test place, etc., (11) Abolishing the designation and assistance of specific enterprise, (12) Abolishing the inspection of performance and quality. The Outer Space Development Promotion Act should be revised with regard to the following matters : (1) Overlapping problem in legal system between the Outer Space Development Promotion Act and the Aerospace industry Development promotion Act, (2) Distribution and adjustment problem of the national research development budget for space development between National Space Committee and National Science Technology Committee, (3) Consideration and preservation of environment in space development, (4) Taking the legal action and maintaining the legal system for policy and regulation relating to space development. The Outer Space Damage Compensation Act should be revised with regard to the following matters : (1) Definition of space damage and indirect damage, (2) Currency unit of limit of compensation liability, (3) Joint liability and compensation claim right of launching person of space object, (4) Establishment of Space Damage Compensation Council. In Korea, it will be possible to make a space tourism in 2013, and it is planned to introduce and operate a manned spaceship in 2013. Therefore, it is necessary to develop the policy relating to the promotion of commercial space transportation industry. Also it is necessary to make the proper maintenance of the current Aviation Law and space development-related laws and regulations for the promotion of space transportation industry in Korea.

  • PDF

Study on KSLV-II Program's Budget Execution Management (한국형발사체개발사업 예산 집행 관리 방안 연구)

  • Lee, Hyo Young;Cho, Dong Hyun;Yoo, Il Sang
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.1
    • /
    • pp.73-78
    • /
    • 2017
  • Space development program is a large and complex system consisting of a multi-disciplinary high-end technologies and it is important to implement a program management system connected with systems engineering as well as to develop critical technologies. Major organizations in space fields carry out effective budget execution management and operation according to the strategy and objective of space development using information systems. Korea Space Launch Vehicle II(KSLV-II) has adopted a cost management plan using a system engineering to complete the program within the assigned schedule and budget. This paper introduces the budget execution management system applied to KSLV-II budget management and the budget execution dashboard system for supporting program decision making.

Systems Engineering Processes for KSLV-II Program (한국형발사체개발사업 시스템엔지니어링 프로세스)

  • Park, Chang-Su;Kim, Keun-Taek
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.2
    • /
    • pp.81-87
    • /
    • 2014
  • The Korea space launch vehicle-II (KSLV-II) program aims at developing a national launch vehicle system capable of launching 1.5 ton satellite into a sunsynchronous orbit. It is the succeeding program to the Naro launch vehicle program. The KSLV-II is a large-scale complex system which requires a systematic approach to all parts of the program. The KSLV-II program is currently developing a tailored systems engineering process for its need. It references practices and lessons learned from developing Naro launch vehicle. Standardized NASA processes and INCOSE processes were also referenced and compared during development of the process framework. This paper introduces the systems engineering processes developed for the KSLV-II program.

PLM System Development for Data Management of KSLV-II Program (한국형발사체개발사업 정보 관리를 위한 PLM 시스템 구축)

  • Kwon, Byung-Chan;Park, Chang-Su;Kim, Keun-Taek
    • Journal of Aerospace System Engineering
    • /
    • v.8 no.2
    • /
    • pp.49-54
    • /
    • 2014
  • The main purpose of Korea Space Launch Vehicle II(KSLV-II) Program is to develop a domestic launch vehicle that can deliver a 1.5ton class application satellite into a Low Earth Orbit(600~800km). The data management is an essential factor in systems engineering for success of large-scale complex systems development, and it systematically manages the information and technical data for the total life-cycle of a system. In this paper, data management policies and processes on KSLV-II program are presented, and product life-cycle management system for KSLV-II program is also presented.