• Title/Summary/Keyword: 플랜트 프로젝트

Search Result 119, Processing Time 0.028 seconds

Management Research in Plant Construction;Introduction of research center (플랜트 프로젝트 관리체계 표준화 기술 개발;연구단 소개)

  • Lee, Young-Nam;Kim, Chan-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.213-220
    • /
    • 2006
  • Plant construction industry is a high value-adding industry because it is complex industry comprising engineering, procurements of equipments and construction. So, Revenue increase in overseas plant projects would boost up not only domestic construction industry but also growth of national economy. Recently, overseas plant-construction market is expanding dramatically. For instant, Middle-east countries are constantly increasing their orders for the construction of petro-chemical plants stimulated by sky-rocketing oil prices. The purpose of this research is to develop management techniques for plant projects such as work break-down structure, knowledge management system, logistics & procurement system, and risk assessment tools. We believe our research would contribute to the competion of Korean engineeing companies and contractors in overseas plant-construction market.

  • PDF

Development of Integrated Cost-Schedule Management Guidelines for EPC Modular Projects (EPC 모듈러 프로젝트의 원가·공정 통합연계관리 지침서 개발)

  • Kim, Donghee;Ha, Minhui;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.76-84
    • /
    • 2020
  • The rate of application of the modular plant in the plant industry is increasing, and for the success of the modularization projects, it is essential to develop and implement a systemized methodology across all phases of the project. However, Korean EPC firms lack project management capability when it comes to apply standardized methodology. Therefore, it is important to establish and systematize the cost/schedule integrated management method which are the two core elements of project management technology. This study was conducted to develop a methodology and guidelines for integrated management process for modular plant projects. The researchers developed a methodology for planning and managing cost and schedule, and integrated by module unit. Integrated cost and schedule methodology and guidelines developed can be used for various EPC modular plant projects to enhance the efficiency of project management.

A Knowledge-based Approach to Plant Construction Process Planning (지식 기반 플랜트 건설 공정 계획 시스템의 개발)

  • 김우주
    • Journal of Intelligence and Information Systems
    • /
    • v.7 no.1
    • /
    • pp.81-95
    • /
    • 2001
  • Plant construction projects usually take much higher uncertainty and risks than the projects from other domains. This implies the importance of plant construction project management should be more emphasized than the other domain. Especially, the overall successes of the projects often depend on the performance of process planning and scheduling performed at the initial stage of the project. However, most plant construction projects suffer great difficulties in establishing proper process planning and scheduling timely because of unstructureness and dynamicity of environment of the project itself In this paper, we propose a knowledge-based process planning and scheduling approach in a plant construction domain to cope this problem. First, we modulize process planning knowledge and present the knowledge representation scheme. Second, we propose an inferencing mechanism to build a process planning for plant construction based on the represented process planning knowledge. Since our approach automate the initial process planning, which was usually done by manual way, it can improve the correctness and also completeness of the process plan and schedule by reducing the time to plan and allowing simulations on the various situation. We also design and implement this our approach as a real working system, and it is successfully applied to real plant construction cases from a leading construction company in Korea. Based on this success, we expect our approach can be easily applied to the projects of other areas, while contributing to enhancement in productivity and quality of project management.

  • PDF

A Study on the Success Factors Related to the Performance of Power Plant Engineering Projects (발전플랜트 엔지니어링 프로젝트 성공요인 우선순위 도출 연구)

  • Suh, Jaeho;Lee, Dongmyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.11-22
    • /
    • 2024
  • Power plant engineering industry obtains EPC plan project and delivers results about electricity, measurement, machinery, and piping and so on. Its works are taken by projects. Although power plant engineering composes 2~5% of whole EPC project cost, it's one of the fundamentals because it affects process after planning step a lot. However, domestic power plant engineering companies' project performance ability is insufficient and there's a need for systematic performance. Thus, this study defined related factors of successful performance and analyzed the priority among them through analytical hierarchy process. All respondents recognized experience, knowledge, and communication as important factors. Administrators considered knowledge, experience, and communication. But hands-on workers considered experience, knowledge, human resources. Those who have experience in oversea project considered process, experience, human resources. However those who don't have experience in oversea project considered knowledge, experience, and communication. Recognition of important factors varies by the position and work experience of members.

Development of a Conceptual Estimate Methodology for Plant Construction Projects (플랜트 건설 프로젝트를 위한 개산견적 방법론 개발)

  • Kim, Hyun-Joong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.141-150
    • /
    • 2019
  • In the overseas plant construction market, the domain construction firms' construction capability has been greatly improved, but the capability of project management is evaluated to be insufficient compared to the technical aspect. Project management capabilities from the initial planning stage of project execution are regarded as the core competence of advanced construction companies. Among them, it is urgent to improve the capacity of conceptual estimate for domestic companies. In this study, the researchers surveyed and analyzed the methodology of estimating project cost in the planning phase of the plant project and developed an estimation method by conducting a case study analysis. Based on the logic of the cost index and parametric estimation method among the existing estimation methodology, the estimation tool was developed by deriving the input and output variables tailored to the plant project. The validity of the proposed methodology was evaluated by comparing the accuracy between the project estimate amount of the case project and the actual project amount. In order to increase the utilization of the developed conceptual estimate methodology,for plant construction project, it is necessary to systematize the data of the historical project data. Increasing the accuracy of future project cost estimates is directly related to increasing project award and profitability of the domestic construction company.

Suggestion of Procurement Strategy with Commodity Classification by Peter Kraljic Matrix (피터 크랄직 매트릭스 기법에 의한 자재 분류를 활용한 구매 전략 제안)

  • Choi, Hyun Koo;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.11 no.3
    • /
    • pp.53-63
    • /
    • 2015
  • 구매자는 일반 제조업에서 자재를 피터 크랄직 매트릭스 기법에 의해 경쟁품목, 일반품목, 전략품목, 위험품목으로 분류한 후 각 품목 특성에 맞추어 구매 전략을 수립한다. 피터 클라직 매트릭스란 구매 리스크와 비즈니스 영향도 즉 특정 품목의 구매 금액 비중에 따라 자재를 분류하는 기법이다. 본 논문은 플랜트 엔지니어링산업에서 플랜트 기자재를 대상으로 피터 클라직 매트릭스 기법에 의해 기자재를 분류한 후 각 품목 특성에 맞는 구매 전략을 제안하고 사례 기업인 A사가 사우디아라비아에서 수행하는 발전 플랜트 기자재에 제안한 구매 전략을 적용하여 그 효과를 검증한 것이다. 플랜트 엔지니어링산업은 수주산업인데 총 수주금액 중 구매가 차지하는 비중은 약 50~60%이다. 따라서 프로젝트를 수행할 때 원가를 절감하여 이익을 극대화하기 위해 구매는 매우 중요한 역할을 한다. 플랜트 기자재는 크게 회전기계류, 고정장치류, 전기자재류, 제어자재류, 배관자재류로 구분된다. 각 공종별 플랜트 기자재에 대해 구매 지출 분석을 한 후 피터 클라직 매트릭스 기법에 의해 플랜트 기자재를 분류한 결과 경쟁품목에는 열교환기, 저장탱크 등이 포함되었고 일반품목에는 전선관, 조명기자재, 밸브 등이 포함되었다. 또한 전략품목에는 가스터빈, 가스터빈 흡입공기 냉각장치 등이 포함되었고, 위험품목에는 가스터빈 고정 볼트 등이 포함되었다. 경쟁품목 중 다관형 열교환기는 공급자와 공동으로 원가 모델을 구축하는 전략을 수립했고 저장탱크의 경우에는 공급자에게 원자재를 사급하는 전략을 수립하였다. 그 전략을 A사가 수행하는 프로젝트에 적용한 결과 각각 20%와 6%의 원가 절감 효과를 얻었다. 일반품목 중 전선관은 구매 대행사를 활용하는 전략을 수립했고 조명기자재는 기술 사양 검토 과정을 생략한 구매 프로세스 간소화 전략을 수립하였다. 그 결과 약 10%의 원가 절감과 평균 5일의 발주기간을 단축할 수 있었다. 전략품목 중 가스터빈 흡입공기 냉각장치는 공급자와 포괄적 양해각서를 체결하여 공동으로 사업주에 대응하는 전략을 수립했고 그 결과 프로젝트 수행 안정성 확보와 공급자 조기 참여를 통한 발주 스케줄 단축을 이룰 수 있었다. 위험품목 중 가스터빈 고정볼트는 재고 확보 전략을 수립하여 자재의 부족이나 파손으로 인해 프로젝트 공기에 영향을 주지 않도록 리스크를 감소시키는 효과를 얻었다.

  • PDF